[Mayan calendar]

Queue Summary : Semester 2013B Gemini North and Gemini South

The queues shown in the tables below summarise the programs that have been awarded time on Gemini North and Gemini South. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.

There is an NGO support staff queue schedule for Gemini North and South


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2013B-Q-1 Aller UH Finding the Elusive Substellar Members of Nearby Young Moving Groups GNIRS 24.00 [r14B]
Execution Status active / rollover Dates Taken:
20130804 20130805 20130811 20130827 20130828 20130903 20131016 20131017 20131029
Completion Status:
37%
GN-2013B-Q-2 Almeida BR Fundamental parameters for three unique young eclipsing binaries GNIRS+Altair 10.50 [r14B]
Execution Status active / rollover Dates Taken:
20130816 20130817 20130818 20131001 20131004 20131011 20131017 20131027 20131031 20131101 20131103 20131125
Completion Status:
26%
GN-2013B-Q-3 Babul CA The Impact of QSO B0910+410 On Its Surroundings NIFS+AltairLGS 18.90 [r14B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GN-2013B-Q-4 Bastien CA Variability of the active RY Tauri bipolar jet GMOS 1.70 [r14B]
Execution Status complete / rollover Dates Taken:
20130809 20130905
Completion Status:
100%
GN-2013B-Q-5 Bentz AU/US A Stellar Dynamical Black Hole Mass for the Reverberation-Mapped Active Galaxy NGC6814 NIFS+Altair 21.50 [r14B]
Execution Status active / rollover Dates Taken:
20130929 20130930 20131001 20131005 20131014 20131019 20131029 20131031 20131101 20131102
Completion Status:
34%
GN-2013B-Q-6 Berger AU/US Exploring the Cosmic Dawn, Galaxy Evolution, and Exotic Stellar Deaths with Rapid GRB Follow-Up Observations (North) GMOS / GNIRS / NIRI 14.40
Execution Status active / RToO Dates Taken:
20130823 20130831 20131025
Completion Status:
11%
GN-2013B-Q-7 Best UH L/T Transition Dwarfs in the Solar Neighborhood from Pan-STARRS1 and WISE GNIRS 2.00
Execution Status active Dates Taken:
20130817 20130818 20131027 20131028
Completion Status:
100%
GN-2013B-Q-8 Brodwin US The Massive Distant Clusters of Wise Survey (MaDCoWS) GMOS 32.00 [r14B]
Execution Status active / rollover Dates Taken:
20130731 20130803 20130805 20130806 20130807 20130808 20130809 20130813 20130815 20130827 20130829 20131007 20131010 20131019 20131021 20131027 20131028 20131029 20131031 20131101 20131104 20131125 20131126 20131130
Completion Status:
89%
GN-2013B-Q-9 Cenko CA Probing the Central Black Holes of Distant, Quiescent Galaxies via Tidal Disruption Flares (North) GMOS 2.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2013B-Q-10 Cidale AR Disentangling the population of evolved massive stars in the galaxy M31 GNIRS 8.60
Execution Status active Dates Taken:
20130803 20130807 20130809 20130813 20130814 20130819 20131006 20131008
Completion Status:
100%
GN-2013B-Q-11 Cidale AR Tracing mass-loss events of evolved massive stars GNIRS+AltairLGS 3.10
Execution Status active Dates Taken:
20130818 20131009
Completion Status:
17%
GN-2013B-Q-12 CĂșneo AR Spectroscopic metallicities of polluted visible componentatmospheres in black hole binary systems (North) GMOS 0.90
Execution Status complete Dates Taken:
20130813 20131023 20131105
Completion Status:
100%
GN-2013B-Q-13 Daemgen CA Proper motion follow-up of young planetary-mass companion candidates in Taurus NIRI+Altair 6.00 [r14B]
Execution Status active / rollover Dates Taken:
20130814 20130816 20130818 20130819 20130820 20130822 20130823 20130826 20131127 20131128
Completion Status:
74%
GN-2013B-Q-14 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (North) GMOS 15.00
Execution Status active Dates Taken:
20130802 20130803 20130804 20130806 20130907 20131004 20131101 20131104
Completion Status:
83%
GN-2013B-Q-15 Landt US Quasar SEDs - 'Reaching the Peak' GNIRS 5.10 [r14B]
Execution Status active / rollover Dates Taken:
20130816 20130818 20130819 20131027 20131125
Completion Status:
85%
GN-2013B-Q-16 Galicher CA Completing the follow-ups of the 300 stars of the International Deep Planet Survey NIRI+Altair 10.70 [r14B]
Execution Status active / rollover Dates Taken:
20130809 20130810 20130811 20130812 20130819 20130821 20130822 20130823 20131127
Completion Status:
73%
GN-2013B-Q-17 Geach CA Tracing the formation and evolution of star-forming galaxies across cosmic time: Completing the HiZELS/NIFS survey NIFS+Altair 23.00
Execution Status active Dates Taken:
20130724 20130928 20131003 20131004 20131006 20131009 20131010 20131011 20131014 20131020
Completion Status:
77%
GN-2013B-Q-18 Geballe GS H3+ absorption in the nucleus of NGC1068 GNIRS 3.50
Execution Status active Dates Taken:
20130824
Completion Status:
45%
GN-2013B-Q-19 Grundy US Mutual Orbits and Masses of Kuiper Belt Binaries and Multiple Systems NIRI+Altair / NIRI+AltairLGS 12.50
Execution Status active Dates Taken:
20130814 20130821 20130822 20130823 20130824 20130825 20130826 20130829 20130830 20130905
Completion Status:
96%
GN-2013B-Q-20 Howard UH Characterization of the Uranus-size planet GJ 3470b GMOS 10.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-21 Ikeda JP New constraints on the faint end of the quasar luminosity function at $z\sim5$ GMOS 2.00
Execution Status complete Dates Taken:
20130718 20130803
Completion Status:
100%
GN-2013B-Q-22 Inoue JP Spatial segregation of galaxy populations in the SSA22 z=3.1 proto-cluster GMOS 2.00
Execution Status complete Dates Taken:
20130805
Completion Status:
100%
GN-2013B-Q-23 Kasliwal US Rapid Spectroscopy of Elusive Transients and Young Supernovae (North) GMOS 4.80
Execution Status active / RToO Dates Taken:
20130829 20131107
Completion Status:
52%
GN-2013B-Q-24 Kavelaars CA Tracking in the Kuiper Belt, astrometric followup of CFEPS discoveries. GMOS 11.00 [r14B]
Execution Status active / rollover Dates Taken:
20130707 20130708 20130711 20130712 20130713 20130715 20130716 20130805 20130808 20130809 20130811 20130812 20130813 20130817 20130902 20130903 20130905 20130906 20130929 20131002 20131005 20131006
Completion Status:
100%
GN-2013B-Q-25 Keel US Fading AGN with giant ionized clouds: mode switching and outflows GMOS 10.00 [r14B]
Execution Status active / rollover Dates Taken:
20130813 20130814 20130827
Completion Status:
55%
GN-2013B-Q-26 Lagattuta CA/AUSVGSXCHKJPDSARUSDDCLUKGTUHBR A SHARPer Look at Substructure: Identifying the Redshifts of Gravitational Lens Systems GNIRS 4.00 [r14B]
Execution Status complete / rollover Dates Taken:
20130820 20130822 20131014 20131019
Completion Status:
100%
GN-2013B-Q-27 Leggett GS/US A Study of the 450K Transition from T to Y Dwarf, and of the 350K Y Dwarfs. (North) NIRI 3.70 [r14B]
Execution Status complete / rollover Dates Taken:
20130717 20130812 20130815 20131127 20131128
Completion Status:
100%
GN-2013B-Q-28 Lorenzo de Oliveira BR Chromospheric Activity in Old Open Clusters: NGC 188 GMOS 9.20 [r14B]
Execution Status active / rollover Dates Taken:
20130811 20130812 20130813 20130817 20131016 20131107
Completion Status:
21%
GN-2013B-Q-29 McConnell UH The Black Hole Safari Forges Ahead GMOS / NIFS+AltairLGS 22.50 [r14B]
Execution Status active / rollover Dates Taken:
20130808 20130809 20130811 20130821 20130904 20131007
Completion Status:
25%
GN-2013B-Q-30 McDermid AU/GS/US Driving the molecular outflow in NGC1266 NIFS+AltairLGS 9.00 [r14B]
Execution Status rollover Dates Taken:
20131021 20131022
Completion Status:
9%
GN-2013B-Q-31 Meech UH The UH ISON Team-: Development of Activity GMOS 2.20
Execution Status active Dates Taken:
20130710 20130711 20130827
Completion Status:
0%
GN-2013B-Q-32 Metchev US Weather on Other Worlds: Magnetic Fields or Clouds? (North) GMOS 13.30 [r14B]
Execution Status complete / rollover Dates Taken:
20130726 20130808 20130826 20130829 20130830 20130901 20130902 20130929 20130930
Completion Status:
100%
GN-2013B-Q-33 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (North) GMOS / GNIRS 22.50
Execution Status active / SToO Dates Taken:
20130809 20130810 20130811 20130816 20130817 20130818 20131005 20131007 20131123
Completion Status:
44%
GN-2013B-Q-34 Najita US The HCN/Water Ratio in Inner Disks: A Chemical \newline Signature of Planetesimal Formation? Texes 25.00
Execution Status active Dates Taken:
20131116 20131117 20131119 20131120 20131123 20131124
Completion Status:
91%
GN-2013B-Q-35 Ohsawa JP Investigation of the PAH size distribution in a compact HII region NIRI 3.80 [r14B]
Execution Status active / rollover Dates Taken:
20130720 20130819 20130826 20130831 20130903 20130904
Completion Status:
85%
GN-2013B-Q-36 Ohta JP A Forming Elliptical Galaxy at z=1.4 under multi-merging? NIFS+AltairLGS 7.50 [r14B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GN-2013B-Q-37 Parker US Targeted Recovery of Candidate Kuiper Belt Objects for New Horizons Flyby (North) GMOS 4.00
Execution Status active / SToO Dates Taken:
20130905 20130907
Completion Status:
55%
GN-2013B-Q-38 Pontoppidan US Are Herbig Ae disks really depleted of water vapor? Texes 8.00
Execution Status active Dates Taken:
20131117 20131118 20131119
Completion Status:
97%
GN-2013B-Q-39 Rogerson CA Spectroscopy of Photometrically Varying BAL Quasars (North) GMOS 4.51
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2013B-Q-40 Sosa AR Photometric study of the blazar MAGIC J2001+435 and its host galaxy. GMOS 3.20
Execution Status complete Dates Taken:
20130802
Completion Status:
100%
GN-2013B-Q-41 Stephens GS/BR/US CNO Abundances in Resolved M31 Globular Cluster Stars GNIRS+Altair 25.00
Execution Status active Dates Taken:
20130821 20130826 20130827 20130905 20130906 20131005 20131017 20131129
Completion Status:
40%
GN-2013B-Q-42 Tsang US Io's Atmosphere: Density above Volcanoes Texes 10.00
Execution Status active Dates Taken:
20131116 20131117 20131118 20131124
Completion Status:
100%
GN-2013B-Q-43 van Altena US A Snapshot Improvement in the Metal-Poor Mass-Luminosity Relation Visitor 2.20
Execution Status complete Dates Taken:
20130724 20130725 20130726 20130727 20130728
Completion Status:
100%
GN-2013B-Q-44 Walsh US Measuring Black Hole Masses in Compact, High-Dispersion Galaxies NIFS+AltairLGS 1.00
Execution Status Dates Taken:
20131017
Completion Status:
77%
GN-2013B-Q-45 Webster AU The structure of the central engine in quasars GMOS / NIFS 8.50
Execution Status active Dates Taken:
20131030 20131126
Completion Status:
4%
GN-2013B-Q-46 Young US Pluto's volatile distribution from speckle imaging Visitor 18.00
Execution Status active Dates Taken:
20130725 20130726 20130728 20130729 20130731
Completion Status:
51%
GN Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2013B-Q-47 Adamson GS Eruptive protostars from UKIDSS NIFS 4.70
Execution Status complete Dates Taken:
20130802 20130929 20131004 20131006 20131007 20131009 20131011 20131012 20131014 20131019 20131022
Completion Status:
100%
GN-2013B-Q-48 Alexandersen CA Plutino colours: a matter of size? GMOS 24.00
Execution Status active Dates Taken:
20130830 20130831 20130901 20130930 20131001 20131005 20131028 20131029 20131101 20131125 20131127
Completion Status:
64%
GN-2013B-Q-49 Bresolin UH Studying rejuvenation mechanisms in early-type galaxies GMOS 8.50
Execution Status active Dates Taken:
20130805 20130816 20130927 20130928 20131002 20131003 20131004 20131006 20131101 20131128
Completion Status:
81%
GN-2013B-Q-50 Chambers UH Quasars in the epoch of reionisation GNIRS 14.00
Execution Status active Dates Taken:
20130906 20130930 20131022
Completion Status:
26%
GN-2013B-Q-51 Cibirka BR Follow-up of Gravitational Arcs discovered with SOAR GMOS 6.10
Execution Status complete Dates Taken:
20130806 20130810 20131003 20131010 20131012 20131019 20131031 20131101
Completion Status:
100%
GN-2013B-Q-52 de Mooij CA Hotter than an M-dwarf: Optical day-side emission from KOI-13b & WASP-33b GMOS 12.00
Execution Status complete Dates Taken:
20130801 20130802 20130803 20130826 20130828 20130927 20130928 20131001
Completion Status:
100%
GN-2013B-Q-53 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (North) GMOS 15.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-54 Diniz BR Two-Dimensional Stellar Populations in Active Galaxies using NIFS NIFS+Altair 11.90
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-55 Foley US RAISIN: Tracers of Cosmic Expansion with SN Ia in the IR (North) GMOS 9.00
Execution Status active / SToO Dates Taken:
20130805 20130813
Completion Status:
33%
GN-2013B-Q-56 Fox AU/US Exploring Exotic Stellar Deaths with Standard TOO GRB Follow-Up Observations (North) GMOS / GNIRS / NIRI 4.00
Execution Status active / SToO Dates Taken:
20130831 20130902
Completion Status:
44%
GN-2013B-Q-57 Grundy US Mutual Orbits and Masses of Kuiper Belt Binaries and Multiple Systems NIRI+Altair / NIRI+AltairLGS 12.50
Execution Status Dates Taken:
Completion Status:
0%
GN-2013B-Q-58 Hagele AR Understanding the complex gas kinematics of compact, rapidly growing galaxies in the local Universe GMOS 3.60
Execution Status active Dates Taken:
20131030
Completion Status:
0%
GN-2013B-Q-59 Hall CA Monitoring Emergent Absorption Troughs in Quasars (North) GMOS 11.53
Execution Status active / SToO Dates Taken:
20130815 20130902 20130903 20130904 20130929 20131002 20131004 20131007 20131011 20131012 20131029 20131030 20131101 20131102
Completion Status:
85%
GN-2013B-Q-60 Hirst GS A search for the optical and NIR counterparts of the hotspots in Cygnus A. GMOS / NIRI 1.00
Execution Status complete Dates Taken:
20130711
Completion Status:
100%
GN-2013B-Q-61 Ingraham CA Near-Infrared (XJHK) Spectroscopy of Substellar and Planetary Mass Objects in Orion GNIRS 16.00
Execution Status active Dates Taken:
20130904 20131003 20131006 20131011 20131012 20131014 20131016 20131017 20131018 20131020 20131022 20131023 20131030 20131105
Completion Status:
89%
GN-2013B-Q-62 Jorgensen GS/US Stellar populations in the Lynx Super Cluster at redshift 1.26 GMOS 52.50
Execution Status active Dates Taken:
20130705 20131101
Completion Status:
1%
GN-2013B-Q-63 Lacy US A Study of the NGC 7538 IRS 1 high-mass star formation region Texes 7.50
Execution Status active Dates Taken:
20131116 20131117 20131118 20131119
Completion Status:
100%
GN-2013B-Q-64 Lamb CA Searching for Metal-Poor Stars in the Galactic Bulge GNIRS+Altair 3.40
Execution Status complete Dates Taken:
20130811 20130814 20130824 20130827 20130831 20130901 20130905 20130907
Completion Status:
100%
GN-2013B-Q-65 Leggett GS/US A new Y dwarf search probing the limits of WISE (North) GNIRS / NIRI 21.80
Execution Status active / SToO Dates Taken:
20130625 20130716 20130718 20130803 20130804 20130805 20130810 20130811 20130815 20130816 20130820 20130821 20130822 20130824 20130902 20131002 20131014 20131127 20131128 20131129
Completion Status:
100%
GN-2013B-Q-66 Mackey AU Dynamics of the accreted remote globular cluster system of M31 GMOS 12.00
Execution Status complete Dates Taken:
20130802 20130829 20130830 20130831
Completion Status:
100%
GN-2013B-Q-67 Mason GS Direct detection of the dust and accretion disk in low-luminosity AGN GNIRS+Altair 1.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-68 McConnell UH The Black Hole Safari Forges Ahead GMOS / NIFS+AltairLGS 9.60
Execution Status active Dates Taken:
20130902 20131021 20131101 20131106
Completion Status:
21%
GN-2013B-Q-69 Mechtley US PSF Star Selection for HST Program 12974: UV-Faint Quasars at z=6: Part II: Semester B Targets NIRI+AltairLGS 2.60
Execution Status complete Dates Taken:
20130821
Completion Status:
100%
GN-2013B-Q-70 Melin US Quantifying energy flows between Jupiter's magnetosphere, ionosphere, and thermosphere GNIRS 25.00
Execution Status Dates Taken:
Completion Status:
0%
GN-2013B-Q-71 Merline US High-Resolution Imaging of Asteroids/Satellites Visitor 10.00
Execution Status complete Dates Taken:
20130725 20130726 20130727 20130728 20130729
Completion Status:
100%
GN-2013B-Q-72 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (North) GMOS / GNIRS 22.50
Execution Status active / SToO Dates Taken:
20130811 20130812 20130816 20130902 20130903 20131009 20131013 20131021
Completion Status:
46%
GN-2013B-Q-73 Muzerolle US Accretion and Outflow in a Periodically-Varying Protostar GNIRS / NIFS+AltairLGS / NIRI 9.50
Execution Status active Dates Taken:
20131017 20131021 20131022
Completion Status:
36%
GN-2013B-Q-74 Nielsen US Exploring the intragroup medium with bent double lobe radio sources GMOS 12.60
Execution Status active Dates Taken:
20131101 20131128 20131130 20131202
Completion Status:
2%
GN-2013B-Q-75 Peeters CA Photo-chemical evolution of PAHs NIRI 9.00
Execution Status active Dates Taken:
20130903
Completion Status:
3%
GN-2013B-Q-76 Phillips US Near-Infrared Spectroscopy of Type Ia Supernovae GNIRS 10.00
Execution Status active / SToO Dates Taken:
20131123 20131126
Completion Status:
14%
GN-2013B-Q-77 Reipurth UH Infrared Spectroscopy of the HH 24 Multiple Protostellar System - NIRI and GNIRS GNIRS / NIRI+AltairLGS 13.00
Execution Status active Dates Taken:
20131028 20131125 20131127 20131128
Completion Status:
13%
GN-2013B-Q-78 Seth US Resolving the Most Massive Globular Clusters in the Local Group NIFS+AltairLGS 8.50
Execution Status active Dates Taken:
20131017 20131019
Completion Status:
10%
GN-2013B-Q-79 Torres CAAUSVGSXCHKJPDS/ARUSDDCLUKGTUHBR Probing the magnetospheres of massive stars with infrared diagnostics GNIRS+Altair 7.70
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-80 Zhou AU Measuring the temperature of a highly irradiated brown dwarf NIRI 18.00
Execution Status active Dates Taken:
20130827 20130901 20130907
Completion Status:
72%
GS-2013B-Q-73 Webster AU Understanding the Physics of the Broad Line Region Flamingos2 13.40
Execution Status Dates Taken:
Completion Status:
0%
GN Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GN-2013B-Q-81 Beers US Missing metal-poor stars from the HK and Hamburg/ESO Surveys (North) GMOS 50.00
Execution Status complete Dates Taken:
20130724 20130731 20130803 20130807 20130826 20131003 20131004 20131007 20131008 20131009 20131010 20131011 20131013 20131014 20131017 20131019 20131020 20131021 20131022 20131026
Completion Status:
100%
GN-2013B-Q-82 Carr US Molecular Shielding and Photodissociation of H$_2$O in the Disks of T Tauri Stars Texes 17.00
Execution Status active Dates Taken:
20131116 20131123 20131124
Completion Status:
32%
GN-2013B-Q-83 Daemgen CA Protoplanetary disk lifetimes revisited - The frequency of disks around single stars and binary components as a function of age. NIFS+Altair 12.60
Execution Status active Dates Taken:
20131107
Completion Status:
0%
GN-2013B-Q-84 Ferrero AR A High Resolution Near Infrared Spectral Atlas of O stars with Gemini GNIRS 5.50
Execution Status complete Dates Taken:
20130630 20130816 20130903 20131030
Completion Status:
100%
GN-2013B-Q-85 Gagne CA Spectroscopic confirmation of very low-mass stars and brown dwarf candidates in nearby, young moving groups (North) GMOS 6.40
Execution Status complete Dates Taken:
20130627 20130628 20130629 20130701 20130826 20131003 20131004 20131005 20131007 20131008 20131010 20131013 20131014 20131016 20131019 20131020 20131023
Completion Status:
100%
GN-2013B-Q-86 Hebb US Mass measurements of a young eclipsing binaries in h and chi Per GNIRS 43.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-87 Howell US High-resolution Speckle Imaging of Kepler Exoplanet Host Stars - Validation of Earth-size, Habitable Zone Exoplanets Visitor 20.00
Execution Status active Dates Taken:
20130724 20130725 20130726 20130727 20130728 20130729 20130731
Completion Status:
91%
GN-2013B-Q-88 Koss UH Studying Merger Driven Growth Using Dual AGN and a Black Hole Recoil Candidate GMOS 15.00
Execution Status active Dates Taken:
20130709 20130710 20130711 20130714 20130721 20130907 20131013 20131026
Completion Status:
35%
GN-2013B-Q-89 Lange AU Bridging the gap: A pilot study for a combined GAMA - HST study of galaxy morphology at 0.1<z<1.0 GMOS 13.00
Execution Status active Dates Taken:
20131013
Completion Status:
0%
GN-2013B-Q-90 Mackey CAAUSVGSXCHKJPDSARUSDDCLUKGTUHBR Dynamics of the accreted remote globular cluster system of M31 GMOS 6.00
Execution Status active Dates Taken:
20131003 20131030 20131107 20131128 20131202
Completion Status:
94%
GN-2013B-Q-91 Marsset CA NIR spectroscopy of two ~T7-Y0 brown dwarf candidates (North) GNIRS 1.20
Execution Status active Dates Taken:
20131202
Completion Status:
0%
GN-2013B-Q-92 McDermid GS Probing for HeII emission in the diffuse ionized-gas around the center of M31 GMOS 8.00
Execution Status complete Dates Taken:
20130825 20131030 20131102 20131103 20131105 20131106 20131128
Completion Status:
100%
GN-2013B-Q-93 Melin US Characterizing the energy drivers of the upper atmosphere of Uranus GNIRS 24.00
Execution Status active Dates Taken:
20130822 20131103 20131105 20131106 20131120 20131123 20131124 20131129
Completion Status:
28%
GN-2013B-Q-94 Mendes de Oliveira BR Kinematics and stellar populations of two first-ranked fossil group galaxies GMOS 5.00
Execution Status complete Dates Taken:
20130814 20131002 20131102 20131103 20131105
Completion Status:
100%
GN-2013B-Q-95 Mould CA/US The circumstellar disks of nearby active galaxies NIFS+Altair 2.00
Execution Status active Dates Taken:
20130928 20131002 20131020
Completion Status:
100%
GN-2013B-Q-96 Pontoppidan US Using TEXES to find evidence for large scale migration of icy bodies in protoplanetary disks Texes 10.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2013B-Q-97 Sales BR Mapping the Inner Structure of OH Megamaser Merger Galaxies GMOS 3.80
Execution Status active Dates Taken:
20131030 20131106 20131128 20131202
Completion Status:
97%
GN-2013B-Q-98 Salyk US Locating the water vapor in protoplanetary disks Texes 14.00
Execution Status active Dates Taken:
20131116 20131118 20131124
Completion Status:
17%
GN-2013B-Q-99 Shih UH Massive Outflows in FR II Quasars and Radio Galaxies GMOS 20.00
Execution Status active Dates Taken:
20130810 20131010 20131013 20131015 20131023
Completion Status:
12%
GN-2013B-Q-100 Stock CA The nature of extinction in HII regions NIRI 2.70
Execution Status Dates Taken:
20131127 20131129
Completion Status:
90%
GN-2013B-Q-101 Sung US Mass Accretion Rate of Very Low Luminosity Objects NIFS 0.50
Execution Status Dates Taken:
20130928 20131002
Completion Status:
81%
GN-2013B-Q-102 van Belle US Stellar Diameters & Surface Imaging with DSSI Visitor 10.00
Execution Status active Dates Taken:
20130726 20130727 20130728 20130729 20130801
Completion Status:
54%
GN-2013B-Q-103 Villforth US Starburst Quasars: A transitional stage in the quasar lifecycle? GMOS 6.50
Execution Status Dates Taken:
20130625 20130627 20130702 20130721 20130825 20130826 20130929 20131021 20131103 20131106 20131128 20131130 20131201 20131202
Completion Status:
100%
GN-2013B-Q-104 White AU Accretion and Outflow from Young Stellar Disks NIFS+Altair 10.00
Execution Status active Dates Taken:
Completion Status:
0%

The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2013B-Q-1 Abraham US/CA/AU Red Nuggets in the Adaptive Optics Deep Field GSAOI+GeMS 42.90 [r14B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GS-2013B-Q-2 Anguita CL Unveiling the nature of lensed "normal" galaxies in the redshift desert Flamingos2 9.00
Execution Status active Dates Taken:
20131019
Completion Status:
18%
GS-2013B-Q-3 Berger US/AU Exploring the Cosmic Dawn, Galaxy Evolution, and Exotic Stellar Deaths with Rapid GRB Follow-Up Observations (South) GMOS-S 9.60
Execution Status active / RToO Dates Taken:
Completion Status:
0%
GS-2013B-Q-4 Cenko CA Probing the Central Black Holes of Distant, Quiescent Galaxies via Tidal Disruption Flares (South) GMOS-S 1.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GS-2013B-Q-5 Chapman CA Optical followup of the new Cycle1 ALMA-SPT sample of lensed submillimeter galaxies GMOS-S 20.00
Execution Status active Dates Taken:
20130811 20130901 20130911 20131006 20131011 20131013 20131103 20131104 20131202
Completion Status:
55%
GS-2013B-Q-6 Cidale AR Hot water in the disks of B[e] stars Flamingos2 2.40
Execution Status active Dates Taken:
20130919 20131014 20131015 20131031 20131121
Completion Status:
66%
GS-2013B-Q-7 Clayton CA What is the evolutionary origin of cool RCB stars ? GSAOI+GeMS 1.70 [r14B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GS-2013B-Q-8 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (South) GMOS-S 10.00
Execution Status Dates Taken:
Completion Status:
0%
GS-2013B-Q-9 Drinkwater AU The cause of high mass-to-light ratios in ultracompact dwarf galaxies GMOS-S 9.00
Execution Status active Dates Taken:
20130812 20130910 20130911 20131010 20131103 20131108
Completion Status:
40%
GS-2013B-Q-10 Dupuy US Uncovering a New Population of Brown Dwarf Binaries with GeMS Astrometry GSAOI+GeMS 5.70 [r14B]
Execution Status active / rollover Dates Taken:
20131018
Completion Status:
8%
GS-2013B-Q-11 Fraser CA Characterizing the Atmospheres of KBOs Quaoar and 2007 OR10 GMOS-S 6.00
Execution Status complete Dates Taken:
20130712 20130713 20130714 20130715 20130804 20130805 20130827 20130828
Completion Status:
100%
GS-2013B-Q-12 Gonçalves BR Chemical tagging with emission line populations in NGC 55 GMOS-S 6.00 [r14B]
Execution Status active / rollover Dates Taken:
20130831 20130902 20130903 20130912 20130919 20130930 20131002 20131004 20131013 20131104 20131106
Completion Status:
52%
GS-2013B-Q-13 Kasliwal US Rapid Spectroscopy of Elusive Transients and Young Supernovae (South) GMOS-S 3.60
Execution Status RToO Dates Taken:
20130911 20130921 20131012
Completion Status:
49%
GS-2013B-Q-14 Lacy US The highest resolution view of massive distant galaxies GSAOI+GeMS 11.70 [r14B]
Execution Status active / rollover Dates Taken:
20131018 20131019
Completion Status:
8%
GS-2013B-Q-15 Leggett US A Study of the 450K Transition from T to Y Dwarf, and of the 350K Y Dwarfs. (South) Flamingos2 / GSAOI+GeMS 25.70 [r14B]
Execution Status active / rollover Dates Taken:
20131121 20131122 20131126 20131127 20131129
Completion Status:
58%
GS-2013B-Q-16 Leggett US/GS/CL A new Y dwarf search probing the limits of WISE (South) Flamingos2 31.20 [r14B]
Execution Status active / rollover / SToO Dates Taken:
20130928 20130929 20131011 20131012 20131014 20131015 20131026 20131029 20131107 20131109
Completion Status:
45%
GS-2013B-Q-17 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (South) GMOS-S 6.50
Execution Status active / SToO Dates Taken:
20130830 20130930
Completion Status:
13%
GS-2013B-Q-18 Parker US Targeted Recovery of Candidate Kuiper Belt Objects for New Horizons Flyby (South) GMOS-S 4.00 [r14B]
Execution Status active / rollover / SToO Dates Taken:
Completion Status:
0%
GS-2013B-Q-19 Rest US Spectrophotometric Time Series of etaCarinae's Great Eruption GMOS-S 13.50 [r14B]
Execution Status active / rollover / SToO Dates Taken:
Completion Status:
0%
GS-2013B-Q-20 Ricci BR Nuclear and circumnuclear low ionization emission in massive galaxies GMOS-S 12.30 [r14B]
Execution Status active / rollover Dates Taken:
20130810 20130811 20130812 20130826 20130828 20130903 20130911 20130925 20130930 20131007 20131008 20131011 20131104
Completion Status:
96%
GS-2013B-Q-21 Rogerson CA Spectroscopy of Photometrically Varying BAL Quasars (South) GMOS-S 10.19
Execution Status active / SToO Dates Taken:
20130811 20130826 20130902 20131007 20131121 20131123 20131125 20131126 20131128 20131202
Completion Status:
85%
GS-2013B-Q-22 Saha US Establishing a Network of DA White Dwarf SED Standards GMOS-S 21.50 [r14B]
Execution Status active / rollover Dates Taken:
20131013 20131103 20131129 20131201
Completion Status:
35%
GS-2013B-Q-23 Schreiber CL Accurate orbital orbital periods and component masses of three doubled-line double white dwarfs. GMOS-S 16.70
Execution Status active Dates Taken:
20130810 20130811 20130910 20130911 20131103 20131104 20131105 20131106 20131121 20131122 20131123 20131124 20131127 20131130 20131201 20131202
Completion Status:
58%
GS-2013B-Q-24 Sesto AR Dating the most intense star formation events in the past of NGC 1316 GMOS-S 9.70
Execution Status active Dates Taken:
20130831 20130902 20130908 20130910 20130920 20130923 20131127 20131129 20131130 20131202
Completion Status:
56%
GS-2013B-Q-25 Stubbs US Spectroscopy of Galaxies in Massive Clusters: Galaxy Properties and Dynamical Cluster Mass Calibration GMOS-S 32.00
Execution Status active Dates Taken:
20130826 20130829 20131004 20131006 20131127 20131128 20131129 20131130 20131201 20131202
Completion Status:
9%
GS-2013B-Q-26 Tinney US/AU MCAO Astrometry of WISE Y dwarfs GSAOI+GeMS 13.50 [r14B]
Execution Status active / rollover Dates Taken:
Completion Status:
0%
GS-2013B-Q-27 Torres-Flores CL Metallicty gradients and star formation in interacting galaxies GMOS-S 6.60
Execution Status active Dates Taken:
20130713 20130806 20130831 20130924 20130930 20131003 20131004 20131006 20131127
Completion Status:
96%
GS-2013B-Q-28 Treu US Spectroscopic study of the environment of time-delay lenses for accurate cosmology GMOS-S 8.80 [r14B]
Execution Status active / rollover Dates Taken:
20130806 20131108 20131109 20131120 20131122 20131123 20131126
Completion Status:
37%
GS-2013B-Q-29 Trujillo GS Distant Solar System Objects GMOS-S 3.50
Execution Status active / SToO Dates Taken:
20131128
Completion Status:
20%
GS Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2013B-Q-30 Ammons US/CA A Test of GEMS Astrometric Precision for Exoplanet Detection and Mass Measurement GSAOI+GeMS 3.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-31 Angeloni CL Unveiling the giant jet of Sanduleak's star in the NIR with GSAOI GSAOI+GeMS 9.00
Execution Status active Dates Taken:
20131018 20131020
Completion Status:
27%
GS-2013B-Q-32 Artigau CA Identifying Planetary-Mass Companions to Nearby Young Stars GMOS-S 17.40
Execution Status active Dates Taken:
20130810 20130811 20130827 20130829 20130908 20130910 20130911 20130930 20131006 20131007 20131010 20131013 20131014 20131103 20131122 20131201
Completion Status:
61%
GS-2013B-Q-33 B. Menezes BR AGN and nuclear cluster properties in Sc galaxies: a mini-survey GMOS-S 3.90
Execution Status active Dates Taken:
20130829 20131007 20131010
Completion Status:
67%
GS-2013B-Q-34 Balogh CA Star formation and AGN activity in the central galaxies of Xray groups at z=1 Flamingos2 4.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-35 Bannister AU Ruling out a Galactic progenitor for dispersed radio bursts GMOS-S 3.50
Execution Status complete Dates Taken:
20130804 20130805
Completion Status:
100%
GS-2013B-Q-36 Blum US The Double Cluster R136/R141-142 in 30 Doradus: A Definitve Study of the Low Mass Stellar Component GSAOI+GeMS 3.90
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-37 Caso AR The globular cluster system of the massive elliptical galaxy NGC 6876 GMOS-S 4.60
Execution Status complete Dates Taken:
20130829 20130908 20131104 20131105
Completion Status:
100%
GS-2013B-Q-38 Chornock US/GS Unveiling the Explosion Physics of Nature's Most Luminous Supernovae (South) GMOS-S 10.00
Execution Status active / SToO Dates Taken:
20131008 20131109
Completion Status:
14%
GS-2013B-Q-39 Clayton US Using 16O/18O to Determine the Evolutionary History of the R Coronae Borealis Stars Flamingos2 14.30
Execution Status active Dates Taken:
20130930
Completion Status:
19%
GS-2013B-Q-40 Cote CA Measuring Mass-to-Light in Nearby Dwarf Spheroidal Galaxies GMOS-S 13.30
Execution Status active Dates Taken:
20130911 20130919 20131028 20131104
Completion Status:
10%
GS-2013B-Q-41 de S. Angelo BR Spectroscopy of the dissolving star cluster candidates NGC7193 and NGC7772 GMOS-S 5.20
Execution Status complete Dates Taken:
20130728 20130802 20130805 20130906 20130908 20130910 20130911 20130912 20131026 20131027 20131103 20131104 20131106 20131107
Completion Status:
100%
GS-2013B-Q-42 Demarco CL Size evolution of early-type galaxies in the strongest z>1.5 overdensity in COSMOS GSAOI+GeMS 12.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-43 Denney US Reverberation Mapping of a Gravitationally-lensed Quasar (South) GMOS-S 24.10
Execution Status active / SToO Dates Taken:
20130810 20130827 20130829 20130923 20131009 20131105 20131119
Completion Status:
51%
GS-2013B-Q-44 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (South) GMOS-S 10.00
Execution Status active Dates Taken:
20131010 20131011
Completion Status:
55%
GS-2013B-Q-45 Foley US RAISIN: Tracers of Cosmic Expansion with SN Ia in the IR (South) GMOS-S 9.00
Execution Status active / SToO Dates Taken:
20130806 20131009
Completion Status:
29%
GS-2013B-Q-46 Fox US/AU Exploring Exotic Stellar Deaths with Standard TOO GRB Follow-Up Observations (South) GMOS-S 4.00
Execution Status active / SToO Dates Taken:
20130831 20130901 20130920 20130921
Completion Status:
0%
GS-2013B-Q-47 Gamen AR Galactic O-Star Spectroscopic Survey: Disentangling the spectra of close companions. GMOS-S 1.80
Execution Status active Dates Taken:
20130719 20130911
Completion Status:
78%
GS-2013B-Q-48 Graham US Understanding the Power Source in Type Ia Supernovae with Nebular Phase Spectroscopy (South) GMOS-S 11.00
Execution Status Dates Taken:
20130829 20130922 20131002 20131006
Completion Status:
34%
GS-2013B-Q-49 Hagele AR The CNSF rings of Seyfert galaxies and their connection with the active nuclei: abundances and kinematics GMOS-S 3.60
Execution Status active Dates Taken:
20130912 20130920 20130925 20131009
Completion Status:
0%
GS-2013B-Q-50 Hall US/CA Monitoring Emergent Absorption Troughs in Quasars (South) GMOS-S 4.47
Execution Status active / SToO Dates Taken:
20130810 20130903 20130913 20131108 20131109 20131127 20131128
Completion Status:
77%
GS-2013B-Q-51 Kannappan US REsolved Spectroscopy Of a Local VolumE: The RESOLVE Survey in Stripe 82 GMOS-S 10.00
Execution Status active Dates Taken:
20130806 20130908 20130911 20130912 20131010 20131012 20131013 20131106 20131107 20131108 20131129 20131130
Completion Status:
93%
GS-2013B-Q-52 Kepler AR/GS/BR Extremely Low Mass White Dwarf Pulsators GMOS-S 5.00
Execution Status active Dates Taken:
20130903 20131007 20131103
Completion Status:
59%
GS-2013B-Q-53 Kilic US A Search for Pulsating White Dwarf Companions to Millisecond Pulsars (South) GMOS-S 4.00
Execution Status complete Dates Taken:
20130929
Completion Status:
100%
GS-2013B-Q-54 Marsset CA NIR spectroscopy of two ~T7-Y0 brown dwarf candidates (South) Flamingos2 2.40
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-55 McConnachie CA The space motion and stellar content of Galactic satellites seen with GeMS/GSAOI: Part II GSAOI+GeMS 11.60
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-56 Metchev US Weather on Other Worlds: Magnetic Fields or Clouds? (South) GMOS-S 10.30
Execution Status active Dates Taken:
20130803 20130830 20130831 20130901 20130912 20130920 20131010
Completion Status:
55%
GS-2013B-Q-57 Moskovitz US Mission Accessible Near-Earth Objects Survey (MANOS) (South) GMOS-S 6.50
Execution Status active / SToO Dates Taken:
20130810 20130828 20131006 20131124
Completion Status:
13%
GS-2013B-Q-58 Neichel GS Dissecting a galaxy group at z ~ 0.7 GSAOI+GeMS 2.30
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-59 Oesch US Emission Line Strengths and Gas-Phase Metallicities for the Massive Galaxy Population at z~3-4 Flamingos2 6.50
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-60 Piatti AR Catching a hidden old SMC star cluster GMOS-S 1.00
Execution Status active Dates Taken:
20131201
Completion Status:
12%
GS-2013B-Q-61 Puzia US/GS The GeMS/GSAOI Galactic Globular Cluster Survey (G4CS) GSAOI+GeMS 13.50
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-62 Repetto BR 2D kinematic study of the nuclear component of NGC 1808 and the induced inflow. GMOS-S 3.00
Execution Status active Dates Taken:
20131012 20131013 20131130
Completion Status:
58%
GS-2013B-Q-63 Richtler CL Isolated ellipticals - key objects for the dark matter problem? GMOS-S 10.00
Execution Status active Dates Taken:
20130812 20130902 20130903
Completion Status:
9%
GS-2013B-Q-64 Romita US Revealing the Properties of Embedded Clusters Beyond the Milky Way GSAOI+GeMS 10.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-65 Ryder CL GeMS Study of Supernovae in Luminous Infrared Galaxies GSAOI+GeMS 5.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GS-2013B-Q-66 Sand US Constraining Type Ia Supernova Physics with Near-Infrared Spectroscopy (South) Flamingos2 12.70
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GS-2013B-Q-67 Scarano Jr BR Interactions vs. Spiral Arms Effects in the Oxygen Abundances of ESO194-G013 Galaxy GMOS-S 2.90
Execution Status active Dates Taken:
20130921
Completion Status:
0%
GS-2013B-Q-68 Schirmer GS Green beans, quasar ionization echoes, and the evolution of AGN (South) GMOS-S 12.00
Execution Status active Dates Taken:
20130729 20130904 20131012 20131013 20131014 20131022 20131129 20131130
Completion Status:
37%
GS-2013B-Q-69 Schulze CL A systematic search of supernova components in gamma-ray bursts GMOS-S 8.00
Execution Status active / SToO Dates Taken:
20131007 20131107 20131108
Completion Status:
29%
GS-2013B-Q-70 Sharp CA/AU Resolving cluster evolution GMOS-S 11.45
Execution Status active Dates Taken:
20130911 20131013 20131128
Completion Status:
4%
GS-2013B-Q-71 Stevenson US Validation of FLAMINGOS-2 for Exoplanet Research: The WASP-18b Case Study Flamingos2 10.00
Execution Status active Dates Taken:
20131005 20131012 20131025 20131026 20131126 20131127
Completion Status:
100%
GS-2013B-Q-72 Stubbs US Spectroscopy of Galaxies in Massive Clusters: Galaxy Properties and Dynamical Cluster Mass Calibration GMOS-S 20.00
Execution Status active Dates Taken:
20130924 20131002 20131003 20131004 20131007 20131011 20131106 20131108 20131121 20131122 20131127 20131128 20131129 20131202
Completion Status:
68%
GS-2013B-Q-73 Webster AU Understanding the Physics of the Broad Line Region Flamingos2 13.40
Execution Status active Dates Taken:
20130719 20131002 20131015 20131018 20131019 20131026 20131027 20131028 20131029 20131101 20131119
Completion Status:
40%
GS Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2013B-Q-74 B. Menezes BR AGN and nuclear cluster properties in Sc galaxies: a mini-survey GMOS-S 11.00
Execution Status active Dates Taken:
20130829 20130923
Completion Status:
1%
GS-2013B-Q-75 Beers US Missing metal-poor stars from the HK and Hamburg/ESO Surveys (South) GMOS-S 50.00
Execution Status complete Dates Taken:
20130724 20130727 20130728 20130803 20130804 20130805 20130807 20130809 20130812 20130826 20130902 20130903 20130908 20130910 20130912 20130919 20130920 20130921 20130922
Completion Status:
100%
GS-2013B-Q-76 Bizyaev US NEW DWARF GALAXIES IN THE LOCAL VOLUME/LOCAL GROUP GMOS-S 5.00
Execution Status active Dates Taken:
20130802 20130830 20130901 20131006 20131008 20131011 20131109 20131129 20131130 20131201 20131202
Completion Status:
100%
GS-2013B-Q-77 Bussmann US Gemini-South Imaging and Spectroscopy of ALMA Lensed SMGs Discovered by Herschel GMOS-S 25.80
Execution Status active Dates Taken:
20130903 20130922 20131002 20131107 20131123 20131201 20131202
Completion Status:
24%
GS-2013B-Q-78 Cales CL High z Quasars Flamingos2 6.30
Execution Status active Dates Taken:
20131029
Completion Status:
5%
GS-2013B-Q-79 Gagne CA Spectroscopic confirmation of very low-mass stars, brown dwarfs and planemo candidates in nearby, young moving groups Flamingos2 / GMOS-S 54.30
Execution Status active Dates Taken:
20130927 20130928 20131002 20131003 20131008 20131009 20131015 20131018 20131019 20131020 20131021 20131023 20131024 20131025 20131027 20131028 20131029 20131030 20131031 20131102 20131105 20131106 20131110 20131120 20131124 20131125 20131126 20131127 20131202
Completion Status:
94%
GS-2013B-Q-80 Kedziora-Chudczer AU Eclipse spectra of 'hot' Jupiters with inflated atmospheres. Flamingos2 8.10
Execution Status active Dates Taken:
Completion Status:
0%
GS-2013B-Q-81 Leggett GS A Study of the 450K Transition from T to Y Dwarf, and of the 350K Y Dwarfs. (South) Flamingos2 5.20
Execution Status Dates Taken:
Completion Status:
0%
GS-2013B-Q-82 Minniti CL Peering at the high-redshift nature of 10 unidentified hard X-ray sources GMOS-S 10.00
Execution Status active Dates Taken:
20130726 20130801 20131011
Completion Status:
13%
GS-2013B-Q-83 Rodriguez CL Characterizing Young, Low-Mass Stars Near Earth GMOS-S 15.00
Execution Status active Dates Taken:
20130712 20130719 20130724 20130725 20130726 20130727 20130801 20130923 20131119
Completion Status:
68%
GS-2013B-Q-84 Rupke US Verifying the Spatial Extent of QSO Outflows Discovered in Absorption GMOS-S 9.50
Execution Status active Dates Taken:
20130724 20130827 20130828 20130829 20130830 20130920 20131120 20131124 20131125
Completion Status:
71%
GS-2013B-Q-85 Ryder AU The Type IIn Supernova 1978K Revisited GMOS-S 2.90
Execution Status active Dates Taken:
20130805 20130911 20131123
Completion Status:
62%
GS-2013B-Q-86 Sales US Mapping the Inner Structure of OH Megamaser Merger Galaxies GMOS-S 4.70
Execution Status active Dates Taken:
20130829 20130830 20131009 20131120
Completion Status:
38%
GS-2013B-Q-87 Sharp US Resolving cluster evolution GMOS-S 4.80
Execution Status active Dates Taken:
20130801
Completion Status:
0%

 

[Science Operations home] [schedules home]


Last updated on: 2 Dec 2013 18:19:32 GMT