
International Gemini Observatory/NOIRLab/NSF/AURA
Preparation for mirror coating
The 8.1 meter primary mirror suspended on the 4th floor, before descending to the stripping/coating area on the first floor of the observatory building.
International Gemini Observatory/NOIRLab/NSF/AURA
The 8.1 meter primary mirror suspended on the 4th floor, before descending to the stripping/coating area on the first floor of the observatory building.