Preparing for restart at SOAR

CTIO/NOIRLab/SOAR/Carlos Corco/NSF/AURA

Preparing for restart at SOAR

CTIO detector engineer Marco Bonati is monitoring the vacuum on SOAR’s Spartan infrared camera, getting ready to start cooling with liquid nitrogen. The optics and detector are cooled to liquid nitrogen temperature, but first the volume surrounding the cooled structure needs to be evacuated to provide insulation from ambient temperature.

About the Image

ID: noirlab2026b
Type: Photographic

About the Object

Name:

Image Formats

Zoomable

Zoomable