Semester 2024B - GS DDT Programs
The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.
The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).
The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).
GS Director's Discretionary Time Queue Band 1 | ||||||
Ref # | PI | Partner | Title | Instrument | Hours allocated |
|
GS-2024B-DD-101 | Howell | DD | Exoplanet Validation, Atmospheric characterization, and HWO mission support | Visitor | 10.00 | |
Execution Status: |
Dates Taken: 20240917 20240918 20240920 20240921 20241110 20241111 20241112 |
Completion Status:
78%
|
||||
GS-2024B-DD-102 | Breuval | DD | Cepheid Light Curves in Nearby Galaxies: Gemini and HST jointly test the Hubble Tension | GMOS-S | 1.05 | |
Execution Status: complete |
Dates Taken: 20240907 20240922 20240928 |
Completion Status:
100%
|
||||
GS-2024B-DD-103 | Lopes de Oliveira | DD | Tracing the Footsteps of a Potentially Supermassive White Dwarf | GMOS-S | 3.06 | |
Execution Status: complete |
Dates Taken: 20240827 20240828 20240830 |
Completion Status:
100%
|
||||
GS-2024B-DD-104 | Evans | DD | NIR spectroscopy of a recurrent nova in the LMC | Flamingos2 | 2.15 | |
Execution Status: complete |
Dates Taken: 20240824 |
Completion Status:
100%
|
||||
GS-2024B-DD-105 | Bachelet | DD | Zorro constraints on the planet's host detected in the microlensing event OGLE-2024-BLG-0034 Lb | Visitor | 1.00 | |
Execution Status: complete |
Dates Taken: 20240927 |
Completion Status:
100%
|
||||
GS-2024B-DD-106 | LeBaron | UK | Constraining NIR Emission in the Most Optically Luminous Fast Blue Optical Transient Ever Discovered | Flamingos2 | 3.24 | |
Execution Status: complete |
Dates Taken: 20241005 20241015 20241016 20241017 20241020 20241021 20241025 |
Completion Status:
100%
|
||||
GS-2024B-DD-107 | Howell | US | Structural Morphology of a Stellar Merger | Visitor | 1.14 | |
Execution Status: complete |
Dates Taken: 20241026 20241101 |
Completion Status:
100%
|
||||
GS-2024B-DD-108 | Rector | US | Gemini Legacy Imaging | GMOS / GMOS-S | 1.00 | |
Execution Status: |
Dates Taken: |
Completion Status:
0%
|