The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on Gemini North and Gemini South. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2012B-Q-125 Limoges CA A continuing census of Galactic white dwarfs to 40 parsecs of the Sun GMOS 16.00
Execution Status active Dates Taken:
20120901 20120902 20121116 20121117 20121125 20121126 20121206 20121211 20121213 20121214 20121221 20121222 20121223 20130105 20130112 20130117
Completion Status:
100%
GN-2012B-Q-126 Neichel GS Testing the star formation histories derived from integral spectroscopy with resolved galaxies GMOS 15.00
Execution Status complete Dates Taken:
20120809 20120821 20120830 20121007 20121029 20121206 20121207 20121211 20121216 20121217 20121218 20121221 20121222
Completion Status:
100%
GN-2012B-Q-127 Titov AU Testing the standard cosmology with Very Long Baseline Interferometry (VLBI) GMOS 18.00
Execution Status active Dates Taken:
20120716 20120809 20120814 20120815 20120819 20120905 20120919 20121001 20121002 20121012 20121013 20121015 20121018 20121019 20121026 20121028 20121029 20121030 20121109 20121216 20130106
Completion Status:
99%
GN-2012B-Q-128 Villaume US Monitoring [O I] for Long Term Correlation with H-Alpha and Continnuum GMOS 8.60
Execution Status active Dates Taken:
20121007 20121103 20121105 20121106 20121218 20121228 20130105 20130116 20130302 20130825
Completion Status:
34%
GN-2012B-Q-129 Tisserand AU Detecting Oxygen-18 in DY Persei GNIRS 1.20
Execution Status complete Dates Taken:
20121216 20121218
Completion Status:
100%
GN-2012B-Q-130 Bassett AU Local counterparts to high-redshift turbulent galaxies: what are the stellar kinematics? GMOS / GMOS-S 0.50
Execution Status complete Dates Taken:
20121109 20121115
Completion Status:
100%
GN-2012B-Q-131 Leggett GS Near-Infrared Characterization of Y Dwarfs (Poor Weather) NIRI 6.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2012B-Q-132 Lemoine-Busserolle GS Nature and redshift confirmation of starburst galaxies at z~1 NIFS 12.00
Execution Status active Dates Taken:
20130106
Completion Status:
1%
GN-2012B-Q-133 McDermid GS Tracing recent accretion events through gas metallicity in early-type galaxies GMOS 5.50
Execution Status active Dates Taken:
20121202
Completion Status:
30%
GN-2012B-Q-134 Cichowolski AR Looking for the massive progenitors of the galactic shell G126.1--0.8--14 GMOS 2.30
Execution Status complete Dates Taken:
20121204 20121216 20121218
Completion Status:
100%
GN-2012B-Q-135 Schirmer GS Redshift determination of Seyfert-2 galaxies with quasar light echos GMOS 2.00
Execution Status active Dates Taken:
20121221 20121223 20121224
Completion Status:
99%
GN-2012B-Q-284 Beers US A Survey for Unrecognized Carbon-Enhanced Metal-Poor Stars in the Galaxy GMOS / GMOS-S 70.00
Execution Status complete Dates Taken:
20121027 20121028 20121029 20121030 20121031
Completion Status:
100%
GN-2012B-Q-286 Margheim GS Poor Weather Cosomolgy with SN Ia GMOS 15.00
Execution Status complete / SToO Dates Taken:
20121105 20121109 20121113 20121116 20121127 20121129 20121130
Completion Status:
100%

The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2012B-Q-135 Schirmer GS Redshift determination of Seyfert-2 galaxies with quasar light echos GMOS 2.00
Execution Status Dates Taken:
Completion Status:
0%
GS-2012B-Q-28 Smith UK Probing the Dynamics of Abell 3084 - A Joint Gemini/HST/Chandra Study of a Hyperbolic Umbilic Catastrophe GMOS-S 5.00
Execution Status complete Dates Taken:
20120828 20120829 20121120 20121123 20121124 20121125 20121128 20121207 20121208 20121229 20130115 20130117 20130119 20130120 20130122
Completion Status:
100%
GS-2012B-Q-84 Beers US A Survey for Unrecognized Carbon-Enhanced Metal-Poor Stars in the Galaxy GMOS-S 70.00
Execution Status complete Dates Taken:
20120830 20120903 20120904 20120905 20120906 20120907 20120909 20120910 20120912 20121010 20121011 20121013 20121014 20121015 20121023 20121025 20121026 20121027 20121102 20121123 20121126 20121127 20121128 20121129 20121130 20130104 20130106 20130120 20130422 20130509 20130510 20130512 20130514 20130516
Completion Status:
100%
GS-2012B-Q-85 Heinke CA Spectroscopy of a possible old nova in a globular cluster GMOS-S 2.00
Execution Status complete Dates Taken:
20120905 20120910 20121023 20121031
Completion Status:
100%
GS-2012B-Q-86 Margheim GS Poor Weather Cosomolgy with SN Ia GMOS-S 30.00
Execution Status active Dates Taken:
20121023 20121024 20121031 20121126 20121128 20121130 20121206 20130104 20130207 20130225 20130302 20130313 20130320 20130422 20130503 20130505 20130509 20130520 20130522 20130526 20130614 20130630 20130704 20130723 20130804 20130812 20131124
Completion Status:
100%
GS-2012B-Q-87 Neichel GS Auto-Consistent Test of Galaxy Star Formation Histories Derived from Resolved Stellar Population and Integral Spectroscopy GMOS-S 5.00
Execution Status active Dates Taken:
20130325 20130607 20130612 20130613 20130616 20130618 20130703 20130704 20130707 20130708 20130719 20130812
Completion Status:
100%
GS-2012B-Q-88 Bassett AU Local counterparts to high-redshift turbulent galaxies: what are the stellar kinematics? GMOS / GMOS-S 0.50
Execution Status Dates Taken:
20121221 20130106 20130610 20130703 20130707 20131120
Completion Status:
100%
GS-2012B-Q-90 Rodgers DD T-ReCS Open Call for IQ85 Observations between Sept 25 and Oct 9 TReCS 40.00
Execution Status active Dates Taken:
20120926 20120929 20120930 20121001 20121002 20121003 20121004 20121010 20121025 20121026 20121029 20121030
Completion Status:
55%
GS-2012B-Q-91 Sargent US Identifying B[e] Supergiants in the Magellanic Clouds from Photometry, Poor Weather Program GMOS-S 30.00
Execution Status complete Dates Taken:
20121126 20121206 20130113 20130114 20130115 20130116 20130117 20130119 20130120 20130207 20130306 20130520 20130629 20130701 20130703 20130704 20130731 20130812
Completion Status:
100%
GS-2012B-Q-92 Rodriguez CL Characterizing Newly Identified Young Stars Near the Earth GMOS-S 33.00
Execution Status complete Dates Taken:
20130112 20130122 20130124 20130125 20130307 20130520 20130526 20130612 20130615 20130616 20130629 20130630 20130701 20130702 20130703 20130704 20130707 20130708 20130723 20130724 20130727 20130801 20130802 20130920 20130921
Completion Status:
100%
GS-2012B-Q-93 Davidge CA Spectral Signatures of C Stars in Nearby Dwarf Irregular Galaxies GMOS-S 18.80
Execution Status active Dates Taken:
20130125 20130202 20130209 20130311 20130314 20130316 20130317
Completion Status:
15%
GS-2012B-Q-94 Gamen AR Searching for very massive binary systems among faint galactic WN stars GMOS-S 12.45
Execution Status Dates Taken:
20130104 20130105 20130111 20130112 20130113 20130115 20130117 20130207 20130208
Completion Status:
87%
GS-2012B-Q-95 Tisserand AU Observing Magellanic RCB candidates with GMOS GMOS-S 23.50
Execution Status active Dates Taken:
20130124 20130125 20130227 20130306 20130516 20130619 20130801
Completion Status:
20%
GS-2012B-Q-96 Pessev DD Integrated Light CaT Spectroscopy of Intermediate-Age Magellanic Cloud Clusters GMOS-S 10.00
Execution Status active Dates Taken:
20121225 20121226 20130103 20130119 20130122 20130307 20130320
Completion Status:
73%

 