Announcements
No results
Papers describing aspects of IGRINS-2:
- IGRINS-2 for Gemini Telescope: Development and early performance, Oh, H. et al. 2024, Proc. SPIE 13096
- Design and development of the IGRINS-2 Control Software as a facility instrument of the Gemini Observatory, Lee, H. et al. 2022, Proc. SPIE 12189
IGRINS-2 System Verification
IGRINS-2 System Verification (SV) process was performed from May to October 2024, providing comprehensive testing of the Gemini Observatory system and operational procedures. This process also aimed to demonstrate the instrument's capabilities across a variety of science cases in preparation for the first open calls for proposals. The SV observing run was completed during July 17-23, 2024, with about 21 hours spent on IGRINS-2 observations. Raw data from the SV run has been publicly available in the Gemini Observatory Archive since mid-August, and the reduced data is also assessible.