The semester calendar shows multi-instrument queue nights, scheduled classical runs and engineering or commissioning blocks. Instruments potentially usable on queue nights are
indicated by the colored-horizontal bands (see color key below). Note: Rapid ToO PIs should always check the "what's available now" pages that are linked from the contents list for
the most up-to-date information. Scheduled classical runs are indicated in the instrument's row by the last characters of the GN-2009B-É program ID number.
Engineering or commissioning that involves one or more instruments is shown in the relevant instrument row(s). Of the order of 3 engineering nights will be scheduled in queue.
New and full moon dates are shown.
Key: GMOS   NIRI     Michelle   Altair  
NIFS   GNIRS   eng./commis.  
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August GMOS queue August
  NIRI queue NIRI warm for trouble shooting  
4 full NIFS queue C-6 queue  
19 new Altair/other queue C-6 LGS in queue queue LGS in queue  
September GMOS queue September
  NIRI NIRI warm for trouble shooting queue  
3 full NIFS queue eng queue  
17 new Altair/other LGS in queue queue  
October GMOS queue C-5 queue October
  NIRI queue  
3 full NIFS/Michelle queue C-10 queue eng queue  
17 new Altair/other queue LGS in queue queue LGS in queue  
November GMOS queue November
  NIRI queue NIRI warm - coldhead replacement queue C-7 C-2 C-8 queue  
1 full NIFS queue  
15 new Altair/other LGS in queue queue  
December GMOS queue December
  NIRI queue  
1 full NIFS/GNIRS queue  
15 new Altair/other LGS in queue queue LGS in queue queue  
January GMOS queue eng queue C-9 C-3 queue C-4 backup January
  NIRI queue warm warm eng queue C-4 LGS  
1 full NIFS/Michelle queue eng queue C-1  
15 new Altair/other queue A&G, CRCS Maint eng eng queue LGS in Q C-4 LGS  