Gemini South Semester 2008B

PDF Version

The semester calendar shows multi-instrument queue nights, scheduled classical runs and engineering or commissioning blocks. Instruments potentially usable on queue nights are
indicated by the coloured-horizontal bands (see color key below). Note: ToO PIs should always check the "what's available now" pages that are linked from the contents list for
the most up-to-date information. Scheduled classical runs are indicated by the last characters of the GS-2008B-É program ID number.
Engineering or commissioning that involves one or more instruments is shown in the relevant instrument row(s). New and full moon dates are shown on the left.
Key: GMOS   T-ReCS   engineering  
Phoenix   NICI     F-2    
v 0.2 draft 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August GMOS                                                               August
1 new T-ReCS                                                                
16 full Phoenix                                                                
30 new NICI Commissioning    
  other                                                                
September GMOS                                                             September
14 full T-ReCS               C-2 C-6                                        
28 new Phoenix                                                              
  NICI Commissioning    
  other                                                              
October GMOS C-4                                                   C-5     October
14 full T-ReCS             Engineering shutdown: A&G, SCS, CP switch gear and T-ReCS preventive maintenance                      
28 new Phoenix                                                                
  NICI                   CAMPAIGN RUN #1  
  other                                                                
November GMOS                                                             November
12 full T-ReCS                                                        
26 new Phoenix                   C-3 C-1                                
  NICI CAMPAIGN RUN #2  
  other                                                                
December GMOS                                                               December
12 full T-ReCS                                                          
26 new Phoenix                                                                
  NICI CAMPAIGN RUN #3
  other                 F2 AT     F2 AT                    
[1]
January GMOS                                                               January
12 full T-ReCS                                                                
26 new Phoenix                                                                
  NICI CAMPAIGN RUN 4  
  other         F2 Commissioning     LGSA commissioning  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
NICI notes: NICI commissioning and campaign science blocks are tentative and may be re-scheduled as needed. It is expected that NICI will be mounted on a side port, and so will not require removal of T-ReCS.
The last campaign run is optional and will depend on how many people are trained to run a queue with NICI.
F2 Notes: F2 will need to pass AT in the up-looking and side-looking ports. We are also adding one commissioning run (two more pending).
The schedule is tentative depending on the actual date for F2 arrival in Chile. They can easily be moved +/- 1 month.
Created 22-May-2008 BR
Last updated 13 June 2008, PLG