You are here

2021B GN Poor Weather Programs

Content owned by bcooper

The table below summarizes the Gemini North queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [21B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2021B-Q-401 Chies Santos AR/BR Towards the largest compilation of GC candidates in the vicinity of the M81/M82/NGC3077 triplet GMOS 54.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2021B-Q-402 Weidmann GS Central Stars of Planetary Nebulae: Survey for Spectral Classification GMOS 18.00
Execution Status: Dates Taken:
20211008 20211009 20211010 20211015 20211122
Completion Status:
29%
GN-2021B-Q-403 Seccull GS A Search for Fainter Solar Calibrators - GN GMOS 149.00
Execution Status: Dates Taken:
20210822 20211009 20211010 20211125 20211127 20211128 20211129
Completion Status:
5%
GN-2021B-Q-404 Bean GS The MAROON-X poor weather opportunity Visitor 58.00
Execution Status: Dates Taken:
20210820 20210822 20210823 20211027 20211029 20211103 20211105 20211110 20211112 20211121 20211122
Completion Status:
21%
GN-2021B-Q-405 Pignata GS GMOS observations of planetary nebulae GMOS 16.50
Execution Status: Dates Taken:
Completion Status:
0%