Gemini South Semester 2009A

PDF Version

The semester calendar shows multi-instrument queue nights, scheduled classical runs and engineering or commissioning blocks. Instruments potentially usable on queue nights are
indicated by the colored-horizontal bands (see color key below). Note: ToO PIs should always check the "what's available now" pages that are linked from the contents list for
the most up-to-date information. Scheduled classical runs are indicated by the last characters of the GS-2008B-É program ID number.
Engineering or commissioning that involves one or more instruments is shown in the relevant instrument row(s). New and full moon dates are shown on the left.
Key: GMOS   T-ReCS   engineering  
Phoenix   NICI     F-2    
v1.4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
February GMOS                               C-3                 C-2         February
9 full T-ReCS T-ReCS unavailable due to elevated temperature - awaiting coldhead replacement*  
25 new Phoenix                                                          
  NICI         Campaign Block in queue                                    
  Flamingos-2/other                                                                
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
March GMOS                                                               March
11 full T-ReCS Scheduled coldhead repair                    
26 new Phoenix                                                                
  NICI           Campaign Block in queue                                        
  Flamingos-2/other                                                              
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
April GMOS                                             C-7               April
9 full T-ReCS                                                       Engineering  
25 new Phoenix           C-4                                           Shutdown  
  NICI             Campaign Block in queue                                      
*IYA Webcast Flamingos-2/other     *                                                          
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
May GMOS                                       Q-36                     May
9 full T-ReCS             Engineering shutdown                                            
24 new Phoenix       (extended for major M2 maintenance/repair)                                          
  NICI                                                                
*Kyoto Mtg Flamingos-2/other                             eng contingency * * * * *                    
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
June GMOS                                                               June
7 full T-ReCS     C-8   C-1 C-5                                                
22 new Phoenix                   C-9                                          
  NICI
  Flamingos-2/other                                                              
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
July GMOS                                                               July
7 full T-ReCS                                                                
22 new Phoenix     C-6       C-10                                                
  NICI  
  Flamingos-2/other                                                                
Notes: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Flamingos-2 on-sky schedule is contingent on instrument delivery and lab check-out.
All classical nights have queue backup.
*Seasonal high water vapor on Cerro Pachon nominally prevents use of T-ReCS in Feb-Mar
updated 1 Jun 2009, B. Rodgers
updated 17 Apr 2009, C. Chirino
updated 3 Mar 2009, B. Rodgers
updated 20 Jan 2009, B. Rodgers
1st draft 10 Dec 2008, B. Rodgers