[Mayan calendar]

Queue Summary : Semester 2013A GN

The queues shown in the tables below summarise the programs that have been awarded time on GN. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2013A-DD-1 Kreidberg DD The Abundance of Water in the Atmosphere of the Super-Earth Archetype GJ 1214b GMOS / GMOS-S 15.00
Execution Status: Dates Taken:
20130406 20130409 20130427 20130517 20130605 20130613 20130614 20130615 20130616 20130623 20130713
Completion Status:
74%
GN-2013A-DD-2 Burningham GS The first substellar member of the Galactic Halo GNIRS 2.84
Execution Status: complete Dates Taken:
20130405 20130406 20130412 20130413
Completion Status:
100%
GN-2013A-DD-3 Luhman DD Spectroscopy of a Candidate for the First Halo T Dwarf GNIRS / NIRI 0.75
Execution Status: complete Dates Taken:
20130418
Completion Status:
100%
GN-2013A-DD-4 Hinkle DD Spectroscopy of the debris cloud around Sakurai's object GNIRS 1.00
Execution Status: complete Dates Taken:
20130614
Completion Status:
100%
GN-2013A-DD-5 Mechtley DD K-band AO Imaging of a z=5.85 Quasar Host NIRI+AltairLGS 3.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-1 Walsh US Studying the Black Hole in the Compact, High-Dispersion Galaxy Mrk 1216 NIFS+AltairLGS 10.00 [r14A]
Execution Status: rollover Dates Taken:
20131218 20131221
Completion Status:
39%
GN-2013A-Q-2 Verbiscer US Mutual Event of Transneptunian Binary (79360) Sila-Nunam GMOS 9.30
Execution Status: complete Dates Taken:
20130214
Completion Status:
100%
GN-2013A-Q-3 Urata JP Spectral Typing of the Unusual Long and Luminous Optical Transient GMOS 7.50
Execution Status: complete / SToO Dates Taken:
20130309 20130310 20130312 20130319 20130415 20130503 20130521 20130607 20130713 20130715 20130716 20130717
Completion Status:
100%
GN-2013A-Q-4 Tucker AU/US Catching Supernovae in the Act with KISS (Kepler International Supernova Search) GMOS 12.60
Execution Status: SToO Dates Taken:
20130518 20130601 20130606 20130615 20130626 20130711
Completion Status:
66%
GN-2013A-Q-5 Tobin US Edge-on Disks Around the Youngest Protostars NIRI 9.10
Execution Status: Dates Taken:
20130512 20130513 20130514 20130712 20130713 20130714 20130715 20130719 20130720 20130721 20130723 20130817 20130818 20130819 20130827 20130828 20130904
Completion Status:
100%
GN-2013A-Q-6 Steiner BR The identification of a LMXB at 0.1 pc from the Milky Way nucleus NIFS+Altair 1.80
Execution Status: complete Dates Taken:
20130520 20130630 20130702 20130706 20130708
Completion Status:
100%
GN-2013A-Q-7 Seth US Testing IMF universality through the direct detection of low mass stars in starburst galaxies NIFS 18.00 [r14A]
Execution Status: rollover Dates Taken:
20130521 20130523 20130525 20140507 20140509
Completion Status:
17%
GN-2013A-Q-8 Sanmartim BR/US The Nature of Post-Starburst Quasars GMOS 14.00 [r14A]
Execution Status: complete / rollover Dates Taken:
20130408 20130415 20130417 20130505 20130507 20130508 20130509 20130512
Completion Status:
100%
GN-2013A-Q-9 Ross US Gas morpholigies and dyamics of SMGs; comparing the ionized and molecular gas NIFS 19.80 [r14A]
Execution Status: complete / rollover Dates Taken:
20130520 20130521 20130523 20130716 20130719 20130802 20140516 20140517 20140518 20140519 20140718 20140727 20140827 20140828 20140829
Completion Status:
100%
GN-2013A-Q-10 Roediger CA Constraining stellar populations and the initial mass function at red wavelengths GMOS 7.10
Execution Status: complete Dates Taken:
20130205 20130306 20130309 20130311 20130406 20130412 20130515 20130519 20130522
Completion Status:
100%
GN-2013A-Q-11 Perlmutter AU Supernovae In and Behind Galaxy Clusters: Developing the next stages of SN cosmology measurements GMOS 5.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GN-2013A-Q-12 Pellizza AR A galaxy cluster at redshift 2.15? GNIRS 5.10
Execution Status: complete Dates Taken:
20130215 20130217 20130226 20130301 20130302 20130403 20130413 20130421
Completion Status:
100%
GN-2013A-Q-13 Moskovitz US Characterization of spacecraft target asteroid 2002 GT GMOS / GNIRS / NIRI 6.25
Execution Status: complete Dates Taken:
20130522 20130524 20130613 20130619
Completion Status:
100%
GN-2013A-Q-14 Meech UH Carbon Dioxide in the Early Solar System GMOS 6.90
Execution Status: complete Dates Taken:
20130205 20130206 20130208 20130210 20130211 20130213 20130320 20130321 20130409 20130410 20130419 20130502 20130508 20130509
Completion Status:
100%
GN-2013A-Q-15 Mechtley US PSF Star Selection for HST Program 12974: UV-Faint Quasars at z=6 NIRI+AltairLGS 2.50 [r14A]
Execution Status: complete / rollover Dates Taken:
20130407 20130425 20130426 20130429
Completion Status:
100%
GN-2013A-Q-16 Mason BR/CA/US NIR spectroscopy of Palomar AGN GNIRS 12.00
Execution Status: complete Dates Taken:
20130121 20130202 20130204 20130209 20130212 20130215 20130505 20130522
Completion Status:
100%
GN-2013A-Q-17 Marois CA Identifying elusive damped Lyman alpha system galaxies with high contrast imaging. NIRI+AltairLGS 10.00 [r14A]
Execution Status: rollover Dates Taken:
20130426 20130427 20130620
Completion Status:
73%
GN-2013A-Q-18 Mann UH Understanding ultracool dwarfs: ages and metallicities GNIRS 11.00
Execution Status: complete Dates Taken:
20130203 20130210 20130216 20130403 20130410 20130427 20130428 20130507 20130508 20130510 20130511 20130512 20130625 20130817
Completion Status:
100%
GN-2013A-Q-19 Maksym BR/US A Candidate Tidal Disruption Flare in Abell 1795 GMOS 9.00
Execution Status: complete Dates Taken:
20130205 20130406 20130407 20130408 20130409 20130418 20130419
Completion Status:
100%
GN-2013A-Q-20 Magnier UH Rare Brown Dwarfs in the Solar Neighborhood from Pan-STARRS 1 GNIRS 17.50 [r14A]
Execution Status: complete / rollover Dates Taken:
20130204 20130301 20130320 20130430 20130501 20130512 20130513 20130522 20130604 20130606 20130607 20130615 20130626 20130628 20130630 20130701 20130704 20130708
Completion Status:
100%
GN-2013A-Q-21 Leggett US Observing Weather on Y Dwarfs NIRI 48.00 [r14A]
Execution Status: rollover Dates Taken:
20130502 20130510 20130514 20130717 20130823
Completion Status:
40%
GN-2013A-Q-22 Kilic US Gravitational Waves from the 12 minute Orbital Period Binary White Dwarf J0651+2844 GMOS 5.00 [r14A]
Execution Status: complete / rollover Dates Taken:
20130204 20130304 20130305
Completion Status:
100%
GN-2013A-Q-23 Kewley AU Resolving the Most Distant Spiral Galaxy at z=2.54 NIFS+AltairLGS 13.50 [r14A]
Execution Status: complete / rollover Dates Taken:
20130531 20130622 20130624 20130625 20131221 20140410 20140514 20140516 20140517
Completion Status:
100%
GN-2013A-Q-24 Kavelaars CA Resonance Filling: tracking KBOs near the 5:1 Neptune resonances GMOS 7.00
Execution Status: complete Dates Taken:
20130205 20130206 20130220 20130221 20130304 20130319 20130403 20130404 20130405 20130409 20130430 20130503 20130508 20130512 20130610 20130615 20130617 20130701 20130711 20130715
Completion Status:
100%
GN-2013A-Q-25 Jha US Adding to the Treasury: Spectroscopic Classification of High-Redshift Supernovae Discovered by HST (North) GMOS 11.20
Execution Status: complete / SToO Dates Taken:
20130207 20130219 20130606 20130607 20130608 20130609 20130703 20130704 20130705
Completion Status:
100%
GN-2013A-Q-26 Hinkle US Imaging the debris cloud around Sakurai's object NIRI+AltairLGS 1.00 [r14A]
Execution Status: complete / rollover Dates Taken:
20130422 20130425 20130426 20130427
Completion Status:
100%
GN-2013A-Q-27 Herbst US Planet Formation in the KH 15D Circumbinary Ring GNIRS 9.00 [r14A]
Execution Status: rollover Dates Taken:
20130206 20130217 20130220 20130403 20131107 20131225
Completion Status:
70%
GN-2013A-Q-28 Hall CA Searching for Binary Quasars via Narrow-line Redshifts for Quasars with Redshifted Broad Absorption Lines GNIRS / GNIRS+AltairLGS 9.90 [r14A]
Execution Status: rollover Dates Taken:
20130203 20130207 20130208 20130210 20130403 20130404 20130406 20130425 20130518 20130522 20130523 20130615 20130630 20131029
Completion Status:
87%
GN-2013A-Q-29 Grundy US Mutual Orbits and Masses of Kuiper Belt Binaries and Multiple Systems NIRI / NIRI+Altair / NIRI+AltairLGS 12.50
Execution Status: complete Dates Taken:
20130418 20130419 20130421 20130422 20130425 20130427 20130428 20130429 20130513 20130713 20130714 20130718 20130719 20130720 20130721 20130722
Completion Status:
100%
GN-2013A-Q-30 Goncalves BR Mapping the stellar mass distribution and dust extinction in extreme starbursts NIRI+AltairLGS 5.80
Execution Status: Dates Taken:
20130422 20130427 20130428
Completion Status:
51%
GN-2013A-Q-31 Gladstone CA Determining the nature of the brightest optical counterpart to an extreme ULX GMOS 3.40
Execution Status: complete Dates Taken:
20130301 20130319 20130403 20130404 20130406 20130410 20130503 20130606 20130626
Completion Status:
100%
GN-2013A-Q-32 Gezari US Transient Spectroscopic Signatures of Tidal Disruption Events GMOS 5.00
Execution Status: SToO Dates Taken:
20130415 20130504 20130712
Completion Status:
49%
GN-2013A-Q-33 Geballe GS Basic Physical Properties of the New H-Band DIBs GNIRS 10.00 [r14A]
Execution Status: complete / rollover Dates Taken:
20130405 20130407 20130408 20130411 20130424 20130428 20130501 20130510 20130521 20130523 20130601 20130602 20130605 20130606 20130607 20130610 20130612 20130624
Completion Status:
100%
GN-2013A-Q-34 Galicher CA Completing the follow-ups of the 300 stars of the International Deep Planet Survey (North) NIRI / NIRI+Altair 14.81 [r14A]
Execution Status: complete / rollover Dates Taken:
20130309 20130320 20130422 20130427 20130429 20130430 20130501 20130619 20130717 20130818
Completion Status:
100%
GN-2013A-Q-35 Foley US RAISIN: Tracers of Cosmic Expansion with SN Ia in the IR (North) GMOS 9.00
Execution Status: complete / SToO Dates Taken:
20130311 20130415 20130421 20130422 20130507 20130513 20130701 20130804
Completion Status:
100%
GN-2013A-Q-36 Escudero AR Globular clusters and the origin of S0 galaxies in low density environment GMOS 2.60
Execution Status: complete Dates Taken:
20130209 20130308 20130320
Completion Status:
100%
GN-2013A-Q-37 Dupke BR Measuring the distance to the most luminous intermediate-mass black hole candidate with Gemini GMOS 2.00
Execution Status: complete Dates Taken:
20130208 20130303
Completion Status:
100%
GN-2013A-Q-38 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (North) GMOS 15.00 [r14A]
Execution Status: complete / rollover Dates Taken:
20130226 20130228 20130301 20130318 20130319 20130322 20130409 20130410
Completion Status:
100%
GN-2013A-Q-39 Cucchiara AU/US Exploring the first stars with rapid GRB follow-up observations (North) GMOS / GNIRS / NIRI 14.40
Execution Status: complete / RToO Dates Taken:
20130307 20130327 20130427 20130505 20130511 20130520 20130604 20130605 20130607 20130611 20130625 20130717
Completion Status:
100%
GN-2013A-Q-40 Crenshaw US NIFS Observations of the Seyfert 1 Galaxy Mrk 509: A Minor Merger Caught in the Act of Fueling the AGN? NIFS+Altair 6.80 [r14A]
Execution Status: complete / rollover Dates Taken:
20130530 20130531 20130624 20130703 20130706 20130707 20130708
Completion Status:
100%
GN-2013A-Q-41 Cenko CA Probing the Central Black Holes of Distant, Quiescent Galaxies via Tidal Disruption Flares (North) GMOS 1.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GN-2013A-Q-42 Caso AR The globular cluster systems of NGC 3610 and NGC 3613 GMOS 4.10
Execution Status: complete Dates Taken:
20130210 20130213 20130308
Completion Status:
100%
GN-2013A-Q-43 Cami CA A survey of near-IR DIBs. GNIRS / GNIRS+AltairLGS 16.00
Execution Status: complete Dates Taken:
20130409 20130410 20130424 20130427 20130501 20130509 20130512 20130517 20130521 20130523 20130524 20130525 20130527 20130612 20130613 20130614 20130615 20130617 20130618 20130620 20130621 20130705 20130707 20130808
Completion Status:
100%
GN-2013A-Q-44 Brodwin US The Massive Distant Clusters of Wise Survey (MaDCoWS) GMOS 29.40 [r14A]
Execution Status: rollover Dates Taken:
20130212 20130220 20130307 20130310 20130331 20130404 20130407 20130409 20130412 20130418 20130419 20130420 20130509 20130512 20130513 20130624 20130625 20130626 20130627 20130630 20130701 20130702 20130713 20130714 20130717 20140225 20140307 20140507
Completion Status:
97%
GN Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2013A-Q-45 Zhou AU Solving the Mystery of Inflated Brown Dwarfs NIRI 4.70
Execution Status: complete Dates Taken:
20130310
Completion Status:
100%
GN-2013A-Q-46 Young US Feedback in 3C 277.3 GMOS 7.00
Execution Status: complete Dates Taken:
20130705 20130706 20130707 20130708 20130709 20130711 20130712
Completion Status:
100%
GN-2013A-Q-47 Syphers US Finding an Accurate Redshift for a Unique He II Quasar GNIRS 0.70
Execution Status: complete Dates Taken:
20130510
Completion Status:
100%
GN-2013A-Q-48 Storchi-Bergmann BR Feeding and feedback in a hard X-ray sample of Active Galactic Nuclei NIFS+AltairLGS 7.50
Execution Status: complete Dates Taken:
20130621 20130624 20130626 20130718 20130719 20130720
Completion Status:
100%
GN-2013A-Q-49 Scharwaechter AU AGN feedback: The warmest molecular gas in the multi-phase outflow in 4C 12.50 NIFS+AltairLGS 4.50
Execution Status: Dates Taken:
20130527 20130628 20130629
Completion Status:
5%
GN-2013A-Q-50 Scarano Jr BR Radial Metallicity Distribution at Corotation Radius of Spiral Galaxies. GMOS 7.40
Execution Status: complete Dates Taken:
20130206 20130416 20130504 20130508 20130509 20130510 20130513 20130514
Completion Status:
100%
GN-2013A-Q-51 Rupke US QSO Feedback in Action: Ionization and Dust in the Wind GMOS 10.00
Execution Status: complete Dates Taken:
20130416 20130615 20130616 20130617 20130618
Completion Status:
100%
GN-2013A-Q-52 Roe US Titan's Methane Weather post-Equinox: \\ Seasonal climate change and large storm systems (North) NIFS+Altair / NIRI+Altair 8.00
Execution Status: complete / SToO Dates Taken:
20130424 20130612 20130613 20130614 20130615 20130616 20130617 20130618 20130712 20130713 20130714 20130715 20130716 20130717 20130718 20130719 20130720 20130721
Completion Status:
100%
GN-2013A-Q-53 Reynolds US The Mass of the Black Hole in the Galactic Microquasar GRS 1915+105 NIFS 20.00
Execution Status: Dates Taken:
20130622 20130623 20130627 20130630 20130701 20130703 20130705 20130706 20130710 20130715 20130718
Completion Status:
46%
GN-2013A-Q-54 Quinn US Close visual companions to transiting exoplanet host stars NIRI+Altair 12.30
Execution Status: complete Dates Taken:
20130309 20130311 20130319 20130320 20130322 20130404 20130405 20130406 20130409 20130416 20130417 20130418 20130428 20130429 20130430 20130501 20130507 20130509 20130514 20130616 20130617 20130713 20130714 20130716
Completion Status:
100%
GN-2013A-Q-55 Najarro GS Metallicity in the Quintuplet Cluster and the Galactic Center: Evidence for a top-heavy star formation history? GNIRS 5.00
Execution Status: Dates Taken:
20130708 20130808
Completion Status:
44%
GN-2013A-Q-56 Monteiro-Oliveira BR Line-of-sight structures in the merging cluster A2034 GMOS 3.80
Execution Status: complete Dates Taken:
20130206 20130209 20130311 20130406 20130407 20130408 20130411 20130429 20130503
Completion Status:
100%
GN-2013A-Q-57 McGregor AU Turbulence as the Star Formation Inhibitor in Radio Galaxies NIFS+AltairLGS 6.00
Execution Status: Dates Taken:
20130626 20130629
Completion Status:
25%
GN-2013A-Q-58 McConnell UH Black Hole versus Galaxy Growth in Different Cosmic Environments NIFS+Altair / NIFS+AltairLGS 24.00
Execution Status: Dates Taken:
20130226 20130304 20130524 20130527 20130530 20130531 20130622 20130623 20130625
Completion Status:
40%
GN-2013A-Q-59 Marchesini US Revealing the Monsters: GNIRS Spectroscopy of Ultra-Massive Galaxies at 1.5$<$z$<$3.0 GNIRS 28.00
Execution Status: Dates Taken:
20130307 20130519 20130521 20130522 20130523 20131216 20131217 20131218
Completion Status:
30%
GN-2013A-Q-60 Lützgendorf AU Testing Black Hole Scaling Relations by Measurements of the SMBH in the Brightest Cluster Galaxy IC 1101 GMOS 7.00
Execution Status: complete Dates Taken:
20130618 20130622 20130715 20130716 20130717 20130718 20130719 20140308
Completion Status:
100%
GN-2013A-Q-61 Lena US Mapping sub-kpc gas flows in a sample of nearby, hard X-ray selected AGNs. GMOS 10.30
Execution Status: Dates Taken:
20130221 20130321 20130415 20130417 20130418 20130504 20130521 20130605 20130703 20130704
Completion Status:
100%
GN-2013A-Q-62 Lemoine-Busserolle GS NIFS Observations of Turbulent Disks at 0.8<z<1.4: A Pilot Project Studying Disk Assembly NIFS+AltairLGS 8.30
Execution Status: complete Dates Taken:
20130523 20130527 20130530 20130531 20130621 20130622 20130624 20130626
Completion Status:
100%
GN-2013A-Q-63 Leggett GS/US Near-Infrared Characterization of Y Dwarfs NIRI 9.80
Execution Status: complete Dates Taken:
20130112 20130308 20130309 20130314 20130404 20130421 20130508 20130511 20130716 20130805
Completion Status:
100%
GN-2013A-Q-64 Kepler AR/BR/GS Are all high mass white dwarf stars magnetic? GMOS 10.00
Execution Status: complete Dates Taken:
20130118 20130121 20130122 20130202 20130211 20130212 20130303 20130408 20130412 20130510
Completion Status:
100%
GN-2013A-Q-65 Jorgensen GS/US RDCS J0848+4453: Stellar populations in a z=1.27 galaxy cluster GMOS 26.00
Execution Status: Dates Taken:
20121228 20130103 20130201 20130309 20130320 20130403 20130406 20130407 20130416 20130430 20130514 20130515 20130518 20130524 20130525 20130529 20130604
Completion Status:
61%
GN-2013A-Q-66 Jofr� AR Planet-metallicity correlation in M dwarf stars GNIRS 3.50
Execution Status: complete Dates Taken:
20130208 20130304 20130307 20130320 20130405 20130406 20130412 20130504 20130523 20130606
Completion Status:
100%
GN-2013A-Q-67 Hsieh UH Target-of-Opportunity Confirmation of Sublimation in Main-Belt Comets GMOS 3.00
Execution Status: SToO Dates Taken:
Completion Status:
0%
GN-2013A-Q-68 Howell US Early-time observations of Type Ia supernovae to reveal progenitor material (North) GMOS 10.00
Execution Status: SToO Dates Taken:
20130308 20130321 20130327 20130404 20130406 20130407 20130409 20130411 20130414 20130417 20130422
Completion Status:
91%
GN-2013A-Q-69 Grundy US Mutual Orbits and Masses of Kuiper Belt Binaries and Multiple Systems NIRI / NIRI+Altair / NIRI+AltairLGS 12.50
Execution Status: Dates Taken:
Completion Status:
21%
GN-2013A-Q-70 Flagey US Hunting for missing massive stars in the Galaxy GNIRS 13.80
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-71 Ferrero AR A High Resolution Near Infrared Spectral Atlas of O stars with Gemini GNIRS 2.37
Execution Status: complete Dates Taken:
20130408 20130410 20130418 20130419 20130421 20130422 20130509
Completion Status:
100%
GN-2013A-Q-72 Fassnacht US Quantifying the line-of-sight mass distributions to time-delay lenses NIRI 1.20
Execution Status: complete Dates Taken:
20130503
Completion Status:
100%
GN-2013A-Q-73 Farrah CA/US Deep Near-Infrared Imaging of Extreme Starburst Galaxies at 3<z<7 NIRI 27.80
Execution Status: Dates Taken:
20130418 20130714 20130715 20130720 20130812 20130814 20130817
Completion Status:
24%
GN-2013A-Q-74 Dhital US The Extremely Extreme: Searching for Companions in Wide M-dwarf Binaries NIRI+AltairLGS 16.00
Execution Status: Dates Taken:
20130619 20130620 20130720
Completion Status:
26%
GN-2013A-Q-75 Desert US Comparative Exoplanetology of Hot-Jupiter Prototypes (North) GMOS 15.00
Execution Status: Dates Taken:
20130426 20130427 20130429 20130517 20130518 20130520 20130521 20130612 20130613 20130614 20130621 20130622 20130624 20130625 20130701 20130702 20130708 20130801 20140807 20140811
Completion Status:
3%
GN-2013A-Q-76 Cote CA/US The Origin of Low-Mass, Early-Type Galaxies: A GMOS/IFU Survey of the Virgo Cluster (North) GMOS 30.20
Execution Status: Dates Taken:
20130117 20130205 20130210 20130211 20130212 20130306 20130311 20130510 20130511 20130602 20130604 20130605 20130606 20130705 20130709 20130710 20130711
Completion Status:
93%
GN-2013A-Q-77 Cobb AU/US Exceptional Swift and Fermi GRBs: Gemini Standard Targets of Opportunity (North) GMOS / GNIRS / NIRI 5.50
Execution Status: complete / SToO Dates Taken:
20130320 20130516 20130517
Completion Status:
100%
GN-2013A-Q-78 Cidale AR Revealing the mass-loss history of evolved massive stars GNIRS / GNIRS+Altair / GNIRS+AltairLGS 6.10
Execution Status: Dates Taken:
20130707 20130711
Completion Status:
9%
GN-2013A-Q-79 Chornock US Unveiling the Explosion Physics of Nature's Most Luminous Supernovae (North) GMOS 8.00
Execution Status: complete / SToO Dates Taken:
20130304 20130305 20130411 20130413 20130430 20130716
Completion Status:
100%
GN-2013A-Q-80 Brown US First detection of Kozai evolution in an astrophysical system NIRI+AltairLGS 4.00
Execution Status: Dates Taken:
20130422 20130427
Completion Status:
17%
GN-2013A-Q-81 Bresolin UH Metals in the star-forming extended disks of early-type galaxies GMOS 4.30
Execution Status: complete Dates Taken:
20130206 20130208 20130301 20130307 20130319 20130412 20130414 20130501 20130503 20130504
Completion Status:
100%
GN-2013A-Q-82 Bian US Gas Kinematics in the Most Luminous Lyman Break Galaxies at $Z\sim3$ NIFS / NIFS+AltairLGS 20.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-83 Beck US Revealing the Structure of Gas Mass Accretion in "The Ringworld" - GG Tau A GNIRS+Altair / NIFS+Altair / NIRI 7.20
Execution Status: Dates Taken:
20130208 20130212 20130217 20130218 20130304 20130403 20130404
Completion Status:
39%
GN-2013A-Q-84 Balogh CA Dead and dying satellite galaxies at z=1 GMOS 51.00
Execution Status: complete Dates Taken:
20130228 20130304 20130305 20130309 20130311 20130312 20130319 20130407 20130408 20130409 20130410 20130415 20130505 20130507 20130508 20130509 20130510 20130512 20130514 20130515 20130516 20130517 20130518 20130608 20130609 20130612 20130614 20130702 20130703 20130704 20130706 20130707 20130708 20130714 20130804 20130807 20130811
Completion Status:
100%
GN Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GN-2013A-Q-85 Young US Feedback in 3C 277.3 GMOS 7.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-86 Wooden US Searching for organic nano-grains using GNIRS spectra of the naked eye comet C/2011 L4 (PanStarrs) GNIRS / GNIRS+Altair 5.00
Execution Status: complete Dates Taken:
20130516 20130517 20130518 20130625 20130627 20130628
Completion Status:
100%
GN-2013A-Q-87 Urrutia-Viscarra BR The structure, kinematics and nature of the TDG in the merger remnant NGC4656/7 GMOS 5.90
Execution Status: complete Dates Taken:
20130304 20130306 20130511 20130514 20130515 20130601 20130602
Completion Status:
100%
GN-2013A-Q-88 Thanjavur CA Geometric distance of M71 from radial velocity and proper motion dispersions of matched cluster members. GMOS 4.40
Execution Status: complete Dates Taken:
20130326 20130605 20130615 20130617 20130618 20130620 20130704 20130707 20130714 20130715 20130721
Completion Status:
100%
GN-2013A-Q-89 Szkody US Uncovering the faintest cataclysmic variables in the SDSS footprint GMOS 13.10
Execution Status: complete Dates Taken:
20130207 20130211 20130311 20130315 20130319 20130408 20130411 20130412 20130415 20130510 20130519 20130601 20130604
Completion Status:
100%
GN-2013A-Q-90 Stovall US The Hunt for the Companion of PSR J0636+51 GMOS / NIRI 6.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-91 Sonnenfeld US The mass assembly of early-type galaxies with SL2S GNIRS 7.60
Execution Status: complete Dates Taken:
20130321 20130322 20130323 20130324 20130326
Completion Status:
100%
GN-2013A-Q-92 Sales BR/US Mapping the Inner Structure of OH Megamaser Merger Galaxies GMOS 12.40
Execution Status: Dates Taken:
20130515 20130516 20130525 20130802
Completion Status:
22%
GN-2013A-Q-93 Rembold BR Multicolor photometry of the cluster of galaxies DEEP2 VDM 33 GMOS 2.10
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-94 Pracy AU Obtaining the Cosmic Gas Mass Density from 21-cm in MgII Absorption Systems GMOS 18.00
Execution Status: Dates Taken:
20130702 20130713
Completion Status:
29%
GN-2013A-Q-95 Pike CA Color in the Kuiper Belt: Size vs Class GMOS / NIRI 26.10
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-96 Patience US Confirmation of Substellar and Degenerate Companion Candidates NIRI+Altair 1.00
Execution Status: complete Dates Taken:
20130417 20130507 20130713
Completion Status:
100%
GN-2013A-Q-97 Oka US Morphology and Kinematics of the Galactic Center's Central Molecular Zone and Expanding Molecular Ring GNIRS 10.00
Execution Status: complete Dates Taken:
20130627 20130628 20130629 20130705 20130709 20130710
Completion Status:
100%
GN-2013A-Q-98 Oio AR Feedback in Narrow-Line Seyfert 1 Galaxies: unveiling the nuclear complex kinematics and star formation in SDSSJ093643.13+505249.6 GMOS 6.70
Execution Status: complete Dates Taken:
20130217 20130302 20130303 20130304
Completion Status:
100%
GN-2013A-Q-99 Najarro US Metallicity in the Quintuplet Cluster and the Galactic Center: Evidence for a top-heavy star formation history? GNIRS 9.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-100 Liu US Quasar Feedback at the Peak of Galaxy Formation Epoch GMOS 10.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-101 Kaplan US Understanding the Strange Metal-Rich Companion to PSR J1816 GMOS 9.00
Execution Status: Dates Taken:
20130627 20130628 20130629 20130714 20130721 20130813 20130822
Completion Status:
58%
GN-2013A-Q-102 Hsieh UH Characterization of the Nuclei and Active Behavior of Main-Belt Comets GMOS 18.00
Execution Status: complete Dates Taken:
20130303 20130311 20130321 20130408 20130411 20130412 20130413 20130414 20130415 20130417 20130418 20130604 20130614 20130627 20130628 20130629 20130702 20130709 20130710 20130712 20130815 20130816
Completion Status:
100%
GN-2013A-Q-103 Ho UH Shocks and metallicity gradients in galaxy-scale lensed galaxies GMOS 6.00
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-104 Hall CA/US Monitoring Emergent Absorption Troughs in Quasars (North) GMOS 14.10
Execution Status: complete Dates Taken:
20130204 20130205 20130211 20130212 20130215 20130304 20130306 20130308 20130406 20130407 20130519 20130604 20130611 20130613
Completion Status:
100%
GN-2013A-Q-105 Gamen AR Searching for the progenitors of two galactic supershells (North) GMOS 4.20
Execution Status: complete Dates Taken:
20130311 20130602 20130608 20130627 20130628 20130629 20130702 20130707 20130708 20130709
Completion Status:
100%
GN-2013A-Q-106 Gagne CA Spectroscopic confirmation of very low-mass stars and brown dwarf candidates in nearby, young moving groups GMOS 10.00
Execution Status: complete Dates Taken:
20130212 20130213 20130302 20130303 20130304 20130305 20130308 20130315 20130415 20130602 20130608 20130611
Completion Status:
100%
GN-2013A-Q-107 Emery US Near-Infrared photometry of KBOs and Centaurs in support of Spitzer space telescope data. NIRI 14.00
Execution Status: Dates Taken:
20130406 20130421 20130422 20130426 20130510 20130511 20130616 20130712 20130713
Completion Status:
31%
GN-2013A-Q-108 Cote GS The Origin of Low-Mass, Early-Type Galaxies: A GMOS/IFU Survey of the Virgo Cluster GMOS 6.00
Execution Status: complete Dates Taken:
20130118 20130122 20130204 20130215 20130218 20130302 20130303 20130305 20130311 20130312
Completion Status:
100%
GN-2013A-Q-109 Cidale AR Developing a near infrared diagnostic for magnetism in hot, massive stars GNIRS / GNIRS+Altair 1.90
Execution Status: Dates Taken:
20130705 20130707 20130708
Completion Status:
65%
GN-2013A-Q-110 Bennert US Exploring the Origin of the BH Mass Scaling Relations NIRI 17.10
Execution Status: Dates Taken:
Completion Status:
0%
GN-2013A-Q-111 Atlee US A Spectroscopic Study of the Contribution of TP-AGB Stars to Integrated NIR Starlight GNIRS 11.00
Execution Status: complete Dates Taken:
20130216 20130217 20130220 20130221 20130301 20130302 20130303 20130607
Completion Status:
100%
GN-2013A-Q-112 Atlee US Extinction and Stellar Populations of Star Formation-Dominated Dust-Obscured Galaxies GNIRS 12.00
Execution Status: complete Dates Taken:
20130322 20130323 20130327 20130329 20130428 20130429 20130430 20130521 20130522 20130525
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:47:11 GMT