Gemini Adaptive Optics Documentation
Please see the Gemini
Documentation Page for general information about Gemini documents and
their availability.
Below is a partial list of Interface Control Documents
relevant to GAOS. The complete ICD archive containing information about
these ICDs and others can be reached at the
ICD Web database page.
General ICDs
AO ICDs
-
1.5.3/1.8 Instrument Support Structure to Adaptive Optics
ICD
-
1.6/1.8 A&G System to Adaptive Optics ICD
-
1.8 Adaptive Optics ICD
OIWFS ICDs
-
1.1.11/1.10 Telescope Control to On Instrument WFS ICD
-
1.6/1.10 A&G System to On Instrument WFS ICD
-
1.9/1.10 Science Instruments to On Instrument WFS ICD
-
1.10 On-Instrument WFS ICD
Cass. Rotator and Instrument Support Structure
-
1.5 CR/ISS ICD
-
1.5.1/1.5.3 Cass Rotator to Instrument Support Structure
ICD
-
1.5.3 Instrument Support Structure ICD
-
1.5.3/1.6 Instrument Support Structure to A&G System
ICD
-
1.5.3/1.8 Instrument Support Structure to Adaptive Optics
ICD
-
1.5.3/1.9 Instrument Support Structure to Science Instruments
ICD
Secondary Tip/Tilt System
-
1.4.2 Tip/Tilt System ICD
-
1.4.2/1.4.3 Tip/Tilt System to M2 Mirror ICD
-
1.4.2/1.4.4 Tip/Tilt System to M2 Control System ICD
Below is a partial list of documents pertaining to adaptive
optics within the Gemini documentation archive. A more complete index can
be found in the documentation
index. Inquiries for copies or information can be emailed to Ruth Kneale
at the address given below.
Science Drivers
-
SPE-PS-G0001. Gemini Science Requirements Document, 1-Nov-96
-
RPT-PS-G0069. Science Drivers for Adaptive Optics on Gemini-North,
4-Jan-96
AOS Comparison Study
-
RPT-I-G0056. Adaptive Optics for the Gemini Telescopes: A
Recommendation, 16-Nov-94
-
RPT-I-G0059. Comparison of AO Technologies on Gemini, 4-Nov-94
-
RPT-PS-G0066. AO Performance Analysis for Gemini, 26-Apr-94
-
RPT-I-G0051. AO Calculations for Gemini, 18-Nov-93
Gemini Instrumentation Program
-
RPT-PS-G0075. Future Gemini Instrumentation, 11-Feb-97
-
RPT-I-G0058. Gemini Telescopes' Instrumentation, 1-Apr-95
-
RPT-I-G0057. Principles Behind the Gemini Instrumentation
Program
-
SPE-PS-G0050. Instrumentation Program Plan, 23-May-94
Site Characterization
-
TN-PS-G0025. Comparison of CFHT/CfA Seeing Measurements,
1-Aug-94
-
TN-PS-G0050. Site Monitoring of the Gemini Telescopes, 1-May-97
-
RPT-TE-G0039. Seeing Control Strategy for the 8m Enclosure,
12-Nov-93
Wavefront Sensing
-
TN-PS-G0031. Near-IR Wavefront Sensing, 1-Aug-95
-
RPT-I-G0072. WFS CCD Controller Report, 13-Apr-96
-
REV-I-G0072. WFS System Review Materials, 13-Apr-96
-
REV-I-G0084. WFS CDR Documentation, 19-Sep-96
Ruth A. Kneale / web@gemini.edu
/ January 12, 1998