You are here

Podcasts

Observing with Gemini

Unless you are an astronomer, you mightn't have ever considered how we make observations on a telescope like Gemini. Even our regular users might learn something from this new Gemini Observatory video that explains the whole process; from submitting a proposal, to the transmitting of data, to an archive across the globe. Watch this English language video (6 min) and see how it all works! A menos que seas un astrónomo, no podrías imaginar cómo hacemos las observaciones en un telescopio como Gemini.

GS 2010 Shutdown & Mirror Re-coating

GS 2010 Shutdown & Mirror Re-coating/Shutdown y Recubrimiento de Espejo en Gemini Sur 2010 Parts one and two of the 2010 Gemini South shutdown podcast video. In September/October 2010 the Gemini South telescope underwent a 28-day engineering/maintenance shutdown. During that period the primary mirror was washed, stripped, re-coated, then reinstalled in the telescope. ... Capítulos 1 y 2 del podcast del Shutdown de Gemini Sur en 2010. Durante los meses de septiembre y octubre de 2010, el telescopio de Gemini Sur fue sometido a 28 días de mantenimiento de ingeniería.

Gemini South Laser Arrival Podcast

Arrival of the Laser for the Gemini Multi-Conjugate Adaptive Optics Systems (GeMS), at Cerro Pachón in Chile. Tras largos 10 años de trabajo arduo, personal del Telescopio de Gemini Sur recibe el láser del Sistema Multi-Conjugado de Óptica Adaptiva (MCAO), para iniciar el proceso de instalación en el telescopio. Una vez en operaciones, este láser va a crear 5 estrellas guía en la capa de sodio de la atmósfera para lograr registrar imágenes astronómicas con una definición sin precedentes.