You are here

2021A GS Poor Weather Programs

Content owned by bmiller

The table below summarizes the Gemini North queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [21B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2021A-Q-400 Garcia AR Spectroscopic variability of bursting T Tauri stars GMOS-S 31.45
Execution Status: Dates Taken:
20210322 20210504 20210613 20210614 20210616 20210617 20210621 20210625 20210704 20210711 20210713 20210718
Completion Status:
44%
GS-2021A-Q-401 Arias AR Inhomogeneities in the CO emitting region of HD327083 Visitor 3.90
Execution Status: complete Dates Taken:
20210817 20210818
Completion Status:
100%
GS-2021A-Q-402 Arias AR Studying the kinematics of disks around massive stars in transition phases by modeling CO emission Visitor 2.00
Execution Status: complete Dates Taken:
20210501 20210513 20210519 20211004
Completion Status:
100%
GS-2021A-Q-403 Woods CA Locating the Reverse Shocked Ejecta in Kepler's Supernova Remnant GMOS-S 10.30
Execution Status: complete Dates Taken:
20210606 20210607 20210609 20210712 20210713
Completion Status:
100%
GS-2021A-Q-404 Hillwig US A search for close binary double degenerate central stars of planetary nebulae at Gemini South GMOS-S 18.40
Execution Status: complete Dates Taken:
20210129 20210130 20210306 20210315 20210318 20210319 20210322 20210406 20210407 20210408 20210410 20210417 20210509 20210512 20210613
Completion Status:
100%
GS-2021A-Q-405 Seccull US A Search for Faint Solar Calibrators GMOS-S 25.60
Execution Status: Dates Taken:
20210224 20210318 20210319 20210322 20210402 20210408 20210417 20210501 20210502 20210504 20210518 20210529 20210606 20210607 20210608 20210622 20210623 20210625 20210627 20210630 20210712 20210713
Completion Status:
90%
GS-2021A-Q-406 Maille US Spectroscopy of High Redshift Blazar Candidates GMOS-S 2.00
Execution Status: complete Dates Taken:
20210407 20210411 20210611
Completion Status:
100%
GS-2021A-Q-407 Weidmann AR Central Stars of Planetary Nebulae: Survey for Spectral Classification GMOS-S 11.10
Execution Status: complete Dates Taken:
20210228 20210320 20210403 20210404 20210408 20210409 20210411 20210419 20210501 20210502 20210512 20210613
Completion Status:
100%
GS-2021A-Q-408 Pignata AR GMOS observations of planetary nebulae GMOS-S 16.50
Execution Status: complete Dates Taken:
20210319 20210321 20210322 20210404 20210405 20210407 20210409 20210422 20210507
Completion Status:
100%
GS-2021A-Q-409 Sneden US High Resolution Infrared Spectroscopy of Barium and S Stars Visitor 12.10
Execution Status: Dates Taken:
20210417 20210501 20210502 20210503 20210507 20210508 20210515 20210530 20210705 20210713 20210817
Completion Status:
66%
GS-2021A-Q-410 Jeram US Searching for Bright, High-z QSOs with GMOS GMOS-S 13.70
Execution Status: complete Dates Taken:
20210502 20210504 20210509 20210513 20210518 20210519 20210610 20210613 20210614 20210615 20210618 20210620 20210622 20210704 20210705 20210713 20210714 20210715
Completion Status:
100%
GS-2021A-Q-411 Marsango US Profile Double-Peaked Galaxy Pictor A GMOS-S 4.40
Execution Status: Dates Taken:
20210319 20210321 20210405 20210406 20210407 20210411 20210506
Completion Status:
88%
GS-2021A-Q-412 Gomez US Spectroscopic Followup for an Ultra-Massive Galaxy at z > 2.6 Flamingos2 8.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2021A-Q-413 Tappert CL Recovering Nova Boo 1877 GMOS-S 1.40
Execution Status: Dates Taken:
20210607 20210611
Completion Status:
87%
GS-2021A-Q-414 Madrid US Poor Weather spectra of CD-45 11034 GMOS-S 2.20
Execution Status: Dates Taken:
20210618 20210713 20210827 20210830
Completion Status:
33%
GS-2021A-Q-415 Mora CL Component Masses of Single-line Spectroscopic Binaries Resolved by SOAR GMOS-S 22.10
Execution Status: Dates Taken:
20210508 20210509 20210510 20210513 20210516 20210518 20210519 20210529 20210530 20210601 20210615 20210617 20210618 20210625 20210629 20210704 20210705 20210709 20210711 20210712 20210713 20210725 20210801
Completion Status:
80%
GS-2021A-Q-416 Shaw US Deriving the nature of INTEGRAL-discovered hard X-ray sources: IGR J17040-4305 Flamingos2 1.45
Execution Status: complete Dates Taken:
20210530
Completion Status:
100%
GS-2021A-Q-417 Chun KR IGRINS observation of red supergiants in young massive clusters RSGC1 and RSGC4 in the Scutum-Crux arm Visitor 7.30
Execution Status: Dates Taken:
20210530 20210705 20210711 20210713 20210817 20210818 20210822 20210823
Completion Status:
100%
GS-2021A-Q-418 Woo KR Reveberation mapping of uniquely selected high-luminosity QSOs GMOS / GMOS-S 5.70
Execution Status: Dates Taken:
20210714 20210715 20210717 20210719 20210721 20210724 20210725 20210727 20210818
Completion Status:
61%
GS-2021A-Q-419 Placco US Identification of Low-Metallicity Stars from Narrow-Band Photometry GMOS-S 40.00
Execution Status: complete Dates Taken:
20210601 20210604 20210605 20210608 20210609 20210610 20210613 20210614 20210615 20210617 20210618 20210620 20210621 20210622 20210623 20210625 20210627 20210628 20210629 20210630 20210704 20210705 20210711 20210712 20210713 20210714 20210716
Completion Status:
100%
GS-2021A-Q-420 Wang US spectroscopic classification and follow-up on SN 2021ltk in TESS field-of-view GMOS-S 1.00
Execution Status: Dates Taken:
20210618 20210629 20210701 20210712
Completion Status:
79%
GS-2021A-Q-421 Kim KR Spectroscopic identification of variable objects from KMTNet TMT GMOS-S 16.50
Execution Status: complete Dates Taken:
20210606 20210607 20210609 20210610 20210615 20210619 20210622 20210623 20210714
Completion Status:
100%
GS-2021A-Q-422 Salinas US GLIMPSE-C01: disk or halo cluster? Flamingos2 1.50
Execution Status: complete Dates Taken:
20210710 20210711
Completion Status:
100%
GS-2021A-Q-501 Diaz F2 MOS mask submission tests Flamingos2 0.00
Execution Status: Dates Taken:
Completion Status:
NaN%
GS-2021A-Q-777 Rantakyro Hidden headers test GMOS-S 0.00
Execution Status: Dates Taken:
20210518 20210519
Completion Status:
NaN%