Semester 2023A - GS DDT Programs
The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.
The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).
The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).
GS Director's Discretionary Time Queue Band 1 | ||||||
Ref # | PI | Partner | Title | Instrument | Hours allocated |
|
GS-2023A-DD-102 | Chrimes | DD | Comprehensive Chandra, Gemini, JVLA and HST observations of a fast blue optical transient | GMOS / GMOS-S | 5.00 | |
Execution Status: complete / RToO |
Dates Taken: 20230423 20230430 20230511 20230513 20230515 |
Completion Status:
100%
|
||||
GS-2023A-DD-103 | Pacucci | DD | Confirming the Detection of a SMBH in the Milky Way Satellite Leo I with Gemini South | GMOS-S | 5.87 | |
Execution Status: |
Dates Taken: 20230322 20230405 |
Completion Status:
0%
|
||||
GS-2023A-DD-104 | O'Connor | DD | The distance and energetics of the second brightest GRB of all time | GMOS-S | 2.83 | |
Execution Status: complete |
Dates Taken: 20230310 20230311 20230315 20230316 |
Completion Status:
100%
|
||||
GS-2023A-DD-105 | Levan | DD | The near-IR counterpart to GRB 230307A | Flamingos2 | 2.20 | |
Execution Status: complete / RToO |
Dates Taken: 20230316 20230318 20230319 20230323 |
Completion Status:
100%
|
||||
GS-2023A-DD-106 | Dichiara | DD | Searching for the SN associated with the extremely bright GRB 230307A | Flamingos2 / GMOS-S | 3.61 | |
Execution Status: complete / RToO |
Dates Taken: 20230323 20230325 |
Completion Status:
100%
|
||||
GS-2023A-DD-107 | Street | DD | Spectroscopic characterising of a nearby microlensing event | GMOS-S | 1.19 | |
Execution Status: complete |
Dates Taken: 20230330 20230401 20230501 |
Completion Status:
100%
|
||||
GS-2023A-DD-108 | Ighina | DD | Spectroscopic confirmation of a z~5.7 blazar | GMOS / GMOS-S | 2.00 | |
Execution Status: complete |
Dates Taken: 20230516 20230517 20230521 20230615 20230616 20230617 20230620 |
Completion Status:
100%
|
||||
GS-2023A-DD-109 | Castro Segura | DD | The interplay of winds and jets in black-hole X-ray binaries | Flamingos2 | 2.00 | |
Execution Status: complete |
Dates Taken: 20230606 |
Completion Status:
100%
|