Semester 2022B - GS DDT Programs
The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.
The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).
The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).
GS Director's Discretionary Time Queue Band 1 | ||||||
Ref # | PI | Partner | Title | Instrument | Hours allocated |
|
GS-2022B-DD-101 | Andrews | DD | Simultaneous Gemini and JWST spectroscopy of SN 2021aefx | Flamingos2 | 2.10 | |
Execution Status: complete |
Dates Taken: 20221020 20221021 |
Completion Status:
100%
|
||||
GS-2022B-DD-102 | Mura-Guzmán | DD | Fluorine as a diagnostic tool for Population III Supernova properties. | Visitor | 2.20 | |
Execution Status: complete |
Dates Taken: 20221018 |
Completion Status:
100%
|
||||
GS-2022B-DD-103 | Rastinejad | DD | Observing a Once-in-a-Millenium Gamma-ray Burst with Gemini | Flamingos2 / GMOS / GMOS-S / GNIRS | 1.50 | |
Execution Status: complete / RToO |
Dates Taken: 20221014 20221027 20221030 20221031 20221105 |
Completion Status:
100%
|
||||
GS-2022B-DD-104 | O'Connor | DD | Unveiling heavy elements from the ultra-long GRB 221009A | Flamingos2 / GMOS / NIRI | 1.50 | |
Execution Status: complete / RToO |
Dates Taken: 20221014 20221027 20221104 |
Completion Status:
100%
|
||||
GS-2022B-DD-105 | Thanjavur | DD | Spectroscopic characterization of the best sub-parsec super-massive binary black hole candidate with Gemini GMOS | GMOS / GMOS-S | 2.20 | |
Execution Status: complete |
Dates Taken: 20221114 20221115 |
Completion Status:
100%
|
||||
GS-2022B-DD-106 | Chandler | DD | Investigating a Vanishing Active Centaur | GMOS-S | 2.00 | |
Execution Status: complete |
Dates Taken: 20221128 20221219 20221223 |
Completion Status:
100%
|
||||
GS-2022B-DD-107 | Kilic | DD | The Most Massive Pulsating White Dwarf | GMOS-S | 1.50 | |
Execution Status: complete |
Dates Taken: 20221226 20221227 |
Completion Status:
100%
|
||||
GS-2022B-DD-108 | Meyer | DD | Measuring the mass of the SMBHs powering two lensed z~6 quasars | Flamingos2 | 3.50 | |
Execution Status: |
Dates Taken: 20230120 |
Completion Status:
58%
|
||||
GS Director's Discretionary Time Queue Band 2 | ||||||
Ref # | PI | Partner | Title | Instrument | Hours allocated |
|
GS-2022B-DD-201 | Azzollini | DD | Scrutinizing extragalactic neutrino factories with the Gemini Multi-Object Spectrograph GMOS-S | GMOS-S | 7.40 | |
Execution Status: complete |
Dates Taken: 20221001 20221002 20221012 20221116 20221117 20221118 20221119 20221120 20221121 20221123 |
Completion Status:
100%
|
||||
GS-2022B-DD-202 | van Dokkum | DD | Confirmation of a runaway supermassive black hole system | GMOS-S | 3.50 | |
Execution Status: complete |
Dates Taken: 20221115 20221118 20221126 20221128 20221129 20221202 20221208 20221218 20221219 |
Completion Status:
100%
|