You are here

Queue Summary

Content owned by pablo.martin

Semester 2025A - GN FT Programs

The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).

Show queue summary for semester at Gemini

GN Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GN-2025A-FT-101 Welbanks US Dude, where's my methane?: Searching for the atmospheric imprints of chemical disequilibrium in a warm sub-Neptune IGRINS-2 3.95
Execution Status: Dates Taken:
20250307
Completion Status:
0%
GN-2025A-FT-102 Lopez US Time-Series Spectroscopy of The Ultra-short Period HW Vir J0522+1040 GMOS 1.77
Execution Status: complete Dates Taken:
20250205 20250206 20250208
Completion Status:
100%
GN-2025A-FT-103 Nyland US A Restarted Quasar Jet Triggered by a Cosmic Dance? GMOS 1.90
Execution Status: complete Dates Taken:
20250219 20250222 20250223
Completion Status:
100%
GN-2025A-FT-104 Farina US Confirming a quadruple AGN at z=3.16 GMOS 4.10
Execution Status: complete Dates Taken:
20250325 20250326 20250403
Completion Status:
100%
GN-2025A-FT-105 Yoon KR HI Disks in TXS 1033+026 GMOS 1.30
Execution Status: Dates Taken:
Completion Status:
0%
GN-2025A-FT-106 Lanzetta US The Superwind and Cap of M82 GMOS 1.87
Execution Status: complete Dates Taken:
20250328 20250329 20250331
Completion Status:
100%
GN-2025A-FT-107 Kanumalla US Unraveling the Formation History of a Saturn-Mass Exoplanet IGRINS-2 3.10
Execution Status: Dates Taken:
Completion Status:
0%
GN Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GN-2025A-FT-201 Kim KR Simultaneous Mapping of Gas Outflow and Star Formation Quenching in a Local Post-Starburst AGN GMOS 3.80
Execution Status: complete Dates Taken:
20250223 20250227 20250228 20250301 20250302
Completion Status:
100%
GN-2025A-FT-202 Choi CA Examining the Host Galaxy and the Central Supermassive Black Hole of a Windy Quasar using GNIRS IFU GNIRS 4.25
Execution Status: Dates Taken:
20250407 20250408 20250410
Completion Status:
98%
GN-2025A-FT-203 Wang KR Confirming the first Intermediate-Mass Black Hole Driving a Megaparsec Jet GMOS 1.67
Execution Status: complete Dates Taken:
20250305 20250323
Completion Status:
100%
GN-2025A-FT-204 Eduardo CA Exploring the Colors and Lightcurve of a Potential Contact Binary Trans-Neptunian Object GMOS 3.47
Execution Status: complete Dates Taken:
20250402 20250403 20250406
Completion Status:
100%
GN-2025A-FT-205 Roberts CA Confirming a Jellyfish Galaxy at Z>1 GMOS 6.39
Execution Status: Dates Taken:
20250302
Completion Status:
27%
GN-2025A-FT-206 Kuhn US Securing Spectroscopic Redshift for a Candidate High-redshift Spiral Galaxy GNIRS 3.15
Execution Status: Dates Taken:
Completion Status:
0%
GN-2025A-FT-207 Hall US Unveiling a Hidden Population of Tidal Disruption Events GMOS 1.57
Execution Status: SToO Dates Taken:
Completion Status:
0%
GN-2025A-FT-208 Smith CA Multi-Object Spectroscopy follow-up of an extremely faint dwarf galaxy candidate serendipitously discovered in Euclid GMOS 3.20
Execution Status: Dates Taken:
Completion Status:
0%
Queue Summary | Gemini Observatory

Error

The website encountered an unexpected error. Please try again later.