Overview
Time available on each of Gemini North and South is distributed according to the Observatory participants' shares. Engineering time is reserved each semester; this includes engineering time in the queue, instrument performance monitoring, engineering time to accommodate visiting instrumentation, and instrument commissioning. Any unused engineering time is returned to science. The science time includes time used for all Observing Modes, including standard semester programs (this call), Large and Long programs, Fast Turnaround programs, and Director's Discretionary time. The estimated time available for each participant and host institution is shown below.
Gemini North 2025B
-
56 nights (~ 30%) are reserved for engineering, this includes: 35 nights of planned engineering shutdown (A&G plus CEM-2 testing), 6 nights of engineering time in the queue, GNIRS recommissioning, GPP XT testing, GPI-2 (10 nights, provisionally), instrument performance monitoring, engineering time to accommodate visiting instrumentation, and instrument maintenance tasks.
-
128 nights are available for science, which amounts to ~70% of the total time available.
-
The science time in 2025B also includes:
- 5.5 nights for DD time,
- 1.0 nights for the ‘Alopeke/Zorro instrument team, in exchange for community use of ‘Alopeke,
- 3.8 nights for the MAROON-X instrument team, in exchange for community use of MAROON-X.
-
The Table below shows the distribution of the time available per participant.
Participant | Estimated Science Time Available (hours) | Time Reserved for Fast Turnaround programs (hours) [A] | Time Contributed to Large and Long Programs (hours) [B] | Other Pre-committed Time (hours; total excludes any B3 time) |
Estimated Time Available for this Call (hours) [C] |
US | 706.0 | 70.6 | 127.1 | 29.5 | 483.0* |
Canada | 182.4 | 18.2 | 32.8 | 0 | 132.4** |
Argentina | 20.7 | 2.0 | 0 | 0 | 18.7 |
Brazil | 65.6 | 6.6 | 0 | 0 | 59.5 |
Korea | 70.7 | 3.5 | 0 | 0 | 67.7 |
Univ. of Hawaii (host) | 123.3 | 0 | 0 | 0 | 123.3 |
[A] - Up to 10% of the available time is contributed by all participants, not including the host institution (University of Hawaii), to the Fast Turnaround program.
[B] - Up to 20% of the available time is contributed by the United States, and Canada, to the Large and Long Programs pool. This is not the actual amount of time in US and Canadian Large & Long programs in the semester.
[C] - As this time also includes weather loss and time lost to faults, approximately 80% of this time is allocated to programs during the ITAC process, distributed across Bands 1, 2 and 3.
* This value is an upper limit. The US time available is an estimate that includes deductions for the Gemini Large and Long Programs (estimated time for B semesters), the US Long Term programs, and the US space mission support programs, which are already approved.
** The CA time available includes a deduction for the Gemini Large and Long Programs (estimated time for B semesters).
Gemini South 2025B
-
25 nights (13.6%) are reserved for engineering, this includes: engineering time in the queue, 15 nights of planned engineering shutdown, GPP XT testing, instrument performance monitoring, engineering time to accommodate visiting instrumentation, and instrument maintenance tasks.
- 159 nights are available for science, which amounts to 87.8% of the total time available.
- The science time in 2025B also includes:
- 6.9 nights for DD time,
- 1.0 nights for the ‘Alopeke/Zorro instrument team, in exchange for community use of Zorro,
- 5.0 nights for the GHOST science team.
-
The Table below shows the distribution of the time available per participant.
Participant | Estimated Science Time Available (hours) | Time Reserved for Fast Turnaround programs (hours) [A]* | Time Contributed to Large and Long Programs (hours) [B] | Other Pre-committed Time (hours; total excludes any B3 time) |
Estimated Time Available for this Call (hours) [C] |
US | 883.6 | 88.4 | 159.0 | 88.0 | 548.2* |
Canada | 228.3 | 22.8 | 41.1 | 0 | 164.4** |
Argentina | 25.7 | 2.0 | 0 | 0 | 23.7 |
Brazil | 82.1 | 5.7 | 0 | 0 | 76.3 |
Korea | 88.5 | 4.4 | 0 | 0 | 84.1 |
Chile (host) | 153.0 | 0 | 0 | 0 | 153.0 |
[A] - Up to 10% of the available time is contributed by all participants, not including the host institution (Chile), to the Fast Turnaround program.
[B] - Up to 20% of the available time is contributed by the United States, and Canada, to the Large and Long Programs pool. This is not the actual amount of time in US and Canadian Large & Long programs in the semester.
[C] - As this time also includes weather loss and time lost to faults, approximately 80% of this time is allocated to programs during the ITAC process, distributed across Bands 1, 2 and 3.
* This value is an upper limit. The US time available is an estimate that includes deductions for the Gemini Large and Long Programs (estimated time for B semesters), the US Long Term programs, and the US space mission support programs, which are already approved.
** The CA time available includes a deduction for the Gemini Large and Long Programs (estimated time for B semesters).