[Mayan calendar]

Queue Summary : Semester 2011B Gemini North and Gemini South

The queues shown in the tables below summarise the programs that have been awarded time on Gemini North and Gemini South. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.

There is an NGO support staff queue schedule for Gemini North and South


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2011B-Q-1 Bailey AU The D:H Ratio of Jupiter, Uranus and Neptune GNIRS 9.60
Execution Status complete Dates Taken:
20110818 20110819 20110822 20110823 20110824 20110827
Completion Status:
100%
GN-2011B-Q-2 Barmby CA The M31 abundance gradient GMOS 16.00
Execution Status complete Dates Taken:
20110730 20110731 20110802 20110804 20110805 20110807 20110808 20110809 20110825 20110826 20110827 20110828 20110829
Completion Status:
100%
GN-2011B-Q-3 Berger GS/US Exotic Explosions and Eruptions: Exploring a New Transient Phase-Space with Pan-STARRS GMOS 12.00
Execution Status complete / SToO Dates Taken:
20110720 20110802 20110804 20110810 20110811 20110812 20110814 20110916 20110922 20110923 20110928 20111005 20111204 20111205 20111206 20111207 20111208 20111218 20120101
Completion Status:
100%
GN-2011B-Q-4 Breton CA Measuring the Masses of Pulsars with Irradiated Companions (North) GMOS 10.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110802 20110803 20110808 20110809 20110812 20110823 20110824
Completion Status:
100%
GN-2011B-Q-5 Burningham UK/GS Solving the late-T dwarf luminosity function discrepancy GNIRS 11.80
Execution Status complete / SToO Dates Taken:
20110806 20110808 20110812 20110813 20110814 20110818 20110819 20110820 20111015 20111017 20111114 20111124 20111125
Completion Status:
100%
GN-2011B-Q-6 Collins UK Measuring the dynamical mass of a Brightest Cluster Galaxy at z=1.26 GNIRS 30.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110813 20110906 20110907 20110908 20110918 20110919 20110923 20110924 20111002 20111003 20111026 20111028 20111029 20111101 20111107 20111113 20111114 20111115 20111116 20111122 20111126 20111130 20111202 20111206 20111218 20120102 20120103
Completion Status:
100%
GN-2011B-Q-7 Cushing US Northern Hemisphere Follow-up Observations of WISE Brown Dwarf Candidates GNIRS / NIRI 37.70 [r12B]
Execution Status active / rollover Dates Taken:
20110808 20110809 20110815 20110816 20110817 20110818 20110820 20110826 20110828 20110829 20110927 20111012 20111013 20111019 20111022 20111024 20111025 20111217 20120103 20120105 20120224 20120328 20120330 20120331 20120423 20120425 20120805 20120806 20120906 20120922 20120925 20121112 20121114
Completion Status:
92%
GN-2011B-Q-8 Duchene US Towards a complete census of brown dwarfs in IC 348 GNIRS 20.60 [r12B]
Execution Status complete / rollover Dates Taken:
20110727 20110814 20110815 20110821 20110901 20110915 20110917 20110920 20110921 20110928 20110929 20111005 20111007 20111010 20111013
Completion Status:
100%
GN-2011B-Q-9 Fischer US A Pilot Study of Mid-IR Molecular Outflows in AGN Powered ULIRGs GNIRS 7.50 [r12B]
Execution Status complete / rollover Dates Taken:
20111109 20111110 20111115 20111216 20111218 20111225 20111230 20111231
Completion Status:
100%
GN-2011B-Q-10 Fox AU/GS Late-time Observations of Exceptional Swift and Fermi GRBs: Gemini North Standard Targets of Opportunity GMOS / GNIRS / NIRI 3.00
Execution Status complete / SToO Dates Taken:
20111128 20111223 20120125
Completion Status:
100%
GN-2011B-Q-11 Galicher CA Confirming a 23 AU Jovian planet candidate around a nearby young and dusty early-type star with Altair/NIRI NIRI+Altair 5.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110811 20110814 20110815 20111018 20111021 20111022
Completion Status:
100%
GN-2011B-Q-12 Geballe GS Additional Probes of the Galactic Center's Interstellar Medium - continuation GNIRS 7.50
Execution Status complete Dates Taken:
20110802 20110803 20110804 20110805 20110806 20110814
Completion Status:
100%
GN-2011B-Q-13 Gilbank CA The Redshift One-plus GMOS Ultra-deep Emission line Survey (ROGUES) GMOS 10.00 [r12B]
Execution Status active / rollover Dates Taken:
20110924
Completion Status:
15%
GN-2011B-Q-14 Grundy US Mutual Orbits and Masses of Kuiper Belt Binaries and Multiple Systems GNIRS+Altair / GNIRS+AltairLGS / NIRI+Altair / NIRI+AltairLGS 12.50
Execution Status complete Dates Taken:
20120412 20120506 20120507 20120508 20120510 20120511 20120609 20120612 20120613 20120715
Completion Status:
100%
GN-2011B-Q-15 Hirst GS The highest-redshift quasars in the UKIDSS LAS GMOS / GNIRS 4.00
Execution Status active / SToO Dates Taken:
20120121 20120123
Completion Status:
25%
GN-2011B-Q-16 Hsieh UH The Sublimation-Driven Nature of Main-Belt Comet Activity GMOS 3.00
Execution Status complete / SToO Dates Taken:
20111201 20111202
Completion Status:
100%
GN-2011B-Q-17 Hsieh UH Characterization of the Active Behavior of Main-Belt Comets GMOS / GNIRS 13.40
Execution Status complete Dates Taken:
20110802 20110828 20110829 20110830 20110831 20110925 20111126 20111231 20120125 20120127 20120128 20120131 20120201 20120213 20120215 20120221 20120513
Completion Status:
100%
GN-2011B-Q-18 Jha US Adding to the Treasury: Spectroscopic Classification of High-Redshift Supernovae Discovered by HST GMOS 7.80
Execution Status active / SToO Dates Taken:
20110822 20110928 20111223
Completion Status:
50%
GN-2011B-Q-19 Kerzendorf AU The Last Hope - Searching for Type Ia progenitors in Tycho's Supernova Remnant GNIRS+Altair 2.50 [r12B]
Execution Status complete / rollover Dates Taken:
20110703 20110704 20110705 20110907 20110908
Completion Status:
100%
GN-2011B-Q-20 Kriek US Physical Properties of z$\sim$1.5 Galaxies as a Function of Spectral Type GNIRS 17.50 [r12B]
Execution Status active / rollover Dates Taken:
20111031 20111101 20111106 20111122 20111130 20111204 20111205 20111206 20111207 20111208 20111209 20120426 20120428 20120601 20121201 20121212 20121222 20121224 20121231 20130103 20130104
Completion Status:
95%
GN-2011B-Q-21 Lidman AU Improving Type Ia supernovae as distance indicators NIRI 3.30 [r12B]
Execution Status complete / rollover Dates Taken:
20110808 20110816 20110817 20111016 20120121
Completion Status:
100%
GN-2011B-Q-22 Marois CA/US Altair/NIRI L-band Imaging of a Fifth Planet Around HR 8799 NIRI+Altair 13.50 [r12B]
Execution Status complete / rollover Dates Taken:
20110612 20110808 20110817 20111018 20111020 20111021 20111022 20111024 20111026 20120710 20120712 20120802
Completion Status:
100%
GN-2011B-Q-23 McLure UK Spectroscopic confirmation of a z=7.7 galaxy GNIRS 30.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110819 20110820 20110822 20110825 20110829 20110830 20110831 20110904 20110909 20110910 20110911 20110912 20110917 20110918 20110924 20110925 20110926 20111230
Completion Status:
100%
GN-2011B-Q-24 Muratore AR Kinematics of B[e] supergiant stars' disks GNIRS 0.90
Execution Status complete Dates Taken:
20110828 20110829 20111007
Completion Status:
100%
GN-2011B-Q-25 Navarete BR Dynamical Masses of MYSOs NIFS+AltairLGS 8.40 [r12B]
Execution Status complete / rollover Dates Taken:
20110908 20110909 20110913 20110917 20110918 20111009 20111011 20111016 20111209 20111215 20111216 20120609 20120612 20120615
Completion Status:
100%
GN-2011B-Q-26 Okoshi JP Faint emissions from heavy absorbers II: NIR imaging spectroscopy NIFS+Altair / NIFS+AltairLGS 7.50
Execution Status active Dates Taken:
20110917 20111017 20111209 20111210 20111217
Completion Status:
65%
GN-2011B-Q-27 Richstone US Probing the Envelope of the Black Hole Mass - Galaxy Dispersion Relation NIFS+AltairLGS 12.00 [r12B]
Execution Status complete / rollover Dates Taken:
20111206 20111208 20121001 20121002 20121005 20121029 20121030 20121031 20121101 20121102 20121125 20121129 20121227
Completion Status:
100%
GN-2011B-Q-28 Roe US Titan's Methane Weather post-Equinox: \\ Seasonal climate change and surface geology NIFS+Altair / NIRI+Altair 6.00
Execution Status active / SToO Dates Taken:
20120118 20120119 20120120 20120121 20120125 20120126 20120127 20120128 20120129 20120131 20120201
Completion Status:
42%
GN-2011B-Q-29 Sales BR On the Nature and Distribution of Dusty Material in Active Galactic Nucleus Michelle 2.80 [r12B]
Execution Status active / rollover Dates Taken:
20111115
Completion Status:
9%
GN-2011B-Q-30 Shih UH Massive Outflows in FR II Quasars and Radio Galaxies GMOS 9.60 [r12B]
Execution Status complete / rollover Dates Taken:
20110729 20110803 20110806 20110808 20110812 20110813 20110823 20110824 20110825
Completion Status:
100%
GN-2011B-Q-31 Smith UK Constraining the low-mass IMF in benchmark low-z strong-lens galaxies GNIRS 8.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110807 20110819 20110820 20110825 20110827 20110831 20110917
Completion Status:
100%
GN-2011B-Q-32 Stanghellini US The HII region population in M81 and the evolution of the radial metallicity gradient GMOS 1.60
Execution Status complete Dates Taken:
20111208 20111229 20111230
Completion Status:
100%
GN-2011B-Q-33 Stockton UH Low-z Analogs to High-z Compact Early-Type Galaxies GNIRS+AltairLGS 16.00 [r12B]
Execution Status active / rollover Dates Taken:
20111216 20130108
Completion Status:
9%
GN-2011B-Q-34 Tanvir AU/UK/GS/US Investigating gamma-ray bursts and their use as cosmological probes GMOS / GNIRS / NIRI 28.00
Execution Status active / RToO Dates Taken:
20110905 20110920 20110928 20111017 20111023 20111024 20111210 20120117 20120121
Completion Status:
45%
GN-2011B-Q-35 Tecza UK/UH High-Contrast NIFS spectroscopy and NIRI photometry of a low-mass companion to a nearby young star NIFS+Altair / NIRI+Altair 10.20
Execution Status complete Dates Taken:
20110806 20110807 20110808 20110809 20110813 20110906 20110910 20110911 20110912 20110918
Completion Status:
100%
GN-2011B-Q-36 Thalmann US A Complete Image of the LkCa 15 Disk Gap NIRI+Altair 3.00
Execution Status active Dates Taken:
20120204 20120213 20120214 20120224
Completion Status:
45%
GN-2011B-Q-37 Tonry UH Type Ia Supernova Science with SuperNovAe Cross Correlation Filters GMOS 9.00
Execution Status active / SToO Dates Taken:
20111201 20111208 20111209 20111210 20111230
Completion Status:
94%
GN-2011B-Q-38 Tucker AU/US Catching Supernovae in the Act with KISS (Kepler International Supernova Search) GMOS 18.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2011B-Q-215 Howell Copy of GS2011BQ15ToO Observation GMOS / GMOS-S 0.00
Execution Status complete Dates Taken:
20120117
Completion Status:
100%
GN Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2011B-Q-39 Aspin UH ToO Observations of Recently and Newly Discovered Young Eruptive Variables GMOS / Michelle / NIFS / NIRI 8.00
Execution Status active / SToO Dates Taken:
20110903 20110918 20110919 20110920 20111023 20111025 20111210 20111223
Completion Status:
64%
GN-2011B-Q-40 Bannister AU Hunting Signatures of Cryovolcanism on Charon GNIRS 2.00
Execution Status complete Dates Taken:
20110718
Completion Status:
100%
GN-2011B-Q-41 Bartlett US Planck SZ Clusters: Follow-up of the Planck Galaxy Cluster Catalog GMOS 21.00
Execution Status complete Dates Taken:
20110721 20110722 20110812 20110820 20110823 20110824 20110825 20110826 20110913 20110918 20110924 20110926 20110930 20111001 20111002 20111003 20111122 20111123 20111124 20111127 20111129 20111130 20111223 20111224 20111225 20111226 20111227 20111228 20111230 20120101 20120113 20120115 20120116 20120118 20120126 20120129 20120130 20120131 20120211 20120213
Completion Status:
100%
GN-2011B-Q-42 Bersier UK The Supernovae of Gamma-Ray Bursts: Exploring the diversity of stellar explosions GMOS 6.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GN-2011B-Q-43 Burningham AU Solving the late-T dwarf luminosity function discrepancy GNIRS 5.90
Execution Status complete / SToO Dates Taken:
20111116 20111122 20111123 20111124 20111126 20111128 20111210 20111217 20111219 20111224 20111225 20111226 20111227 20111229 20111230 20111231
Completion Status:
100%
GN-2011B-Q-44 Crenshaw US Resolving the Mechanisms of Feeding and Feedback in Nearby AGN NIFS+AltairLGS 11.00
Execution Status active Dates Taken:
20111017
Completion Status:
11%
GN-2011B-Q-45 Currie US NIRI Imaging of Transitional Protoplanetary Disks with Submm-Resolved Inner Holes/Gaps NIRI+Altair 15.00
Execution Status active Dates Taken:
20111025
Completion Status:
1%
GN-2011B-Q-46 de Mooij CA High precision measurements of thermal emission and reflected light from the very hot Jupiter WASP-12b GMOS 14.80
Execution Status complete Dates Taken:
20110811 20110812 20110813 20111118 20111121 20111122 20111123 20111203 20111215 20111216 20111227 20111228 20120119 20120120
Completion Status:
100%
GN-2011B-Q-47 Emery US Near-IR photometry of KBOs and Centaurs in support of Spitzer space telescope data NIRI 14.00
Execution Status active Dates Taken:
20110816 20110817 20111018 20111019 20111024 20111025 20111026
Completion Status:
51%
GN-2011B-Q-48 Farina AR H2 emission linked to massive young stellar objects in NGC 604 GNIRS 5.60
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-49 Foley US The Most Precise Distances to Type Ia Supernovae GMOS 12.90
Execution Status active / SToO Dates Taken:
20110812 20111002 20111129 20120117 20120119 20120120 20120121 20120125 20120131 20120201
Completion Status:
100%
GN-2011B-Q-50 Fraser UK Detecting the progenitors of core collapse supernovae - precision astrometry with ALTAIR GNIRS+Altair / NIRI+Altair / NIRI+AltairLGS 3.00
Execution Status active / SToO Dates Taken:
20120203 20120204 20120213
Completion Status:
29%
GN-2011B-Q-51 Geballe GS Search for Direct Evidence of Upwelling CH4 from the South Polar Hot Spot of Neptune GNIRS 3.00
Execution Status complete Dates Taken:
20111017 20111023 20111030
Completion Status:
100%
GN-2011B-Q-52 Geballe GS Spectroscopy of the 3.4-micron hydrocarbon feature toward the Galactic anti-center GNIRS 1.00
Execution Status complete Dates Taken:
20111007 20111019 20111021 20111029
Completion Status:
100%
GN-2011B-Q-53 Geballe GS H3+ as a probe of the nuclear diffuse gas of NGC1068 GNIRS 1.00
Execution Status complete Dates Taken:
20110723 20110724 20110803 20111011
Completion Status:
100%
GN-2011B-Q-54 Glazebrook CA/GS/US Local counterparts to high-redshift turbulent galaxies: what are the stellar kinematics? GMOS 32.00
Execution Status complete Dates Taken:
20110728 20110920 20110921 20110923 20110924 20110925 20110926 20110927 20111008 20111009 20111123 20111124 20111125 20111127 20111129 20111226 20111228 20120118 20120120 20120324 20120330
Completion Status:
100%
GN-2011B-Q-55 Grundy US Mutual Orbits and Masses of Kuiper Belt Binaries and Multiple Systems NIRI+AltairLGS 12.50
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-56 Hall CA Weak Line Quasars at High Redshift: Anemic Broad-line Regions or Extremely High Accretion Rates? GNIRS 12.00
Execution Status active Dates Taken:
20110830 20110831
Completion Status:
43%
GN-2011B-Q-57 Herbst GS/US Near Infrared Spectroscopy of the Unique T Tauri Binary System KH 15D GNIRS 4.10
Execution Status complete Dates Taken:
20120103 20120104
Completion Status:
100%
GN-2011B-Q-58 Hilton UK The Evolution of Galaxy Cluster Mass-Observable Scaling Relations GMOS 18.30
Execution Status complete Dates Taken:
20110729 20110803 20110812 20110821 20110913 20110914 20110920 20110921 20110924 20110925 20110928 20111005 20111006 20111123 20111126 20111129 20111223 20111224 20111225 20111226 20111229 20111231 20120101
Completion Status:
100%
GN-2011B-Q-59 Irwin UK Seasonal changes in Uranus' atmosphere NIFS+Altair 4.50
Execution Status active Dates Taken:
20110830 20110831 20110905 20110909 20120102 20120103
Completion Status:
84%
GN-2011B-Q-60 Kavelaars CA Stellar Occultations of Large Kuiper Belt Objects - Astrometric Solutions GMOS 9.90
Execution Status complete Dates Taken:
20110724 20110725 20110726 20110727 20110728 20110804 20110806 20110825 20110826 20110901 20110903 20110904 20110906 20110907 20110919 20111123 20111124 20111126
Completion Status:
100%
GN-2011B-Q-61 Mackey CA/AU/UK Dynamics of the accreted remote globular cluster system of M31 GMOS 25.00
Execution Status active Dates Taken:
20110802 20110806 20110809 20110812 20110825 20110827 20110828 20110829 20110830 20110901 20110903 20110904 20110905 20110907 20110909 20110928 20110929 20120121 20120203 20120210 20120215 20120808
Completion Status:
100%
GN-2011B-Q-62 McDermid UK/US Feedback in action: mapping the molecular outflow in NGC1266 with NIFS+LGS-AO NIFS+Altair / NIFS+AltairLGS 9.00
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-63 McDermid UK/GS Searching for Carbon Star Signatures in Early-Type Galaxies GNIRS 18.00
Execution Status complete Dates Taken:
20110805 20111016 20111216 20111218 20111229 20111230 20120102 20120104 20120105 20120128 20120129
Completion Status:
100%
GN-2011B-Q-64 Morales-Calderon GS/US Confirmation and Characterization of Four New Low-Mass Pre-Main-Sequence Eclipsing Binaries in Orion GNIRS 35.60
Execution Status active Dates Taken:
20110801 20110802 20110903 20110916 20110919 20110927 20110929 20111001 20111004 20111011 20111013 20111017 20111018 20111020 20111022 20111023 20111027 20111028 20111029 20111030 20111031 20111101 20111109 20111110 20111113 20111114 20111116 20111128 20111130 20111202 20111206 20111210 20120118 20120130
Completion Status:
89%
GN-2011B-Q-65 Muzerolle US Periodic Protostellar Variability: Testing the Pulsed Accretion Hypothesis GNIRS / NIRI 5.00
Execution Status active Dates Taken:
20111210
Completion Status:
0%
GN-2011B-Q-66 Penny AU A transforming galaxy in the core of a rich cluster: galaxy transformation caught in the act. GMOS 1.40
Execution Status complete Dates Taken:
20110913 20111001 20111002 20111003 20111004 20111007 20111125 20111126 20111129 20111206
Completion Status:
100%
GN-2011B-Q-67 Perlmutter AU/UK Galaxy Cluster Supernovae at z~0.5: Dissecting the Hubble Diagram GMOS 5.00
Execution Status active / SToO Dates Taken:
20111130
Completion Status:
0%
GN-2011B-Q-68 Phillips US Near-Infrared Spectroscopic Followup of Type Ia Supernovae in the Hubble Flow GNIRS 10.00
Execution Status active / SToO Dates Taken:
20110826 20110828 20110829 20110831 20110903 20110907 20110910 20110911 20110913 20110917 20110918 20110922 20110924 20110925 20110926 20110927 20111229 20120101 20120104 20120117 20120119 20120127 20120128
Completion Status:
97%
GN-2011B-Q-69 Rapoport AU Investigating GRB-SN connection for real GRBs GMOS 16.20
Execution Status active / SToO Dates Taken:
20111223 20111229 20120105
Completion Status:
4%
GN-2011B-Q-70 Rich UH An Integral Field Study of U/LIRGs GMOS 9.00
Execution Status complete Dates Taken:
20111001 20111002 20111003 20111004 20111007 20120127 20120128 20120129 20120202 20120214 20120215
Completion Status:
100%
GN-2011B-Q-71 Riffel BR Two-Dimensional Stellar Populations in Active Galaxies using NIFS NIFS+Altair / NIFS+AltairLGS 8.80
Execution Status complete Dates Taken:
20110908 20110909 20110910 20110911 20110919 20110920 20110924 20110926 20111208 20111209 20111210 20111215 20111216
Completion Status:
100%
GN-2011B-Q-72 Riffel BR A new method to trace young stellar populations GNIRS 8.60
Execution Status complete Dates Taken:
20110804 20110805 20110811 20110813 20111013 20111014 20111019
Completion Status:
100%
GN-2011B-Q-73 Ryder AU Extinction towards Supernovae 2010O and 2010P NIRI+AltairLGS 3.20
Execution Status complete Dates Taken:
20120128 20120129 20120131
Completion Status:
100%
GN-2011B-Q-74 Schiavon GS CNO Abundances in Resolved M31 Globular Clusters Stars GNIRS+Altair 8.00
Execution Status active Dates Taken:
20110920 20110924 20110925 20110926 20110927 20110928 20111107 20111115 20111116 20120105
Completion Status:
72%
GN-2011B-Q-75 Smartt UK/UH Ultrabright optical transients : giant supernova in dwarf hosts GMOS 10.00
Execution Status complete / SToO Dates Taken:
20111201 20111202 20111223 20111224 20111225 20111227 20111228 20120126
Completion Status:
100%
GN-2011B-Q-76 Spencer US The Nature of the Hydrated Material on Europa NIFS+Altair 6.00
Execution Status active Dates Taken:
20111020 20111022
Completion Status:
54%
GN-2011B-Q-77 Thalmann CA/UH A Complete Image of the LkCa 15 Disk Gap NIRI+Altair 6.10
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-78 Thomas US Confirming Q-type asteroids in the main asteroid belt GMOS / GNIRS 11.00
Execution Status active Dates Taken:
20110822 20111227 20111228
Completion Status:
60%
GN-2011B-Q-79 Trujillo GS Primordial Solar System Ices NIRI 6.30
Execution Status active Dates Taken:
20111018 20111025 20120201 20120202 20120213 20120401
Completion Status:
75%
GN-2011B-Q-80 Wegner US The dark matter density of elliptical galaxies in voids NIRI+AltairLGS 4.00
Execution Status active Dates Taken:
20110815 20110816 20111016 20111017
Completion Status:
90%
GN Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GN-2011B-Q-81 Bastien CA Acceleration in a T-Tauri jet ? GMOS 2.50
Execution Status complete Dates Taken:
20111010 20120101 20120102
Completion Status:
100%
GN-2011B-Q-82 Beck CA Circumstellar Gas in Proto-Solar Nebula Analogs NIFS+Altair / NIRI+Altair 6.40
Execution Status active Dates Taken:
20111021 20111022 20111025 20111026 20111101 20111210 20120101 20120104
Completion Status:
100%
GN-2011B-Q-83 Bonavita CA Supermassive Planets or Ultralight Brown Dwarfs? A New Population of Wide Substellar Companions NIRI+Altair 20.00
Execution Status active Dates Taken:
20111017 20111019 20111020 20111021 20111022 20111024 20111025 20111026
Completion Status:
38%
GN-2011B-Q-84 Bresolin UH Chemical abundances in the outer disks of spiral galaxies GMOS 9.00
Execution Status complete Dates Taken:
20110901 20110903 20110930 20111123 20111124 20111126 20111128 20111129 20111202 20111203 20111218 20120115 20120118 20120129 20120216 20120219 20120226
Completion Status:
100%
GN-2011B-Q-85 Chapman US GNIRS spectroscopy of HDF259, a candidate z=6.3 sub-millimetre galaxy. GNIRS 2.30
Execution Status complete Dates Taken:
20111128 20111201 20111202 20111207 20111210 20111213 20111214 20120118 20120120
Completion Status:
100%
GN-2011B-Q-86 Connelley UH Understanding the Mass Building Phase of Protostellar Evolution using NIFS Spectral Imaging NIFS+Altair 12.00
Execution Status active Dates Taken:
20110724 20110824 20110825 20110829 20110901 20111014 20111019 20111023 20120105
Completion Status:
75%
GN-2011B-Q-87 Couch AU The Build-up of the Red Sequence in Galaxy Clusters GMOS 7.50
Execution Status active Dates Taken:
20110913
Completion Status:
0%
GN-2011B-Q-88 de Pater US ALTAIR/NIRI AO Imaging of Volcanic Eruptions on Io NIRI+Altair 9.50
Execution Status active Dates Taken:
20111020
Completion Status:
2%
GN-2011B-Q-89 Faifer AR Compact Elliptical Galaxies in the Pegasus Group? GMOS 1.00
Execution Status complete Dates Taken:
20110725 20110726
Completion Status:
100%
GN-2011B-Q-90 Geballe GS Additional Probes of the Galactic Center's Interstellar Medium - continuation GNIRS 7.50
Execution Status complete Dates Taken:
20110821 20110823 20110825 20110827 20110830 20110831 20110902 20110903 20110904
Completion Status:
100%
GN-2011B-Q-91 Gregorio-Hetem BR Mixing of young and older stellar clusters in CMa R1 GMOS 5.80
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-92 Hatch UK A study of environmental effects in a z=2.5 proto-cluster NIRI 7.00
Execution Status complete Dates Taken:
20110812 20110820 20110822 20111013 20111014 20111019 20111022
Completion Status:
100%
GN-2011B-Q-93 Hebb US Defining the M dwarf Mass-Radius relation as a function of activity and metallicity GNIRS 49.00
Execution Status complete Dates Taken:
20110811 20110812 20110813 20110814 20110815 20110816 20110817 20110821 20110822 20110826 20110829 20110831 20110904 20110905 20110907 20110908 20110909 20110910 20110911 20110912 20110914 20110915 20110918 20110919 20110920 20110921 20110922 20110926 20110928 20110929 20111001 20111002 20111003 20111004 20111005 20111006 20111007 20111008 20111009 20111010 20111011 20111013 20111014 20111015 20111019 20111020 20111021 20111022 20111023 20111027 20111028 20111030 20111105 20111116 20111124 20111128 20111129
Completion Status:
100%
GN-2011B-Q-94 Irwin UK Dynamics of Neptune's atmosphere NIFS+Altair 9.00
Execution Status complete Dates Taken:
20110830 20110831 20110901 20110905 20110906 20110907 20110909 20110911
Completion Status:
100%
GN-2011B-Q-95 Kilic US The Two Shortest Period Detached Binary White Dwarfs GMOS 2.50
Execution Status complete Dates Taken:
20120102
Completion Status:
100%
GN-2011B-Q-96 Koss US Searching for Compton-Thick Dual AGN In Extremely Close Mergers GMOS 0.70
Execution Status complete Dates Taken:
20110903 20110906 20111127 20111129 20111206 20111208 20120118 20120127
Completion Status:
100%
GN-2011B-Q-97 Landt AU A near-IR relationship for estimating AGN black hole masses GNIRS 4.92
Execution Status complete Dates Taken:
20110803 20110804 20110807 20110808 20110810 20110811 20110813 20110814 20111130 20111205 20111208 20111218
Completion Status:
100%
GN-2011B-Q-98 Lemoine-Busserolle GS The connection between Star Formation and AGN in galaxies at z~2 GNIRS 9.20
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-99 Mason GS What causes the low 7.7/11.3 micron PAH ratios in low-luminosity AGN? NIRI 3.50
Execution Status complete Dates Taken:
20110816 20110820 20110822 20120704 20120705
Completion Status:
100%
GN-2011B-Q-100 Melin UK Detecting auroral H3+ emission from Uranus GNIRS 24.00
Execution Status complete Dates Taken:
20110922 20111003 20111004 20111005 20111006 20111007 20111008 20111009 20111011 20111015 20111017 20111020 20111023 20111025 20111028 20111030 20111113 20111114 20111129 20111130 20111203 20111204 20111205 20111206 20111218 20120102
Completion Status:
100%
GN-2011B-Q-101 Milisavljevic US Resolving SN Ejecta Asymmetries with High-Dispersion Spectra GMOS 6.50
Execution Status active / SToO Dates Taken:
20110818 20110824
Completion Status:
28%
GN-2011B-Q-102 Riffel BR Feeding and Feedback in nearby AGN: The case of Mrk 620 and Mrk 607 NIFS+Altair 4.40
Execution Status active Dates Taken:
Completion Status:
0%
GN-2011B-Q-103 Sainz AR Astrochemistry of Young Brown Dwarfs Proto-Planetary Disks GNIRS 3.10
Execution Status active Dates Taken:
20110922 20110923 20111110 20111113 20111114 20111116
Completion Status:
41%
GN-2011B-Q-104 Sonnett UH Surface Properties of Trans-Neptunian Misfits GMOS / GNIRS / NIRI 13.00
Execution Status active Dates Taken:
20110831 20110926 20110927 20111019 20111022
Completion Status:
20%
GN-2011B-Q-105 Sromovsky US Probing Uranus' Atmosphere With Discrete Cloud Observations NIRI+Altair 8.00
Execution Status active Dates Taken:
20111023 20111024 20111025 20111026
Completion Status:
100%
GN-2011B-Q-106 Wainscoat UH Physical properties of large bodies in the outer solar system GMOS / GNIRS 10.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%

The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2011B-Q-1 Stritzinger CL Rapid ToO spectroscopy of very young supernovae GMOS-S 10.00
Execution Status active / RToO Dates Taken:
20110830 20110903 20110905 20110906 20110907 20110908 20111104 20111120 20111121 20111122 20111204 20120102 20120124 20120130
Completion Status:
94%
GS-2011B-Q-2 Bailey US A search for the perturbing planets in large gap debris disks NICI 8.00 [r12B]
Execution Status complete / rollover Dates Taken:
20111016 20111017 20111031 20111101 20111102 20111105 20120318 20120319 20120320 20120326 20120329 20120330
Completion Status:
100%
GS-2011B-Q-3 Berger US/GS Exotic Explosions and Eruptions: Exploring a New Transient Phase-Space with Pan-STARRS GMOS-S 12.00
Execution Status complete / SToO Dates Taken:
20110922 20111002 20111005 20111126 20111204 20111205 20111229 20120202
Completion Status:
100%
GS-2011B-Q-4 Bersier UK The Supernovae of Gamma-Ray Bursts: Exploring the diversity of stellar explosions GMOS-S 6.00
Execution Status active / SToO Dates Taken:
20110806
Completion Status:
0%
GS-2011B-Q-5 Breton CA Measuring the Masses of Pulsars with Irradiated Companions (South) GMOS-S 10.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110906 20110918 20110923 20120511 20120517 20120520 20120521 20120625 20120710 20120716 20120717
Completion Status:
100%
GS-2011B-Q-6 Carrasco UK/US/GS/BR/CA Constraining the Mass of the Spectacular Pandora's Cluster, Abell 2744 GMOS-S 19.80 [r12B]
Execution Status complete / rollover Dates Taken:
20110725 20110805 20110902 20110904 20110918 20111014 20111029 20120614 20120630 20120821 20120822 20120823 20120914 20121012 20121013 20121017 20121018 20121111 20121117 20121118 20121201 20121204 20121205 20121207 20121208
Completion Status:
100%
GS-2011B-Q-7 Cobb GS Late-time Observations of Exceptional Swift and Fermi GRBs: Gemini South Standard Targets of Opportunity GMOS-S 2.00
Execution Status complete / SToO Dates Taken:
20111219 20111221
Completion Status:
100%
GS-2011B-Q-8 Crotts US Spectroscopic Evolution of SNR 1987A and Its Light Echo GMOS-S 11.00
Execution Status complete Dates Taken:
20110831 20110922 20110924 20111217 20111221 20111222 20111223 20120203 20120204 20120205 20120207
Completion Status:
100%
GS-2011B-Q-9 Cucchiara UK/US/GS/AU Exceptional Swift and Fermi GRBs: Gemini South Rapid Targets of Opportunity GMOS-S 14.00
Execution Status active / RToO Dates Taken:
20110831 20110916 20111009 20111021 20111022 20111107 20111118 20111120 20111210 20111229 20111230 20120119
Completion Status:
82%
GS-2011B-Q-10 Donzelli AR Stellar Populations in Extragalactic Globular Clusters GMOS-S 3.70
Execution Status complete Dates Taken:
20110831 20110906 20110918 20111118 20111130
Completion Status:
100%
GS-2011B-Q-11 Fletcher UK/US/GS Jupiter's Global Dynamics a Decade after Cassini: Spectroscopic Mapping TReCS 16.50
Execution Status active Dates Taken:
20110916 20110919 20111124 20111125
Completion Status:
54%
GS-2011B-Q-12 Gaensicke UK/GS Aiming very low: The mass-radius relation of a He-core white dwarf and a low-mass star near the main-sequence/brown dwarf boundary GMOS-S 7.15
Execution Status complete Dates Taken:
20111201 20111219 20111220 20111221
Completion Status:
100%
GS-2011B-Q-13 Gibson UK Probing the atmosphere of a hot-Saturn exoplanet with differential transmission spectroscopy GMOS-S 6.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110907 20111001 20111003 20111004 20111008 20111019 20120608
Completion Status:
100%
GS-2011B-Q-14 Glazebrook AU Local counterparts to high-redshift turbulent galaxies: what are the stellar kinematics? GMOS-S 14.00
Execution Status complete Dates Taken:
20111003 20111004 20111018 20111020 20111021 20111022 20111023 20120121 20120122 20120123 20120124 20120125 20120126 20120127
Completion Status:
100%
GS-2011B-Q-15 Howell UK/US Type Ia supernovae: the progenitor revolution GMOS-S 9.00
Execution Status active / RToO Dates Taken:
20111010 20111012 20111204 20111222 20120119 20120128 20120131 20120202
Completion Status:
69%
GS-2011B-Q-16 Hwang US Spectroscopic Study of New Extended Star Clusters in NGC 6822 GMOS-S 15.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110831 20110901 20110921 20110926 20110927 20111022 20111031 20111102
Completion Status:
100%
GS-2011B-Q-17 Irwin GS/BR A Potential Post-Tidal Disruption Event by an Intermediate-Mass Black Hole in an Extragalactic Globular Cluster GMOS-S 8.00
Execution Status complete Dates Taken:
20110901 20110903 20110918 20110926 20111005 20111022 20111023 20111024 20111030 20111031
Completion Status:
100%
GS-2011B-Q-18 Jha US Adding to the Treasury: Spectroscopic Classification of High-Redshift Supernovae Discovered by HST GMOS-S 15.20
Execution Status active / SToO Dates Taken:
20110805 20110806 20120120 20120122 20120124 20120126
Completion Status:
30%
GS-2011B-Q-19 Kraus US Resolving planet-cleared gaps in transitional/pre-transitional disks with NIR+MIR+sub-mm interferometry TReCS 7.00 [r12B]
Execution Status active / rollover Dates Taken:
20111123 20111124 20120501 20120503 20120727 20120729 20120730
Completion Status:
97%
GS-2011B-Q-20 Levenson GS A Complete AGN Sample to Test Unification TReCS 13.10
Execution Status complete Dates Taken:
20110906 20110907 20110908 20110912 20110920 20111124
Completion Status:
100%
GS-2011B-Q-21 Maund US Return to the site of the Type IIP Supernova 2008bk GMOS-S 3.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110921 20110924
Completion Status:
100%
GS-2011B-Q-22 Minezaki JP Mid-infrared imaging of lensed QSOs to decipher subhalos -- the final target TReCS 7.50
Execution Status complete Dates Taken:
20110912 20120913 20120922 20120923
Completion Status:
100%
GS-2011B-Q-23 Nagar CL Tracing gas flows in Active Galactic Nuclei down to the innermost few parsecs: Completion of a statistically meaningful "sample" GMOS-S 7.00
Execution Status complete Dates Taken:
20110923 20110924 20110927
Completion Status:
100%
GS-2011B-Q-24 Naud US/CA A Planet Search around Young-associations M dwarfs (PSYM survey) NICI 22.00
Execution Status active Dates Taken:
20110911 20111007 20111008 20111016 20111017 20111020 20111021 20111022 20111031 20111102 20111103 20111104 20111105 20111106 20111122
Completion Status:
74%
GS-2011B-Q-25 Pignata CL Characterizing subluminous Supernovae Ia through nebular spectroscopy GMOS-S 5.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-26 Rabus CL Search for warm dust and sub-stellar companions at the astronomical unit scale around "Vega-like" main-sequence stars: Tau Ceti NICI 4.00 [r12B]
Execution Status complete / rollover Dates Taken:
20111003 20111020 20111026 20111106 20120902 20120925
Completion Status:
100%
GS-2011B-Q-27 Roe US Titan's Methane Weather post-Equinox: Seasonal climate change and surface geology NICI 4.00
Execution Status active / SToO Dates Taken:
Completion Status:
0%
GS-2011B-Q-28 Sahu US Detecting Isolated Black Holes through Astrometric Microlensing GMOS-S 3.00
Execution Status complete Dates Taken:
20110925 20111103
Completion Status:
100%
GS-2011B-Q-29 Sales BR On the Nature and Distribution of Dusty Material in Active Galactic Nucleus TReCS 2.20 [r12B]
Execution Status rollover Dates Taken:
20110911 20111125
Completion Status:
57%
GS-2011B-Q-30 Schaefer US Solving the Type Ia Supernova Progenitor Problem By Identifying the Ex-Companion Stars in Three LMC Supernova Remnants of Confident Type Ia Events GMOS-S 12.50 [r12B]
Execution Status active / rollover Dates Taken:
20110921 20111002 20111006 20111017 20111019 20111021 20111022 20111104 20111105 20111106 20111108 20111120 20111123
Completion Status:
60%
GS-2011B-Q-31 Servillat UK/AU What feeds the intermediate mass black hole HLX-1 in ESO~243-49? GMOS-S 8.30
Execution Status complete Dates Taken:
20110831 20110906 20110922 20110924 20111005 20111006
Completion Status:
100%
GS-2011B-Q-32 Smartt UK Ultrabright optical transients : giant supernova in dwarf hosts GMOS-S 10.00
Execution Status complete / SToO Dates Taken:
20111006 20111016 20111104 20111204 20120118 20120119 20120120 20120121
Completion Status:
100%
GS-2011B-Q-33 Stubbs US Spectroscopy of Galaxies in Massive Clusters: Galaxy Properties and Dynamical Cluster Mass Calibration GMOS-S 5.50
Execution Status active Dates Taken:
20110830 20110901 20110902 20110903 20110905 20110906 20110907 20110908 20110923
Completion Status:
87%
GS-2011B-Q-34 Thompson US High Spatial Resolution MIR Spectroscopy of Seyfert Nuclei TReCS 6.20 [r12B]
Execution Status active / rollover Dates Taken:
20120921 20120922 20120923
Completion Status:
85%
GS-2011B-Q-35 Tinney UK/CL/AU Imaging companions from the Anglo-Australian Planet Search NICI 19.30
Execution Status active Dates Taken:
20111021 20111030 20111031 20111103 20111104 20111105 20111107 20111108 20111122
Completion Status:
69%
GS-2011B-Q-36 Torres-Flores CL Star formation in the intragroup medium and metallicity gradients in galaxy groups GMOS-S 8.00
Execution Status complete Dates Taken:
20110827 20110830 20110918 20110924 20111001 20111017 20111029 20111030 20111118 20111201 20111202 20111203 20111204 20111205 20111228 20111229 20111230 20120911 20120916 20120918
Completion Status:
100%
GS-2011B-Q-37 Werk US Finding the Edge of the Galactic Wind's Influence GMOS-S 12.00 [r12B]
Execution Status complete / rollover Dates Taken:
20110830 20110905 20110908 20111029 20111117 20111118 20111120 20111121 20111122 20111123 20111124 20111125 20111126 20111129 20111201 20111202 20111203 20111204 20111231
Completion Status:
100%
GS-2011B-Q-38 Wilson CA The Gemini Cluster Astrophysics Spectroscopic Survey (GCLASS) GMOS-S 9.50 [r12B]
Execution Status complete / rollover Dates Taken:
20111029 20111124 20111126 20111222 20120118 20120119 20120911 20120914 20121009 20121012
Completion Status:
100%
GS-2011B-Q-229 Sales BR On the Nature and Distribution of Dusty Material in Active Galactic Nucleus Michelle / TReCS 2.80 [r12B]
Execution Status rollover Dates Taken:
20111115
Completion Status:
9%
GS-2011B-Q-500 Liu UK/US/GS/GT/CA NICI Extrasolar Planet Search Campaign (I) NICI 50.00
Execution Status active Dates Taken:
20110913 20110914 20110915 20110916 20111030 20111031 20111103 20111104 20111107 20111116 20111122
Completion Status:
34%
GS-2011B-Q-501 Liu UK/US/GS/GT/CA NICI Extrasolar Planet Search Campaign (II) NICI 50.00
Execution Status active Dates Taken:
20110913 20110914 20110915 20111003 20111005 20111011 20111016 20111017 20111020 20111021 20111031 20111103 20111104 20111105 20111122
Completion Status:
62%
GS-2011B-Q-1001 Leggett GS Dummy rollover program for ITAC 12A GMOS-S 48.00 [r12B]
Execution Status rollover Dates Taken:
Completion Status:
0%
GS Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2011B-Q-39 Anguita CL Mass to light ratios and evolution of galaxy scale lenses from the RCS2 GMOS-S 22.00
Execution Status active Dates Taken:
20111101 20111116 20111118 20111119 20111126 20111222
Completion Status:
31%
GS-2011B-Q-40 Artigau CA Following the traces of the little man NICI 1.80
Execution Status complete Dates Taken:
20120302 20120304 20120314
Completion Status:
100%
GS-2011B-Q-41 Bai CA The zRCS Deep Group Survey GMOS-S 35.00
Execution Status active Dates Taken:
20110906 20110924 20111203
Completion Status:
5%
GS-2011B-Q-42 Bessiere UK The evolution of quasar host galaxies GMOS-S 12.60
Execution Status active Dates Taken:
20110710 20110804 20110903 20110906 20110910 20110919 20111023 20111024 20111122 20111130 20111223 20111226 20111228 20111229 20120120 20120121
Completion Status:
94%
GS-2011B-Q-43 Cenko US Probing the Central Black Holes of Distant, Quiescent Galaxies via Tidal Disruption Flares GMOS-S 3.00
Execution Status complete / SToO Dates Taken:
20111227 20111228 20111229
Completion Status:
100%
GS-2011B-Q-44 Chornock US Host Galaxies of the Most Luminous Supernovae Found by PAN-STARRS1 GMOS-S 2.00
Execution Status complete Dates Taken:
20110920 20111129
Completion Status:
100%
GS-2011B-Q-45 Desert US Searching for high altitude absorbers in the atmospheres of two hot Jupiter prototypes GMOS-S 12.00
Execution Status complete Dates Taken:
20111005 20111006 20111010 20111012 20111120 20111129 20111130
Completion Status:
100%
GS-2011B-Q-46 Drake US Lumnious Optical Transients and their Progenitors GMOS-S 12.00
Execution Status active / SToO Dates Taken:
20120117 20120120
Completion Status:
10%
GS-2011B-Q-47 Edge UK The balance of star-formation and AGN activity in the most distant known cooling flows GMOS-S 25.00
Execution Status active Dates Taken:
20111002 20111003 20111024 20111101 20111201 20111228 20111229 20111230 20111231 20120121 20120124 20120130
Completion Status:
23%
GS-2011B-Q-48 Foley US The Most Precise Distances to Type Ia Supernovae GMOS-S 12.90
Execution Status complete / SToO Dates Taken:
20110922 20110927 20111130 20111204 20111231 20120120 20120122 20120123 20120124 20120201 20120202 20120305
Completion Status:
100%
GS-2011B-Q-49 Hagele AR The CNSF rings of Seyfert galaxies and their connection with the active nuclei: abundances and kinematics GMOS-S 5.00
Execution Status active Dates Taken:
20111126
Completion Status:
0%
GS-2011B-Q-50 Hilton UK The Evolution of Galaxy Cluster Mass-Observable Scaling Relations GMOS-S 24.40
Execution Status complete Dates Taken:
20110906 20110913 20110918 20111001 20111004 20111005 20111016 20111024 20111029 20111030 20111104 20111116 20111118 20111119 20111120 20111126 20111201 20111202 20111203 20111223 20111224 20111227 20111230 20111231 20120117
Completion Status:
100%
GS-2011B-Q-51 Hsieh US The Sublimation-Driven Nature of Main-Belt Comet Activity GMOS-S 6.00
Execution Status SToO Dates Taken:
20111123 20111205
Completion Status:
39%
GS-2011B-Q-52 Kilic US The Two Shortest Period Detached Binary White Dwarfs GMOS-S 4.50
Execution Status complete Dates Taken:
20110923 20111002
Completion Status:
100%
GS-2011B-Q-53 Leggett GS z-band imaging of GJ 3483B: defining the blue end of a cold spectrum GMOS-S 9.90
Execution Status complete Dates Taken:
20111205 20111230 20111231 20120118 20120119 20120120 20120121
Completion Status:
100%
GS-2011B-Q-54 Makler BR Gemini follow-up of strong lensing systems discovered on the CFHT Stripe-82 survey GMOS-S 4.00
Execution Status active Dates Taken:
20111116
Completion Status:
12%
GS-2011B-Q-55 Margheim GS The Lithium Depletion Boundary and Age of the Southern Open Cluster Collinder 70 GMOS-S 10.00
Execution Status complete Dates Taken:
20110927 20111006 20111031 20111104 20111105 20111107 20111201 20111222 20111223 20111230 20111231 20120127 20120129 20120131 20120201 20120202 20120219 20120220
Completion Status:
100%
GS-2011B-Q-56 Martioli BR Direct Imaging of Exoplanet Candidates to Explore the Mass-Luminosity Relation at Very Low-Mass Range NICI 8.00
Execution Status active Dates Taken:
20110926
Completion Status:
4%
GS-2011B-Q-57 Melis US/CA A Search for Giant Planets around a Nearby, Young, Low-mass Star NICI 3.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-58 Milisavljevic US Resolving SN Ejecta Asymmetries with High-Dispersion Spectra GMOS-S 3.30
Execution Status complete / SToO Dates Taken:
20120125 20120126 20120127 20120129 20120204 20120302 20120304 20120318 20120319 20120420 20120501
Completion Status:
100%
GS-2011B-Q-59 Motta GS/CL Isothermal or not isothermal: Discriminating different density profiles in the galaxy cluster MS 0440.5+0204 GMOS-S 11.40
Execution Status active Dates Taken:
20111002 20111126 20111223 20111227 20111228 20120102 20120103 20120120
Completion Status:
12%
GS-2011B-Q-60 Pandian US Mid-infrared morphologies of massive young stellar objects TReCS 10.00
Execution Status complete Dates Taken:
20110907 20110908 20110920 20120728 20120730 20120826
Completion Status:
100%
GS-2011B-Q-61 Pastoriza BR The Nature of Two Giant HII Region (GHIIR) in the Minor Merger AM2306-721 GMOS-S 5.40
Execution Status complete Dates Taken:
20110925 20110926
Completion Status:
100%
GS-2011B-Q-62 Rapoport AU Investigating GRB-SN connection for real GRBs GMOS-S 16.20
Execution Status active / SToO Dates Taken:
20111223 20111226
Completion Status:
5%
GS-2011B-Q-63 Rebassa-Mansergas UK/CL Searching for close double white dwarfs in the Sloan Digital Sky Survey GMOS-S 15.00
Execution Status complete Dates Taken:
20110907 20110908 20110910 20110911 20110912 20110914 20110915 20110916 20110918 20110922
Completion Status:
100%
GS-2011B-Q-64 Rupke US Looking for QSO Feedback: Two's a Company, Three's a Crowd GMOS-S 8.00
Execution Status active Dates Taken:
20111116 20111119 20111203 20111205 20111206 20111226 20111231
Completion Status:
61%
GS-2011B-Q-65 Sivakoff CA Revealing the Black Hole in a Globular Cluster of the Elliptical Galaxy NGC 1380 GMOS-S 4.00
Execution Status complete Dates Taken:
20111126 20111226 20120117 20120118 20120119 20120120
Completion Status:
100%
GS-2011B-Q-66 Stern US Spectroscopic Confirmation of Spitzer-Selected Galaxy Clusters at z~1.4 GMOS-S 5.00
Execution Status active Dates Taken:
20110807 20110918 20111201
Completion Status:
10%
GS-2011B-Q-67 Subasavage US/GS The Hidden Radial Velocity Companion to the Nearby Halo Star and Prototype Carbon Dwarf G77-61 GMOS-S 5.50
Execution Status active Dates Taken:
20110907 20110923 20111002 20111003 20111018 20111019 20111020 20120126 20120127 20120205
Completion Status:
78%
GS-2011B-Q-68 Thomas US Confirming Q-type asteroids in the main asteroid belt GMOS-S 3.30
Execution Status complete Dates Taken:
20110903 20110905 20110906
Completion Status:
100%
GS-2011B-Q-69 Tokovinin GS Confirming Hipparcos Astrometric Companions with NICI AO imaging NICI 14.80
Execution Status complete Dates Taken:
20110912 20110913 20110915 20110918 20110927 20110928 20111011 20111012 20111013 20111017 20111019 20111021 20111103 20111105 20111106 20111107 20111108 20111116 20120229 20120328 20120506 20120507 20120528 20120531 20120602 20120702 20120707 20120708 20120709 20120710 20120713
Completion Status:
100%
GS-2011B-Q-70 Ueta US Probing of the Structure of Proto-Planetary Nebulae with Angular Differential Imaging NICI 6.00
Execution Status complete Dates Taken:
20120320 20120326 20120327 20120328 20120329 20120330 20120402 20120405 20120902
Completion Status:
100%
GS-2011B-Q-71 Vieira BR Chemical evolution of dust in Herbig Ae/Be stars TReCS 3.30
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-72 Wilson US The Gemini Cluster Astrophysics Spectroscopic Survey (GCLASS) GMOS-S 9.50
Execution Status active Dates Taken:
Completion Status:
0%
GS Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2011B-Q-73 Angeloni CL Resolving Symbiotic Nebulae in the Magellanic Clouds: a GMOS survey GMOS-S 4.00
Execution Status complete Dates Taken:
20111106 20111117 20111118
Completion Status:
100%
GS-2011B-Q-74 Artigau CA PSYM-wide: a search for wide-separation planetary companions to low-mass stars GMOS-S 22.00
Execution Status complete Dates Taken:
20110804 20110905 20110916 20110918 20110919 20110921 20110922 20110923 20111005 20111006 20111007 20111008 20111009 20111010 20111011 20111018
Completion Status:
100%
GS-2011B-Q-75 Bian US Rest-frame UV Spectra of the most UV luminous Lyman Break Galaxies at $z\sim3$ GMOS-S 15.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-76 Chapman UK GMOS Followup of Thermal Upturn AGN/HyLIRGs from the SPT survey GMOS-S 20.00
Execution Status Dates Taken:
Completion Status:
0%
GS-2011B-Q-77 Chhetri AU Search for Gravitational Lenses in the Southern Hemisphere GMOS-S 9.50
Execution Status active / SToO Dates Taken:
20111007 20111023 20111101 20111107 20111201 20111226
Completion Status:
50%
GS-2011B-Q-78 Couch US/AU Dynamical masses of superdense massive galaxies in the local universe GMOS-S 30.00
Execution Status active Dates Taken:
20111202 20111203 20111222 20111223 20111224 20111229 20111230 20111231 20120102 20120103 20120125 20120128 20120130
Completion Status:
66%
GS-2011B-Q-79 Goad UK Toward a census of BAL variability GMOS-S 22.10
Execution Status complete Dates Taken:
20110902 20110903 20110916 20110922 20110923 20110926 20111002 20111003 20111018 20111019 20111020 20111030 20111101 20111201 20111205 20111228 20111230 20120117 20120120 20120127 20120128 20120131 20120201 20120204 20120205 20120224 20120226 20120227 20120228
Completion Status:
100%
GS-2011B-Q-80 Koss US Searching for Compton-Thick Dual AGN In Extremely Close Mergers GMOS-S 4.90
Execution Status complete Dates Taken:
20110830 20110901 20110903 20110916 20110924 20111007 20120124 20120130
Completion Status:
100%
GS-2011B-Q-81 Levato AR The nature and evolutionary status of the B[e] candidates of the LMC GMOS-S 2.20
Execution Status complete Dates Taken:
20110910 20111008 20111031 20111102 20120216
Completion Status:
100%
GS-2011B-Q-82 More CA Study of SL2S galaxy groups: mass distribution and concentration-mass relation GMOS-S 15.00
Execution Status Dates Taken:
20110808 20110826 20110827 20110828 20110829 20110903 20110905 20110917 20111007 20111117 20111204
Completion Status:
19%
GS-2011B-Q-83 Richtler CL The dark halos of isolated elliptical galaxies GMOS-S 13.85
Execution Status active Dates Taken:
20110825 20110905 20111122 20111228
Completion Status:
6%
GS-2011B-Q-84 Rodgers GS Targeting Southern Hemisphere Objects with T-ReCS TReCS 16.70
Execution Status active Dates Taken:
20110721 20110722 20110723 20110726 20110908 20110911 20110914 20110916 20120921 20120925 20120929 20121005 20121030
Completion Status:
87%
GS-2011B-Q-85 Salinas CL/AU Galactic taphonomy: kinematics, stellar populations and dark matter content of fossil groups GMOS-S 16.50
Execution Status active Dates Taken:
20111203
Completion Status:
2%
GS-2011B-Q-86 Schiavon GS Probing the Nature of LINER emission from Early-type Galaxies GMOS-S 4.00
Execution Status complete Dates Taken:
20120124 20120127 20120128
Completion Status:
100%
GS-2011B-Q-87 Scott US Galaxies and AGN in the Field of the UV Bright QSO HE2347-4342 GMOS-S 17.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-88 Telesco US Resolving an Asteroid Belt in a Multi-Planet System TReCS 5.60
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-89 Urrutia BR Stars outside galaxies: HII regions in two shell galaxies with HI tidal debris. GMOS-S 6.00
Execution Status active Dates Taken:
Completion Status:
0%
GS-2011B-Q-90 Zijlstra UK [WR] star in a close binary system GMOS-S 2.50
Execution Status complete Dates Taken:
20111231 20120117
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 2 Dec 2013 18:19:32 GMT