[Mayan calendar]

Queue Summary : Semester 2008B Gemini North and Gemini South

The queues shown in the tables below summarise the programs that have been awarded time on Gemini North and Gemini South. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the header at the top of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.

There is an NGO support staff queue schedule for Gemini North and South


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2008B-Q-1 Bally US AO Imaging of the Explosive Orion OMC1 Outflow NIRI+AltairLGS 20.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-2 Bary US A Variability Study of the 10 um Silicate Feature in Actively Accreting T Tauri Systems Michelle 7.50 [r09B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GN-2008B-Q-3 Berger US Nebular-phase Spectroscopy of the Extraordinary SN2008D: The First Supernova Observed from Start to Finish GMOS 3.00 [r09B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GN-2008B-Q-4 Bersier UK The Supernovae of Gamma-Ray Bursts: Exploring the diversity of stellar explosions GMOS 6.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-5 Bildfell CA BCG Dynamics and Cluster Centres: Understanding a Symbiotic Relationship GMOS 7.30
Execution Status active Dates Taken:
20080913
Completion Status:
0%
GN-2008B-Q-6 Bloom AU/CA/UK/US Concerted Follow-up of Swift and GLAST GRBs (Gemini North) GMOS / NIRI 29.90
Execution Status active / RToO Dates Taken:
20080913 20080914 20080915 20081003
Completion Status:
17%
GN-2008B-Q-7 Chambers UH Quasar Candidates from PS1 at redshifts z ~ 7 GMOS 10.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-8 Chun UH Integral Field Spectroscopy of DLA absorbers NIFS+AltairLGS 5.00 [r09B]
Execution Status active / rollover Dates Taken:
20080911
Completion Status:
17%
GN-2008B-Q-9 Cote CA Canadian Gemini GMOS Imaging Contest for IYA 2009 GMOS 1.00 [r09B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GN-2008B-Q-10 Crockett UK/US Identifying progenitors of core-collapse supernovae NIRI+Altair / NIRI+AltairLGS 5.50
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-11 Crowther UK GMOS spectroscopy of Wolf-Rayet candidates in M74: Progenitors of Type Ib/c SN? GMOS 8.50 [r09B]
Execution Status active / rollover Dates Taken:
20080807 20080828 20080919 20080928
Completion Status:
41%
GN-2008B-Q-12 Cybulski US Spectroscopy of a Candidate T Dwarf from Spitzer NIRI 2.50 [r09B]
Execution Status complete / rollover Dates Taken:
20080810 20080812 20080818 20080819 20080820 20080825 20080826 20080827 20080828
Completion Status:
100%
GN-2008B-Q-13 Duchene US The spectral properties of metal-rich T dwarfs NIRI 6.50 [r09B]
Execution Status active / rollover Dates Taken:
20080812 20080824 20080908
Completion Status:
19%
GN-2008B-Q-14 Faifer AR The halo-globular cluster connection in the elliptical galaxies NGC 7626 and NGC 7619 GMOS 10.40
Execution Status complete Dates Taken:
20080804 20080808 20080809 20080810 20080825 20080826
Completion Status:
100%
GN-2008B-Q-15 Fassnacht US Evidence for luminous CDM substructure in a moderate-redshift lensing galaxy GMOS 3.00 [r09B]
Execution Status complete / rollover Dates Taken:
20080804 20080810 20080811
Completion Status:
100%
GN-2008B-Q-16 Gladman CA Orbit determination for Kuiper Belt Binary b7Qa4 GMOS 1.30
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-17 Kong US X-ray Localization of the Globular Cluster G1 in M31 GMOS 0.50
Execution Status complete Dates Taken:
20080831 20080901
Completion Status:
100%
GN-2008B-Q-18 Kotak UK Near-infrared observations of a highly unusual supernova NIRI+AltairLGS 9.00
Execution Status active Dates Taken:
20080819 20080916 20080921 20081004 20081007
Completion Status:
19%
GN-2008B-Q-19 Levesque UH The Environments of Long-Duration GRBs: Determination of Stellar Masses NIRI 3.00
Execution Status complete Dates Taken:
20080821 20080826 20081001
Completion Status:
100%
GN-2008B-Q-20 Lucas UK Precise ages and masses of free floating planetary mass brown dwarfs NIFS / NIFS+AltairLGS 20.00
Execution Status active Dates Taken:
20080823 20080824 20080902 20080928
Completion Status:
15%
GN-2008B-Q-21 Luhman US Spectroscopy of Candidate Brown Dwarfs with Disks GMOS / NIRI 7.10 [r09B]
Execution Status active / rollover Dates Taken:
20080815 20080820 20080901 20080902 20080908 20080913 20081001 20081002
Completion Status:
82%
GN-2008B-Q-22 Mackey AU/CA/UK Probing the Nature of Extended Star Clusters GMOS 23.70 [r09B]
Execution Status active / rollover Dates Taken:
20080706 20080712 20080713 20080714 20080804 20080811 20080825 20080828 20080830 20080831 20080903 20080904 20080905 20080906 20080907 20081001
Completion Status:
100%
GN-2008B-Q-23 Matheson US Constraining the Hubble Constant with a Type II Supernova GMOS 12.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-24 McConnachie AU/CA The dynamics of the Andromeda sub-group: spectroscopy of six new dwarf galaxies around M31 GMOS 24.00
Execution Status active Dates Taken:
20080806 20080919 20080923 20080930 20081003
Completion Status:
19%
GN-2008B-Q-25 Meech UH The Main Belt Comet Mission GMOS 3.00
Execution Status active Dates Taken:
20080909 20080923 20080929 20081002
Completion Status:
19%
GN-2008B-Q-26 Merritt US Kinematical Signatures of Recoiled Black Holes NIFS+AltairLGS 2.50 [r09B]
Execution Status complete / rollover Dates Taken:
20080815 20080816 20080909
Completion Status:
100%
GN-2008B-Q-27 Olsen US What is the Origin of M31's 10 kpc Ring? NIRI+Altair 13.40 [r09B]
Execution Status active / rollover Dates Taken:
20080818 20080819 20080824
Completion Status:
33%
GN-2008B-Q-28 Peterson CA/US The High Mass End of the Black Hole Mass - Stellar Velocity Dispersion Relation in AGNs: Calibrating the Quasar Mass Scale NIFS+AltairLGS 6.00
Execution Status complete Dates Taken:
20080817 20080818 20080819 20080913 20080915 20080916 20080918
Completion Status:
100%
GN-2008B-Q-29 Pinfield AU/GS/UK Confirming the first Y dwarfs from UKIDSS NIRI 39.90
Execution Status active / SToO Dates Taken:
20080810 20080811 20080818 20080819 20080821 20080822 20080823 20080825 20080829 20080901 20080902 20080912 20080922 20080930
Completion Status:
33%
GN-2008B-Q-30 Riffel BR Feeding vs. feedback in nearby active galaxies NIFS+AltairLGS 5.50 [r09B]
Execution Status active / rollover Dates Taken:
20080916 20080917 20080918 20080920
Completion Status:
100%
GN-2008B-Q-31 Roe US Titan's methane weather: Seasonal change and surface geology NIFS+Altair / NIRI+Altair 10.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-32 Ryder AU Altair Study of Supernovae in Luminous Infrared Galaxies NIRI+AltairLGS 5.50 [r09B]
Execution Status active / rollover / SToO Dates Taken:
20080913 20080917
Completion Status:
9%
GN-2008B-Q-33 Sand US Optical Spectroscopy of Hostless Supernovae Candidates GMOS 5.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-34 Sheppard US The First Known Binary Neptune Trojan GMOS 3.00 [r09B]
Execution Status active / rollover Dates Taken:
20080811 20080830 20081001
Completion Status:
35%
GN-2008B-Q-35 Soderberg US Revealing the Progenitors of Type Ibc Supernovae through Near-IR Spectroscopy NIRI 6.70
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-36 Soderberg US The Many Facets of Type Ibc Supernovae GMOS 4.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-37 Stockton UH Spectral-Energy Distributions of High-Redshift Galaxies NIRI 6.00 [r09B]
Execution Status complete / rollover Dates Taken:
20080815 20080816 20080817 20080819 20080820 20080825 20080826 20081006
Completion Status:
100%
GN-2008B-Q-38 Tonry UH Characterization of Pan-STARRS Transients GMOS 20.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-39 Torres UK/US The primary role of the SW Sextantis stars in the evolution of cataclysmic variables GMOS 6.40
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-40 Trujillo GS/US Primordial Solar System Ices NIRI 16.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-41 Warren UK The highest redshift quasars 5.8<z<7.2 in the UKIDSS LAS GMOS / NIRI 5.20
Execution Status active / SToO Dates Taken:
20080815 20080818
Completion Status:
26%
GN-2008B-Q-42 Willott CA z=6 quasars to probe the reionization of the universe GMOS 10.70
Execution Status active / SToO Dates Taken:
20080805 20080806 20080825 20080907 20080924
Completion Status:
35%
GN-2008B-Q-43 Willott CA Near-infrared spectroscopy of CFHQS z>6 quasars NIRI 15.00
Execution Status active Dates Taken:
20080901 20080908 20080909 20080910
Completion Status:
39%
GN Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2008B-Q-44 Barlow UK Optical and mid-IR observations of two dust-emitting SNe in the supernova factory NGC 6946 GMOS / Michelle 11.90
Execution Status complete Dates Taken:
20080706 20080707 20080709 20080714 20080804 20080805
Completion Status:
100%
GN-2008B-Q-45 Brotherton BR Spatially Resolved Optical Spectroscopy of a Nearby Post-Starburst Quasar GMOS 4.80
Execution Status active Dates Taken:
20080928
Completion Status:
2%
GN-2008B-Q-46 Burleigh UK Direct imaging of candidate planetary-mass companions to white dwarfs NIRI 7.90
Execution Status active Dates Taken:
20080809 20080810 20080819 20080820 20080921 20080929
Completion Status:
87%
GN-2008B-Q-47 Chrysostomou UK Testing the theory of magneto-centrifugal ejection from T Tauri disks NIFS+Altair 5.80
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-48 Cushing UH Precision Tests of Ultracool Dwarf Atmospheric Models NIRI 11.00
Execution Status active Dates Taken:
20080915
Completion Status:
3%
GN-2008B-Q-49 Fadely US A Gemini Search for Dark Matter Substructure NIRI 10.70
Execution Status active Dates Taken:
20080809 20080810 20080811 20080818 20080820 20080821 20080831 20080909
Completion Status:
60%
GN-2008B-Q-50 Farage AU Physical Mechanisms of AGN Feedback in X-ray Clusters GMOS 4.50
Execution Status active Dates Taken:
20080827 20080831 20080902 20080910
Completion Status:
55%
GN-2008B-Q-51 Fitzsimmons UK Adaptive optics studies of binary Near-Earth Asteroids NIRI+Altair 4.00
Execution Status active / SToO Dates Taken:
20080929 20080930 20081001
Completion Status:
14%
GN-2008B-Q-52 Foley US Optical Identification of Radio Transients Discovered by the Allen Telescope Array GMOS / NIRI 11.80
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-53 Geballe GS The Spatial Behavior of the Unidentified Infrared Bands in Planetary Nebulae Michelle / NIRI 15.00
Execution Status Dates Taken:
20080702 20080703 20080711 20080712 20080806 20080810 20080812 20080813 20080818 20080822 20080823 20080825 20080828
Completion Status:
85%
GN-2008B-Q-54 Gil-Hutton AR The size distribution of small Trans-Neptunian objects GMOS 6.70
Execution Status complete Dates Taken:
20080929 20080930
Completion Status:
100%
GN-2008B-Q-55 Gomez AR Astrochemistry of young protoplanetary disks NIRI 3.90
Execution Status active Dates Taken:
20080810 20080819 20080820 20080823 20080827 20080908 20080921 20080930 20081002
Completion Status:
56%
GN-2008B-Q-56 GOTO UH A search for high redshift QSOs at 7.8<z GMOS / NIRI 20.00
Execution Status active Dates Taken:
20080805 20080807 20080811 20080824 20080825 20080827 20080828 20080829 20080830 20080831 20080901 20080902 20080903
Completion Status:
100%
GN-2008B-Q-57 Henry US Completing the nIR Empirical Mass-Luminosity Relationships for the Lowest-Mass Stars NIRI+Altair 3.00
Execution Status active Dates Taken:
20080810 20080811 20080813 20080819 20080821 20080827 20080828 20080830
Completion Status:
91%
GN-2008B-Q-58 Hunter UK Late-time follow-up observations of a rare nearby supernova: 07gr. GMOS / NIRI 7.30
Execution Status complete Dates Taken:
20080829 20080901 20080903 20080904 20080905 20080906 20080908
Completion Status:
100%
GN-2008B-Q-59 Janson CA Direct imaging survey for planet and brown dwarf companions to the most nearby massive stars. NIRI+Altair 30.00
Execution Status active Dates Taken:
20080826 20080827 20080829 20080831 20080905 20080906 20080922 20080923 20080924
Completion Status:
27%
GN-2008B-Q-60 Jedicke UH PS1 solar system follow-up science GMOS / NIRI 10.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-61 Kanekar US Measuring Star Formation Rates in Damped Lyman-alpha Systems NIFS+AltairLGS 11.40
Execution Status active Dates Taken:
20080921 20080922 20081004 20081005 20081007
Completion Status:
100%
GN-2008B-Q-62 Krajnovic GS/UK Determining the unbiased low-mass end of the local Mbh-sigma relation NIFS / NIFS+AltairLGS 14.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-63 Luhman US Searching for the Bottom of the Initial Mass Function NIRI 16.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-64 Marois CA/UK/US Direct Exoplanet Search Around Young & Nearby Early-Type Stars; Completing the First Epoch Observations of the International Deep Planet Survey (IDPS) NIRI+Altair 30.50
Execution Status active Dates Taken:
20080829 20080830 20080901 20080902 20080904 20080905 20080906 20080907 20080908 20080909 20080921 20080924 20080925
Completion Status:
36%
GN-2008B-Q-65 Mason GS A NIRI search for the molecular gas in the dusty "molecular" torus NIRI 8.00
Execution Status active Dates Taken:
20080826 20080827 20080831 20080909 20081004
Completion Status:
66%
GN-2008B-Q-66 Matheson US Extending the ESSENCE Survey: Host Galaxies of High-Redshift Supernovae GMOS 17.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-67 Maund US Stellar Forensics: A post-explosion view of the progenitor of a Type IIP supernova GMOS 4.20
Execution Status active Dates Taken:
20080831 20080906 20080910
Completion Status:
43%
GN-2008B-Q-68 McConnachie AU/US The destructive path of NGC205 GMOS 8.00
Execution Status active Dates Taken:
20080812 20080823 20080827 20080828 20080829 20080923 20080926 20080928 20080929 20080930
Completion Status:
100%
GN-2008B-Q-69 Reipurth UH Visual Binaries in the Orion Nebula Cluster NIFS+Altair / NIRI+Altair 11.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-70 Rest CA/US Echoes of Historic Supernovae: Spectroscopy of the Tycho, Cas A, 3C 58, and Crab SNe at maximum light GMOS 20.00
Execution Status active / SToO Dates Taken:
20080929 20081001 20081002 20081003
Completion Status:
69%
GN-2008B-Q-71 Schiavon GS Improved Ages and Detailed Abundance Patterns of Cluster Galaxies at z~0.3 GMOS 21.00
Execution Status active Dates Taken:
20080806 20081003
Completion Status:
1%
GN-2008B-Q-72 Schiminovich AU/US Probing Small-scale Kinematic Structure of Local Lyman Break Galaxy Analogs NIFS+AltairLGS 17.60
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-73 Scholz UK A close-up view on the youngest brown dwarf Michelle / NIRI 4.60
Execution Status active Dates Taken:
20080823 20080824
Completion Status:
2%
GN-2008B-Q-74 Seth GS/US Surveying Nearby Nuclear Star Clusters NIFS+AltairLGS 14.60
Execution Status active Dates Taken:
20080816 20080817 20080911 20080912 20080913 20080915 20080919 20080921 20080922 20081004 20081005
Completion Status:
100%
GN-2008B-Q-75 Shemmer US Black-hole Mass and Growth Rate at High Redshift NIRI 25.00
Execution Status active Dates Taken:
20080812
Completion Status:
8%
GN-2008B-Q-76 Steele UK White dwarfs with unresolved substellar companions or debris disks in UKIDSS NIRI 18.10
Execution Status active Dates Taken:
20080812 20080821 20080824
Completion Status:
10%
GN-2008B-Q-77 Wright UK Low accretion mode or dusty star formation? AGN with starburst/Seyfert composite spectra NIFS+AltairLGS 14.00
Execution Status active Dates Taken:
20081006
Completion Status:
29%
GN-2008B-Q-78 Yee CA Constraining the Redshifts and Stellar Masses for Two Luminous z'-dropout Candidates NIRI 9.30
Execution Status active Dates Taken:
Completion Status:
0%
GN Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GN-2008B-Q-79 Allam US SDSS Giant Arcs GMOS 24.90
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-80 Artigau CA/GS Spectroscopic follow-up of high proper motion brown dwarf candidates NIRI 21.00
Execution Status SToO Dates Taken:
20080909 20080912 20080913 20080914 20080923 20080924 20080929 20080930
Completion Status:
47%
GN-2008B-Q-81 Aspin UH V1647~Ori, three years into quiescence GMOS / Michelle / NIRI 7.20
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-82 Bandara CA Integral field spectroscopy of gravitationally lensed galaxies with laser guided adaptive optics NIFS+Altair 10.60
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-83 Beck US Spatially Resolving Molecular Hydrogen Emission in Planet-forming Disks NIFS+Altair 17.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-84 Chambers UH Quasar Candidates from PS1 at redshifts z ~ 7 GMOS 10.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-85 Ciardullo US Planetary Nebulae and Chemical Evolution: Exploring Systematic Errors for Early Stellar Populations GMOS 33.00
Execution Status active Dates Taken:
20080903
Completion Status:
1%
GN-2008B-Q-86 Croll CA Imaging Long-Period RV Companions to Exoplanet Host Stars NIRI+Altair 8.20
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-87 Croll CA Searching for Atmospheric Absorption in the Transmission Spectra of hot Jupiters GMOS 8.50
Execution Status Dates Taken:
Completion Status:
0%
GN-2008B-Q-88 Dall GS/US VSOP: Fixing the variable sky with one-shot typing of neglected variables GMOS 56.90
Execution Status active Dates Taken:
20080618 20080619 20080623 20080624 20080627 20080805 20080822 20080823 20080910 20080912 20080913 20080914
Completion Status:
30%
GN-2008B-Q-89 Davidge CA The Archeology of the Outer Disk of M82 NIRI 11.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-90 Dobbie AU Methane and optical imaging of a Y dwarf candidate in the UKIDSS Deep Extragalactic Survey GMOS / NIRI 1.60
Execution Status complete Dates Taken:
20080902 20080910
Completion Status:
100%
GN-2008B-Q-91 Fesen US High Dispersion Late-time Spectra of Core-Collapse SNe GMOS 3.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-92 Figueredo UK NIFS K-band spectroscopic parallax of the HII region W3 NIFS+Altair 7.50
Execution Status active Dates Taken:
20080924
Completion Status:
1%
GN-2008B-Q-93 Fritz GS Kinematics and stellar populations of the most massive galaxies GMOS 16.50
Execution Status active Dates Taken:
20080822 20080823 20080824 20080905 20080906 20080907 20080908 20080909 20080910 20080928
Completion Status:
89%
GN-2008B-Q-94 Garnavich UK/US Social Insecurity: What Influences Stellar Death in Old Populations GMOS 40.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-95 Gies US Binaries among the Most Massive Stars NIRI+Altair 21.00
Execution Status active Dates Taken:
20081001 20081002 20081003 20081004 20081007
Completion Status:
25%
GN-2008B-Q-96 Gil-Hutton AR Searching for cometary activity in Centaurs with Gemini North GMOS 3.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-97 Gomez GS What physical mechanism bends the jets in Abell 562? GMOS 5.80
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-98 Goncalves BR The nearby dwarf spheroidal NGC185 chemistry: PNe versus its Seyfert 2 classification GMOS 2.80
Execution Status active Dates Taken:
20080809
Completion Status:
12%
GN-2008B-Q-99 Graham US Metallicity of a Dark Burst in a Very Bright Host GMOS 6.60
Execution Status active Dates Taken:
20080831
Completion Status:
10%
GN-2008B-Q-100 Granada AR The Innermost Circumstellar Regions of Be Stars: Structure and Physical Properties NIRI 2.50
Execution Status active Dates Taken:
20080822 20080825 20080909
Completion Status:
46%
GN-2008B-Q-101 Hodapp UH NIRI and Michelle photometry of Sigma Ori IRS Michelle / NIRI+Altair 2.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-102 Homan UK Revealing the nature of X-ray binary jets with Michelle and NIRI Michelle / NIRI 13.70
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2008B-Q-103 Jarvis UK The Fundamental Plane and Black-hole masses of z~0.5 radio galaxies GMOS 26.30
Execution Status active Dates Taken:
20080805 20080813 20080822 20080826 20080829 20080902 20080903 20080904 20080907 20080908 20080909 20080910 20080912 20080914 20080916
Completion Status:
66%
GN-2008B-Q-104 Johnstone UK The deepest spectra of an extended filament in NGC1275 GMOS 13.30
Execution Status active Dates Taken:
20080806
Completion Status:
0%
GN-2008B-Q-105 Kassis US Early evolution of photoevaporating protoplanetary disks: mid-infrared spectra of the Orion Nebula proplyds Michelle 11.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-106 Keane UH Characterizing the formation pathways for first generation ices in LDN 673 NIRI 10.00
Execution Status active Dates Taken:
20080822 20080823 20080915 20080916 20080930
Completion Status:
35%
GN-2008B-Q-107 Lafreniere CA/GS Spectroscopic characterization of new wide binary systems harboring a cool dwarf GMOS 16.20
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-108 Lebzelter US Long term variability of MIR-spectra of evolved stars Michelle 7.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-109 Lee US Present-Day Metallicities for Constructing Star-Formation Histories in Nearby Dwarf Galaxies (North, part 2 of 2) GMOS 8.00
Execution Status active Dates Taken:
20080806
Completion Status:
4%
GN-2008B-Q-110 Leggett GS An Infrared Spectroscopic Study of the States of Carbon in White Dwarf Atmospheres NIRI 4.50
Execution Status active Dates Taken:
20080912 20080913 20080923 20080924 20080929
Completion Status:
48%
GN-2008B-Q-111 Leggett CA/GS Measuring the Ages of New Old White Dwarfs Found in the UKIRT Infrared Sky Survey GMOS 8.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-112 Levan UK/US Swift GRB hosts at known redshift GMOS 16.80
Execution Status active Dates Taken:
20080805 20080806 20080807 20080825 20080829 20080901 20081004
Completion Status:
49%
GN-2008B-Q-113 Lima Neto BR Spectroscopy of very faint Coma cluster blue dwarf galaxies GMOS 4.00
Execution Status Dates Taken:
Completion Status:
0%
GN-2008B-Q-114 Lipari AR GMOS 3D-Spectroscopy of Fe II/Balmer Low Ionization BAL QSOs (at medium/high z) GMOS 2.50
Execution Status complete Dates Taken:
20080913 20080914 20080915 20080916 20080917 20080920 20080924
Completion Status:
100%
GN-2008B-Q-115 Lopes de Oliveira BR An extensive study of the fossil group 1RXSJ111107.2+6649 GMOS 3.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-116 Mason GS Further spectroscopic investigations of NGC 1068 Michelle 2.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-117 Matheson US Revealing the Heart of the Explosion: Nebular-Phase Spectroscopy of Type I Supernovae GMOS 13.10
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-118 Megeath US The Orion Protostar Survey: NIRI Spectroscopy of Spitzer Identified Protostars in the Orion Complex NIRI 24.00
Execution Status Dates Taken:
Completion Status:
0%
GN-2008B-Q-119 Patience AU/CA/UK/US Resolving the A Star Binary Population with Gemini AO NIRI+Altair 22.60
Execution Status active Dates Taken:
20080908 20080909 20080910 20080917 20080920 20080928 20080929
Completion Status:
33%
GN-2008B-Q-120 Piatti AR Galactic orbits of old open clusters : implications about the metallicity distribution in the early Galactic disk GMOS 4.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-121 Richter US Determining Inner-disk Chemistry Michelle / NIRI 1.60
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-122 Rupke UH Grain Destruction in Galactic Superwinds NIRI 10.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-123 Scholz CA Reaching for the bottom of the IMF: Spectroscopy of ultra-low mass brown dwarfs GMOS 6.00
Execution Status active Dates Taken:
20080810 20080903 20081004
Completion Status:
15%
GN-2008B-Q-124 Thompson US Measuring the Surface Inhomogeneity of Calcium on G~29-38 GMOS 20.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-125 Wahhaj UH Probing Terrestrial Planet Formation Around Nearby M Dwarfs Michelle 18.80
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-126 Ward UK AGN with extraordinarily broad, complex [O III] profiles; evidence for winds or mergers? GMOS 12.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-127 Whiting AU Searching for dusty absorbers in front of quasars GMOS 10.10
Execution Status active Dates Taken:
Completion Status:
0%
GN-2008B-Q-128 Willis UK Probing the inner dark matter structure of late-type galaxies using a SDSS lensing survey: Gemini North component GMOS 17.10
Execution Status active Dates Taken:
20080825 20080910
Completion Status:
6%

The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2008B-Q-1 Arriagada CL RR Lyrae in the Galactic bulge : the Milky Way's oldest population? GMOS-S 21.20 [r09B]
Execution Status active / rollover Dates Taken:
20080730
Completion Status:
12%
GS-2008B-Q-2 Berger AU/CA/GS/UK/US Gamma-Ray Bursts: From Progenitors to Probes GMOS-S 19.30
Execution Status active / RToO Dates Taken:
20080805 20080913 20080915 20080916 20080917 20080919 20080929 20081007
Completion Status: