[Mayan calendar]

Director's Discretionary Time Summary : Semester 2020A GN

The data shown in the tables below summarise the programs that constitute the "Director's Discretionary Time" (DDT) on GN. DDT proposals are typically for time-critical observations which cannot wait for the normal proposal cycle (e.g. unexpected astronomical events) or for testing the feasibility of a technique or of a program. See the DDT web page for more information. DDT proposals may be submitted at any time by any astronomer world-wide.

In other respects - contact scientist support, Phase II definitions, Gemini Science Archive data distribution - DDT programs are similar to other Gemini queue programs.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Execution Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Director's Discretionary Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2020A-DD-101 Suyu Strongly lensed supernovae as a unique probe of stellar physics and cosmology GMOS 20.80 [r21A]
Execution Status: rollover / RToO Dates Taken:
Completion Status:
0%
GN-2020A-DD-103 Fraser Follow-up of New Horizons Extended Mission Targets GMOS 2.50 [r21A]
Execution Status: rollover / SToO Dates Taken:
Completion Status:
0%
GN-2020A-DD-104 Hundertmark Probing the population of black holes and planets in the Milky Way with microlensing GMOS 5.50 [r21A]
Execution Status: rollover / SToO Dates Taken:
Completion Status:
0%
GN-2020A-DD-105 Howell Probing supernova progenitors with rapid TOM-enabled observations GMOS 8.00 [r21A]
Execution Status: rollover / RToO Dates Taken:
20200613 20200715
Completion Status:
53%
GN-2020A-DD-106 Liu Discovery of Close Dual Binary/Lensed Quasars from Gaia Astrometry and HST Imaging GMOS / GMOS-S 1.60
Execution Status: complete Dates Taken:
20200520 20200521
Completion Status:
100%
GN-2020A-DD-107 Fedorets Colour of C26FED2, Earth's possible second transient moon GMOS 2.00
Execution Status: complete Dates Taken:
20200224
Completion Status:
100%
GN-2020A-DD-108 Xu Transmission Spectroscopy to Confirm the First White Dwarf Planet GMOS 1.90
Execution Status: complete Dates Taken:
20200610 20200613 20200615 20200623 20200702
Completion Status:
100%
GN-2020A-DD-110 Gladders The OII Doublet in the Brightest Galaxy Known at z>5 GNIRS 0.90
Execution Status: complete Dates Taken:
20200704
Completion Status:
100%
GN-2020A-DD-111 Angus The unusual nuclear transient AT2020neh GMOS 4.20
Execution Status: Dates Taken:
20200710 20200711 20200712 20200717 20200724
Completion Status:
87%
GN-2020A-DD-112 Hajdu Old and dusty: an RR Lyrae variable with possible circumstellar debris GMOS 0.70
Execution Status: complete Dates Taken:
20200720
Completion Status:
100%
GN-2020A-DD-113 Kilic The Most Massive White Dwarf GMOS 1.10
Execution Status: Dates Taken:
Completion Status:
0%
GN-2020A-DD-114 Kaiser Exo-Planetesimal Lithium Pollution of a White Dwarf GMOS 2.40
Execution Status: Dates Taken:
Completion Status:
0%
GN Director's Discretionary Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2020A-DD-201 Rector Gemini Legacy Imaging Program GMOS / GMOS-S 1.10
Execution Status: complete Dates Taken:
20200610
Completion Status:
100%
GN-2020A-DD-202 Schambeau Coordinated Multi-Wavelength Characterization of the Recently Activated Centaur P/2019 LD2’s Coma GMOS 0.60
Execution Status: complete Dates Taken:
20200703
Completion Status:
100%
GN-2020A-DD-203 Carrasco Characterization of the most massive cluster in the miniJPAS (AEGIS) field with Gemini North/GMOS GMOS 2.70
Execution Status: Dates Taken:
Completion Status:
0%

 

[Science Operations home] [schedules home]


Last updated on: 24 Jul 2020 17:29:28 GMT