Gemini North Semester 2024A -- Dates are local HST 
The semester calendar shows multi-instrument queue nights, engineering or commissioning. Dates are local HST, dates in red are weekends and holidays.  
Instruments potentially usable are indicated by the colored-horizontal bands (see color key below). 
IRDC= IR detector controller project. VIb = Vibration project, comm = commissioning, SV = Systems Verification
Vibration work (work to investigate and chracteorize the vibration in the telescope systems) is scheduled to start May01.  
The equipment will be using the bottom port, i.e. no science instrumenton the bottom port. MrnX will be installed on May06 if all work concludes as scheduled.  (Cont=Contingency for the vibration work. )
Key: GMOS     GNIRS     NIFS     Altair     IGRINS2   Visiting   Engineering  
                 
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Feb GMOS                                                               Feb
  GNIRS                                                                
24 full NIFS/IG2                                                                
9 new Altair                                                                
  Visiting                                           MAROON-X    
                                                             
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Mar GMOS                                                               Mar                
  GNIRS                                                                                
24 full NIFS/IG2                                                                                
10 new Altair                                                                                
  Visiting MAROON-X ALOPEKE MAROON-X            
                                                             
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30  
Apr GMOS                                                               Apr
  GNIRS                               IRDC IRDC IRDC                            
8 full NIFS/IG2                                             comm comm comm comm comm comm comm      
23 new Altair                                                                
  Visiting MAROON-X                    
                                                             
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
May GMOS                                                               May
  GNIRS coldhead replacement work(might move by couple days)                                  
8 full NIFS/IG2                                                                
23 new Altair                                                                
  Visiting VIB VIB VIB VIB VIB Cont. Conting                           ALOPEKE MAROON-X  
                                                             
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30  
June GMOS                                                               June
  GNIRS                                                                
7 full NIFS/IGRINS2NIFS/IG2                                                                
21 new Altair                                                                
  Visiting MAROON-X    
                                                             
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
July GMOS                                                               July
  GNIRS                                                                
6 full NIFS/IG2                                 SV SV SV SV SV SV SV                  
21 new Altair                                                                
  Visiting MAROON-X               MAROON-X