You are here

Queue Summary

Content owned by pablo.martin

Semester 2023B - GS FT Programs

The table below summarizes the Gemini queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each program are listed in the interactive 'snapshots' of the Observing Database (ODB).

Show queue summary for semester at Gemini

GS Fast Turnaround Time Queue Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2023B-FT-101 Davis US IR Imaging of SN 2023emq: The first dusty SN Ibn in a decade Flamingos2 3.28
Execution Status: Dates Taken:
20230729
Completion Status:
40%
GS-2023B-FT-102 Tan CA Is 2002 MS4 a C-type asteroid lodged in the trans-Neptunian region? GMOS-S 0.70
Execution Status: Dates Taken:
Completion Status:
0%
GS-2023B-FT-103 Seccull US Completing the Optical Reflectance Spectrum of Charon GMOS-S 1.89
Execution Status: Dates Taken:
Completion Status:
0%
GS-2023B-FT-104 Sestito CA The oldest and most metal-poor remnants of the Magellanic Stellar Stream GHOST 2.46
Execution Status: complete Dates Taken:
20231208 20231209
Completion Status:
100%
GS-2023B-FT-105 Langeveld US Diving into the Ultra-Hot Atmosphere of HAT-P-70 b with GHOST GHOST 5.75
Execution Status: complete Dates Taken:
20231216
Completion Status:
100%
GS-2023B-FT-106 Kim US Probing Accretion and Disk Wind of Two Photoevaporating Protoplanetary Disks in NGC 1977 GHOST 3.10
Execution Status: complete Dates Taken:
20231213
Completion Status:
100%
GS-2023B-FT-107 Bolin US Testing the surface composition and activity-driving mechanism of Tianwen-2 spacecraft mission target 311P/(2013 P5) PANSTARRS GMOS 1.13
Execution Status: Dates Taken:
Completion Status:
0%
GS Fast Turnaround Time Queue Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2023B-FT-201 Tan US Revealing the Stellar Content in an supermassive high-pressure Infrared Dark Cloud Flamingos2 4.70
Execution Status: Dates Taken:
20230924 20230925 20231001
Completion Status:
72%
GS-2023B-FT-202 Wei US Pilot Observation of Westerlund 1 To Probe Star Formation From Kinematics with IGRINS Visitor 1.51
Execution Status: Dates Taken:
Completion Status:
0%
GS-2023B-FT-203 Lim KR GHOST dual target observation of a wide binary associated with Gaia-Enceladus GHOST 1.38
Execution Status: complete Dates Taken:
20231210
Completion Status:
100%
GS-2023B-FT-204 Farina US A pilot for the study of the high-redshift Lyman-alpha forest with GHOST GHOST 3.50
Execution Status: complete Dates Taken:
20231214 20231218
Completion Status:
100%
GS-2023B-FT-205 Choi US A Comprehensive Chemical Abundance Study of Thorne-Zytkow Object Candidate HV 2112 GHOST 3.75
Execution Status: complete Dates Taken:
20231210
Completion Status:
100%
GS-2023B-FT-206 Venn CA Confirming the globular cluster origin of the C-19 stream GHOST 2.04
Execution Status: complete Dates Taken:
20231212
Completion Status:
100%
GS-2023B-FT-207 Cerny US Detailed Chemical Abundances in the DELVE 2 Ultra-Faint Dwarf Satellite of the LMC GHOST 3.18
Execution Status: complete Dates Taken:
20231211 20231213
Completion Status:
100%
GS-2023B-FT-208 Huyan US Verifying Claims of a Super Metal-rich Galaxy ~1 Billion Years after the Big Bang with Gemini/GHOST GHOST 7.40
Execution Status: Dates Taken:
20231214 20231219
Completion Status:
37%
GS-2023B-FT-209 Sterling US A GHOSTly View of Heavy Element Nucleosynthesis in the Metal-Poor Planetary Nebula M 1-9 GHOST 2.12
Execution Status: complete Dates Taken:
20231209
Completion Status:
100%
GS-2023B-FT-210 Bandyopadhyay US Probing Stellar Abundance Variations in NGC 2298 to Unravel the Origins of the R-process Among its Multiple Stellar Populations GHOST 6.84
Execution Status: Dates Taken:
20231212 20231214 20231215 20231216 20231217
Completion Status:
83%
GS-2023B-FT-211 Cloutier CA Using GHOST to trace the formation histories of hot Jupiters around M dwarfs GHOST 5.42
Execution Status: Dates Taken:
Completion Status:
0%
GS-2023B-FT-212 Fragkou BR Confirming the association of the planetary nebula NGC 2818 with the open cluster NGC 2818A GHOST 2.38
Execution Status: complete Dates Taken:
20231209 20231210
Completion Status:
100%
GS Fast Turnaround Time Queue Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2023B-FT-301 Placco US The ancient Milky Way through the most Gaia BP/RP metal-poor stars GHOST 2.25
Execution Status: complete Dates Taken:
20231211 20231212
Completion Status:
100%