Semester 2024A - GS DDT Programs
The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.
The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).
The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).
GS Director's Discretionary Time Queue Band 1 | ||||||
Ref # | PI | Partner | Title | Instrument | Hours allocated |
|
GS-2024A-DD-101 | Santana-Ros | DD | Multi-technique study of the extreme Atira 2021 PH27: Search for large-particle activity at aphelion | GMOS-S | 4.00 | |
Execution Status: complete |
Dates Taken: 20240301 20240303 20240304 20240305 20240306 20240309 20240310 20240311 |
Completion Status:
100%
|
||||
GS-2024A-DD-102 | Joffre | DD | Spectroscopic Identification of Galactic G-ray Transient | GMOS-S | 3.00 | |
Execution Status: complete |
Dates Taken: 20240407 20240408 |
Completion Status:
100%
|
||||
GS-2024A-DD-103 | Lee | DD | EC 53: A Unique Protostar Revealing Episodic Accretion Through JWST and Gemini/IGRINS Synergy | Visitor | 1.33 | |
Execution Status: complete |
Dates Taken: 20240417 20240419 |
Completion Status:
100%
|
||||
GS-2024A-DD-104 | O'Connor | DD | Unravelling the mystery of the fast X-ray transient EP240408A | Flamingos2 / GMOS-S | 4.13 | |
Execution Status: complete |
Dates Taken: 20240425 20240503 20240504 20240505 20240630 |
Completion Status:
100%
|
||||
GS-2024A-DD-105 | Chené | DD | Reveiling the nature of a precious new Wolf-Rayet binary system | GMOS-S | 1.00 | |
Execution Status: complete |
Dates Taken: 20240505 20240516 20240518 20240528 |
Completion Status:
100%
|
||||
GS-2024A-DD-106 | Kumar | UK | A Near-Infrared Search for Helium in Two Hydrogen-Poor Superluminous Supernovae | Flamingos2 / GNIRS | 6.46 | |
Execution Status: |
Dates Taken: 20240520 20240719 |
Completion Status:
42%
|
||||
GS-2024A-DD-107 | Santana-Ros | US | Last chance to characterize 1998 KY26 before Hayabusa2's rendezvous | GMOS-S | 2.00 | |
Execution Status: complete |
Dates Taken: 20240531 20240603 |
Completion Status:
100%
|
||||
GS-2024A-DD-108 | Santana-Ros | DD | First lightcurve and taxonomy of Atira asteroid 2021 PH27 after perihelion | GMOS-S | 4.00 | |
Execution Status: |
Dates Taken: 20240627 20240701 20240702 20240703 20240709 20240712 |
Completion Status:
92%
|
||||
GS-2024A-DD-109 | Hoffman | DD | Followup of Comet 2017T2 | GMOS-S | 0.23 | |
Execution Status: complete |
Dates Taken: 20240715 20240928 20240929 |
Completion Status:
100%
|
||||
GS Director's Discretionary Time Queue Band 2 | ||||||
Ref # | PI | Partner | Title | Instrument | Hours allocated |
|
GS-2024A-DD-201 | Smartt | US | A new type of explosive transient revealed by soft x-ray emission | GMOS-S | 3.00 | |
Execution Status: complete |
Dates Taken: 20240529 20240530 20240627 20240629 20240717 20240718 20240719 |
Completion Status:
100%
|