You are here

Queue Summary

Content owned by pablo.martin

Semester 2024B - GS FT Programs

The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).

Show queue summary for semester at Gemini

GS Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2024B-FT-101 Biswas CA Optical follow-up of the misaligned DDRG LEDA 884893: a binary AGN candidate GHOST 1.40
Execution Status: Dates Taken:
20240901
Completion Status:
97%
GS-2024B-FT-102 Mo US Uncovering SN Ia progenitors from an overlooked population of CSM interactors GMOS-S 1.64
Execution Status: Dates Taken:
20240825 20240826 20241012 20241024 20241026
Completion Status:
100%
GS-2024B-FT-103 Smith US Singing in the (iron) rain: Interrogating the Hypothesis of Fe Condsensation on an Ultra Hot Jupiter GHOST 8.00
Execution Status: Dates Taken:
20240929 20241030
Completion Status:
100%
GS-2024B-FT-104 Chené US What happened to NGC300 ULX-1? Flamingos2 / GMOS-S 0.97
Execution Status: complete Dates Taken:
20240905
Completion Status:
100%
GS-2024B-FT-105 Woodward US IR Spectroscopy of V745Sco - Catching A Recurrent Nova Between Eruptions Flamingos2 1.23
Execution Status: complete Dates Taken:
20240826 20241012 20241017
Completion Status:
100%
GS-2024B-FT-106 Breuval US Cepheid Light Curves in Nearby Galaxies: Gemini and HST jointly test the Hubble Tension GMOS-S 2.00
Execution Status: complete Dates Taken:
20240928 20241011 20241021 20241030 20241105 20241106
Completion Status:
100%
GS-2024B-FT-107 Lacy US Connecting the dots - spectroscopy of a radio-loud little red dot analog GMOS-S 2.00
Execution Status: complete Dates Taken:
20241001 20241002 20241004
Completion Status:
100%
GS-2024B-FT-108 LeBaron US Ultra-Late (>800d) NIR Photometry of a Peculiar Type Ic Supernova with Signatures of Dust Reprocessing Flamingos2 1.88
Execution Status: complete Dates Taken:
20241026
Completion Status:
100%
GS-2024B-FT-109 Breuval US Cepheid Light Curves in Nearby Galaxies: Gemini and HST jointly test the Hubble Tension GMOS-S 0.96
Execution Status: SToO Dates Taken:
20241105
Completion Status:
45%
GS Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2024B-FT-201 Muller US Constraining metallicity in the lowest luminosity FRB host galaxy discovered to date GMOS-S 2.60
Execution Status: Dates Taken:
Completion Status:
0%
GS-2024B-FT-202 Venn CA The C-19 Stellar Stream GHOST 2.36
Execution Status: complete Dates Taken:
20240901 20240907 20240908 20240923 20240927
Completion Status:
100%
GS-2024B-FT-203 Hartman US To be a Binary or Not to be a Binary: Confirming the Multiplicity Status of Potential HWO Targets Visitor 0.66
Execution Status: Dates Taken:
Completion Status:
0%
GS-2024B-FT-204 Medoff US Confirmation of two new dwarf galaxy satellites of NGC 55, discovered with the Dark Energy Camera GMOS-S 3.30
Execution Status: Dates Taken:
20241004 20241029
Completion Status:
80%
GS-2024B-FT-205 Petryk CA Measuring the ionization state in the ambient medium of the extraordinary supernova remnant RCW 86 GMOS-S 2.24
Execution Status: Dates Taken:
20240913
Completion Status:
0%
GS-2024B-FT-206 Cerny US Confirming a New Magellanic Satellite Candidate Identified Through Machine Learning GMOS-S 2.88
Execution Status: Dates Taken:
Completion Status:
0%
GS-2024B-FT-207 Boutsia US Testing the Big Bang Nucleosynthesis GHOST 3.00
Execution Status: Dates Taken:
20240901
Completion Status:
89%
GS-2024B-FT-208 Jones US Faint Local Volume Dwarfs Across All Environments GMOS-S 3.52
Execution Status: Dates Taken:
Completion Status:
0%
GS-2024B-FT-209 Kim US Photoevaporating Protoplanetary Disks in Orion's NGC 1977 in the Most Common UV Environment GMOS-S 3.48
Execution Status: Dates Taken:
20241109
Completion Status:
50%
GS-2024B-FT-210 Saffe AR Discovery of lambda Boo stars in open clusters GHOST 3.49
Execution Status: Dates Taken:
20241004 20241005 20241019 20241025 20241026
Completion Status:
60%
GS-2024B-FT-211 Kalari US Spectroscopic follow-up of the candidate luminous blue variable and potential SN progenitor in the low metallicity Large Magellanic Cloud GHOST 0.91
Execution Status: Dates Taken:
20241105 20241110
Completion Status:
100%
GS-2024B-FT-212 Massey US An Archetype of a Stripped Wolf-Rayet Binary GMOS-S 6.40
Execution Status: Dates Taken:
Completion Status:
0%
Queue Summary | Gemini Observatory

Error

The website encountered an unexpected error. Please try again later.